My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006749 CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1001
>
2900 - Site Mitigation Program
>
PR0545914
>
ARCHIVED REPORTS_XR0006749 CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 10:27:38 PM
Creation date
8/4/2020 11:15:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006749 CASE 1
RECORD_ID
PR0545914
PE
2950
FACILITY_ID
FA0000421
FACILITY_NAME
DINO MART
STREET_NUMBER
1001
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
1001 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ingestion - Do not induce vomiting Keep victim warm and at rest Get medical attention <br /> Physical Hazards: I hese hazards are primarily associated with onsite equipment and the <br /> general nature of construction work Please refer to the attached Physical Hazard Analysis <br /> Sheets for controls <br /> X Heat X Slip, Trip, Fall X Excavations/Trenches <br /> Cold X Noise X Moving Equipment <br /> ' Rain X Underground Hazards Traffic <br /> Fog Overhead Hazards Other <br /> Level of Protection: ❑ A ❑ B ❑ C ■ D <br /> Modifications: Modifications to levels of protection shall be made by the SSO based on air <br /> monitoring results <br /> Site Entry Procedures: The saes will be entered from East Yosemite Avenue <br /> Site Control Measures: Unauthorized personnel will not be allowed in the work area No <br /> eating, drinking or smoking in the work area The Field Supervisor shall enforce these measures <br /> ' and buddy system, PPE and training requirements for all on site personnel Spills are not <br /> expected to be a concern on the project However, if a spill is to occur, adsorbent materials are <br /> available <br /> ' A tailgate safety meeting will be held by the SSO for all site personnel The safety discussion <br /> will include, in addition to other items in this Health and Safety Plan, the following issues <br /> • Site personnel will execute proper lifting techniques for heavy items The <br /> maximum weight to be lifted by any site personnel should not exceed 60 lbs <br /> • The drill rig shall be inspected prior to operation by the drill crew and SSO <br /> • An exclusion zone shall be secured around the work area <br /> • Fire extinguisher, first aid kit, eye wash, and hospital route map shall be staged for <br /> easy access during drilling activities <br /> • Onsite personnel shall contact the SSO with any Health and Safety issues <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.