Laserfiche WebLink
X if X if Pg X if X if X if requirementNA <br /> not in RWD #t more info cmnts waived (Class <br /> 10 RWD sufficient needed attch'd III only) <br /> c. Buildings <br /> d. Equipment cleaning facilities <br /> 4. Detailed plans and equipment specifications for complian(c <br /> with Gu and vadose zone monitoring of Subchapter 15, Articl4 <br /> 5 Zsee 2550 to 2559). This should include: <br /> a. Declaration of type of monitoring program, 2551(b) <br /> b. Rationale for spatial distribution of monitoring sites, <br /> design of monitoring points, and 'selection of monitoring <br /> equipment <br /> -monitoring system must be designed and certified by a <br /> registered geologist or a registered CE, 2555(b) <br /> c. Hap showing location of proposed monitoring faciliti;::; <br /> d. Drawings and data shooing for each monitoring well: <br /> i. Casing and test hole diameter <br /> ii. Casing material <br /> iii. Depth of each test hole <br /> iv. Site and position.of perforations <br /> v. Method of joining sections of casing <br /> vi. Mature of filter material <br /> vii. Depth and composition of seals <br /> viii. Method and length of time of development <br /> e. Monitoring plan <br /> -see 2555(e) for what plan should contain <br /> f. Drawings and data showing for each vadose tone monitur: <br /> is Type of monitor <br /> t r <br />