My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012670
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1012
>
3500 - Local Oversight Program
>
PR0545948
>
ARCHIVED REPORTS_XR0012670
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:23:44 PM
Creation date
8/4/2020 3:06:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012670
RECORD_ID
PR0545948
PE
3528
FACILITY_ID
FA0005159
FACILITY_NAME
FILL-EM FAST
STREET_NUMBER
1012
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21903024
CURRENT_STATUS
02
SITE_LOCATION
1012 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 1 71 -90 <br /> containing essentially the same information as the chain of custody record with the <br /> addition of any observations about the sample. <br /> Soil samples were delivered to Beckman Environmental Laboratory, a State Certified <br /> hazardous waste testing laboratory, within 48 hours after the samples were collected. <br /> I _ <br /> The temperature was maintained at 4 degrees Celsius in the insulated storage container <br /> prior to delivering to the laboratory. The storage container temperature was recorded <br /> upon delivery at the laboratory. Once the samples were delivered to the laboratory, the <br /> chain of custody was signed by the laboratory indicating that the possession of the <br /> ,.; samples had changed. The soil samples were analyzed within the required 14 day period <br /> following collection. <br /> Ia <br /> i --' GROUNDWATER MONITORING WELL CONSTRUCTION <br /> I <br /> All the groundwater monitoring wells were completed using thread jointed 4 inch <br /> E_ <br /> diameter Schedule 40 PVC casing. No chemicals,glues,or solvents were used in the well <br /> r r construction. The screened portion of the well was 14 feet in length and consisted of <br /> factory perforated 0.020 inch slots. <br /> t , <br /> The slotted pipe was installed within a depth interval of 10 to 24 feet below the ground <br /> f <br /> surface. The water labia is at a depth of approximately 18 feet below the surface. This <br /> placed the top screen perforation approximately 8 feet above the water table. <br /> The bottom of the screen was fitted with a screw on end cap and lowered into the boring <br /> through the hollow stem auger. The remaining casing was assembled as the pipe was <br /> lowered Into the baring through the hollow stem auger. <br /> ' 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.