My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
401
>
4200 – Liquid Waste Program
>
PR0526172
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2020 7:50:28 PM
Creation date
8/5/2020 10:00:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0526172
PE
4242
FACILITY_ID
FA0017710
FACILITY_NAME
ANKA NORTHSTAR
STREET_NUMBER
401
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95336
APN
24130052
CURRENT_STATUS
01
SITE_LOCATION
401 S AIRPORT WAY
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\4200 - Liquid Waste\A\AIRPORT WAY\401\PR0526172\INSPECT CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Guide: Residential AdvanTex" Systems <br /> -t•. t��rs.v.�1`'S'-�'6an-e :shsa'_ir�_r..s;7��..-._..2-�.l �._u:.{..a?.....:' ,... <br /> Step 2a: Before excavating, consider the elevations required <br /> for the tank and AdvanTex pod..The 2" filtrate return line should <br /> be sloped a minimum of 114"per foot. If the filtrate return line MlRimum 1.r <br /> is less than 6'long,provide a minimum of 1.5" total elevation <br /> difference between the outlet of the filter and the inlet of the <br /> RSV.The inlet invert of the RSV usually rests 3.5" above the top <br /> of the tank. (See Appendix 3 on page 20 for a detailed diagram of Y • <br /> component distances and measurements.) <br /> The top of the AdvanTex pod should end up approximately 3" <br /> above finished grade,to allow for settlement and drainage.Take '.r <br /> into account any planned or proposed landscaping that might <br /> affect the finished grade of the system. <br /> Step 2b: Outline an excavation area(with chalk,paint,string., ; <br /> etc.)for both the tank and AdvanTex pod. Excavate the hole for <br /> the tank per the tank manufacturer's recommendations. Make the ' <br /> hole for the AdvanTex pod approximately 12" wider and longer <br /> (at the base of the hole)than the footprint of the AdvanTex pod. <br /> For multipod systems,make sure you have at least 44"between ` <br /> each pod. <br /> Step 2e: Excavate to the proper depths as determined above ' <br /> for proper elevations. Make sure the bottom of the excavation <br /> is free of debris,especially rocks and other sharp objects. If the <br /> bottom of the excavation is uneven or rocky, lay a 3"bed of sand <br /> or pea gravel and compact the material to create an even, smooth <br /> surface. <br /> Step 2d: If your installation calls for a discharge pump basin <br /> (Modes 113 and 3B),you may want to set the pump basin in <br /> the excavation next to the tank. If so, make sure the top of the Jr <br /> PUMP basin matches the levels of the other riser lids and be sure <br /> to orient the pump basin such that the grommets are oriented <br /> correctly. <br /> Step 2e: Follow the tank manufacturer's guidelines for setting ; <br /> the tank. If you are installing the AdvanTex pod over the top of <br /> the tank,follow the tank manufacturer's guidelines for watertight <br /> testing, antiflotation measures,and backfilling before proceeding <br /> with the AdvanTex installation. <br /> i <br /> RIM-ATX-AX-1 0 2004 Orence Systems*INC. <br /> Rev 2.1,OW <br />
The URL can be used to link to this page
Your browser does not support the video tag.