Laserfiche WebLink
I <br /> f the four stress conditions shall be separated by 7 days of The 30-day average volume of the wastewater delivered <br /> i design loading (Section 9.2.2.1). to the system shall be within 100%± 10%of the system's <br /> rated hydraulic capacity. <br /> 9.2.2.2.1 Wash-day stress i <br /> 1 NOTE — All dosing days, except those with dosing j <br /> The wash-day stress shall consist of three wash-days in requirements less than the daily hydraulic capacity,shall be <br /> a'5-day period. Each wash-day shall be separated by a included in the 30-day average calculation. <br /> 24-hour period. During a wash-day,the system shall be <br /> I loaded at times and capacities similar to those delivered 9.2.4 Color,odor,foam, and oily film assessments I <br /> during design loading (Section 9.2.2.1), however during <br /> the first two dosing periods per day, the design loading During the 6-month testing and evaluation, a total of 3 <br /> r. shall include 3 wash loads (3 wash cycles and 6 rinse effluent samples shall be assessed for color, odor, foam, <br /> cycles). and oily film. The assessments shall be conducted on <br /> a effluent composite samples selected randomly during the <br />} 9{2.2.2.2 Working-parent stress first phase of design loading (weeks 1-16), the period of <br /> 1' lii stress loading (weeks 17-23.5), and the second phase <br /> For 5 consecutive days,the system shall be subjected to of design loading (weeks 23.5-26). <br /> a working-parent stress. During this stress, the system <br /> shall be dosed with 40% of its daily hydraulic capacity 9.3 Sample collection <br /> between 6:00 a.m. and 9:00 a.m. Between 5:00 p.m. and <br /> 8:00 p.m., the system shall be dosed with the remaining 9.3.1 General <br /> 60%of its daily hydraulic capacity, which shall include 1 <br /> wash load (1 wash cycle and 2 rinse cycles). 9.3.1.1 A minimum of 96 data days shall be required <br /> during system performance testing and evaluation. No <br /> 9.2.2.2.3 Power/Equipment failure stress <br /> routine service or maintenance shall be performed on the <br /> system whether the time period to achieve the 96 data <br /> The system shall be dosed with 40%of its daily hydraulic days falls within or exceeds 6 months. <br /> capacity between 5:00 p.m. and 8:00 p.m. on the day the <br /> power/equipment failure stress is initiated. Power to.the x•3.1.2 All sample collection methods shall be in <br /> system shall then be turned off at 9:00 p.m. and dosing accordance with APHA's Standard Methods for the <br /> shall be discontinued for 48 hours. After 48 hours, power <br /> Examination of Water and Wastewater unless otherwise <br /> shall be restored and the system shall be dosed over:a 3 specified. <br /> hour period with 60%of its daily hydraulic capacity, which <br /> shall include 1 wash load (1 wash cycle and 2 rinse 9.3.1.3 Influent wastewater samples shall be flow- <br /> cycles). proportional,24-hour composites obtained during periods <br /> of system dosing. Effluent samples shall be flow- <br /> 9.2.2.2.4 Vacation stress proportional,24-hour composites obtained during periods <br /> of system discharge. <br /> 0 the day that the vacation stress is initiated,the system <br /> shall be dosed at 35% of its daily hydraulic capacity 9.3.2 Design loading <br /> between 6:00 a.m. and 9:00 a.m. and at 25% between <br /> 11:00 a.m. and 2:00 p.m. Dosing shall then; be During periods of design loading, daily composite effluent <br /> discontinued for 8 consecutive days (power shall continue samples shall be collected and analyzed 5 days a week., <br /> to be supplied to the system). Between 5:00 p.m. :and <br /> 8:00 p.m.of the ninth day,the system shall be dosed with 9.3.3 Stress loading <br /> 60% of its daily hydraulic capacity, which shall include 3 <br /> ' wash loads (3 wash cycles and 6 rinse cycles). During stress loading, influent and effluent 24-hour <br /> ..i composite samples shall be collected on the day each <br /> it stress condition is initiated. Twenty four hours after the <br /> ! completion of wash-day, working-parent, and vacation <br /> 9.2.3 Dosing volumes stresses, influent and effluent 24-hour composite <br /> 01111120151060 This report may not;be reproduced in whole or in part Page 27 of 46 <br /> Final Report without the expressed written consent of NSF International, April 2002 <br /> � <br />