My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7501
>
4200 – Liquid Waste Program
>
PR0420069
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2020 10:48:16 AM
Creation date
8/5/2020 10:02:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0420069
PE
4242
FACILITY_ID
FA0000107
FACILITY_NAME
FRENCH CAMP APARTMENTS
STREET_NUMBER
7501
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19316052
CURRENT_STATUS
01
SITE_LOCATION
7501 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\4200 - Liquid Waste\E\EL DORADO\7501\PR0420069\INSPECT CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deville Apartmaft '"reatment-Plant <br /> Maintenance Schedule <br /> 02/01/1999 <br /> Routine Maintenance: <br /> Daily tasks: Visually inspect entire plant. This includes inspecting all motors,pumps, <br /> pipes, aeration chambers and settling ponds. Based on this inspection, any <br /> appropriate action will be taken. Such action could' include: <br /> Reduce or increase aeration flow i <br /> Reduce or increase sludge return <br /> Skim solids a d return them to aeration cham—ber - "� <br /> Hose down plant <br /> Repair/replace equipment <br /> Remove excess grease buildup i <br /> Weekly: In addition to the daily tasks, each week the plant is cleaned. This includes: <br /> Hose walls of settling ponds <br /> Clean aeration chamber and settling ponds <br /> Skim solids and return to aeration chamber <br /> �I <br /> Monthly: In addition to the daily and weekly tasks,take PH read1 bing, BOD and <br /> settleability tests. Note: The analytical tests are done' e a <br /> third-party vendor. <br /> Semi-annually: In addition to the daily, weekly,monthly tasks,:'take sample of solid <br /> accumulation in the aeration chamber with sludge tube. If in excess, <br /> have plant pumped. '! <br /> i! <br /> .w <br /> �•�- _, - L: As=needed:=Depending-on-the.plant inspection�and.-testing;.some.ofthe.other;as-needed,,._._—_.e_-N.,� .- <br /> tasks may include: <br /> Remove weeds and/or excess debris <br /> 3 <br /> Pump plant �! <br /> Repair/replace erosion-control devices <br /> Repair/replace equipment <br /> Remove excess grease buildup <br /> Install air diffusers in aeration tubes of aeration chamber <br /> Install wood frame with plastic to trap heat and divert water <br /> I! <br /> I� <br /> 1 <br /> Ii <br /> � s <br />
The URL can be used to link to this page
Your browser does not support the video tag.