My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
12755
>
4200 – Liquid Waste Program
>
PR0420063
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:23:02 AM
Creation date
8/5/2020 10:02:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0420063
PE
4242
FACILITY_ID
FA0000342
FACILITY_NAME
POINT QUEST EDUCATION
STREET_NUMBER
12755
Direction
N
STREET_NAME
STATE ROUTE 88
City
LODI
Zip
95240
APN
06314007
CURRENT_STATUS
01
SITE_LOCATION
12755 N HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers
Supplemental fields
FilePath
\MIGRATIONS\4200 - Liquid Waste\E\HWY 88\12755\PR0420063\INSPECT CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J O A Q U I N Environmental Health Department <br /> Y ._-- <br /> Package Sewage Treatment Plant Inspection Report <br /> Facility Name: Facility Address: Date: <br /> POINT QUEST EDUCATION 12755 N HWY 88 , LODI December 16, 2022 <br /> Notes: <br /> - No odors observed at time of site visit <br /> - Gate locked <br /> -Septic tanks prior to the influent lift station are pumped out every 6 months. The septic tank reportedly remove the majority <br /> of the sludge. No solids observed in the biotower. <br /> -The recirculation pump has been valved off from the biotowers for a long time (years)due to the pump being too strong. <br /> This pump is to be replaced with a smaller inline pump as part of the proposed system upgrade. <br /> - Remove/spray duck weed from pond <br /> - Coleman Engineering is the Certified WWTP Operator for the facility. <br /> -The aeration pump in the pond was operating at time of site visit. <br /> Note: <br /> There is a proposal to upgrade the WWTP including replacement of pumps, making repairs to the diffuser nozzles on top of <br /> the tower, a new flow meter, and a new SCADA system Please contact the EHD at 209468-3420 to obtain a permit <br /> application and fee for an engineered commercial system repair prior to commencing work. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT END'S CURRENT HOURLY RATE <br /> Received by: Date: <br /> � December 16, 2022 Inspector: Inspector Phone: <br /> Printed Name and Title: FRANK GIRARDI, Senior REHS (209)616-3044 <br /> Phil Godman, Maintenance Manager <br /> FA0000342 PR0420063 SCO01 12/16/2022 <br /> EHD 42-06 Rev.04/07/2022 Page 2 of 2 Package Sewage Treatment Plant OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.