My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_RPTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
3919
>
4200 – Liquid Waste Program
>
PR0505961
>
ARCHIVED REPORTS_RPTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2020 9:25:24 AM
Creation date
8/5/2020 10:02:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
RPTS
RECORD_ID
PR0505961
PE
4242
FACILITY_ID
FA0007111
FACILITY_NAME
FRENCH CAMP GOLF COURSE
STREET_NUMBER
3919
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
20103014
CURRENT_STATUS
01
SITE_LOCATION
3919 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\4200 - Liquid Waste\F\FRENCH CAMP\3919\PR0505961\RPTS.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Executive Officer. In addition, the discharger shall provide the _ <br /> results of any sludge analyses as specified by the RWQCB's <br /> Executive Officer. <br /> b. The discharger shall provide safeguards to electric power failure as <br /> follows; <br /> (1) The discharger, within ninety (90) days of the effective date <br /> Of this Order, shall submit to the appropriate RWQCB for <br /> approval a description of the existing safeguards provided to <br /> assure that; should there be reduction, loss, -or failure of <br /> electric power, the discharger shall comply with the terms <br /> and conditions of its Order.- Such safeguards may include <br /> alternate power sources, standby generators,'retention ! <br /> capacity, operating.procedures, or other means. A <br /> description of the-safeguards provided shall include an <br /> analysis. of the frequency, duration, and impact of power <br /> failures experienced over the past five years or from time of <br /> startup, whichever is shorter, on effluent quality and"on the <br /> capability of the discharger to comply with the terms and <br /> conditions of the Order. The appropriate RWQCB shall <br /> determine whether the safeguards are adequate. <br /> (2) Should the RWQCB not approve the existing safeguards, <br /> the discharger, within ninety (90) days of having been <br /> advised by the appropriate RWQCB that the existing <br /> safeguards are inadequate, shall provide to'the RWQCB a <br /> schedule of compliance for providing safeguards such that in <br /> the event of reduction, loss, or failure of electric power,'the <br /> permittee will comply with the terms and conditions of this- <br /> Order. The <br /> hisOrder. .The schedule of compliance, upon approval of the <br /> appropriate RWQCB's Executive Officer, shall mbecome a <br /> condition of this Order as it applies to the specific . <br /> discharger. <br /> (3) 'If the discharger already has an approved plan(s), the plan <br /> shall be revised and.updated as specified in the plan or <br /> whenever there has been a material change in design or <br /> operation. A revised plan shall be submitted to,the, <br /> appropriate RWQCB within ninety (90) days of the material <br /> change. <br /> 4. For Subsurface Disposal Systems, the Following Additional <br /> Provisions Apply: <br />
The URL can be used to link to this page
Your browser does not support the video tag.