Laserfiche WebLink
-6- _ <br /> d. Any person signing a document.under paragraph.(a).or (b) of this j <br /> provision shall make the following certification: <br /> "i certify under penalty of law that-this document arid all <br /> attachments were prepared under my direction or <br /> supervision in accordance with a system designed to <br /> assure-that qualified-personnel properly gather.and <br /> evaluate the information.submitted. Based on my inquiry . <br /> Of the person or persons who manage the-system or <br /> those.persons directly responsible for gathering the <br /> information, the information submitted is,.to the best of <br /> my knowledge and.belief, true, accurate, and complete. I <br /> am aware that there are significant.penalties for <br /> submitting false information, including the possibility of. <br /> fine and imprisonment for knowing violations." <br /> [CWC 13263, 13267, and 13268] <br /> 3. Monitoring Repoes <br /> a. Monitoring results shall be reported at the intervals specified in the <br /> permit. <br /> b. Mbnitoring results must be reported on a Discharge Monitoring <br /> Report (DMR) form oi• forms approved by the'RWQCB or SVVRCB for <br /> reporting results of monitoring of pollutants and sludge use or <br /> .disposal practices. <br /> c. Calculations for all limitations which-require averaging Of <br /> measurements shall.utilize an arithmetic,mean unless otherwise <br /> specified in this permit. <br /> 4. Elanned Change <br /> The discharger shall tale with the appropriate RWQCB a report of waste <br /> discharge at least 120 days before making any material change or proposed <br /> change in the character, location or volume of the discharge. <br />