My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19690
>
4200 – Liquid Waste Program
>
PR0420602
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:05 PM
Creation date
8/5/2020 10:05:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0420602
PE
4242
FACILITY_ID
FA0018660
FACILITY_NAME
ARBOR MOBILE HOME PARK
STREET_NUMBER
19690
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
01733007
CURRENT_STATUS
02
SITE_LOCATION
19690 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\4200 - Liquid Waste\N\HWY 99\19690\PR0420602\INSPECT CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> o " c DIRECTOR <br /> 2.• G <br /> 600 East Main Street Donna Heran, REHS <br /> (n: ` Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> Robert McClellon,REHS <br /> Jeff Carruesco, RENS,RDI <br /> �q�iFQ• ri�P Website: www.sjgov.org/ehd KaseyFoley, REHS <br /> Phone: (209)468-3420 Linda Turkatte, REHS <br /> Fax: (209)464-0138 <br /> February 18, 2011 <br /> Newport Pacific Capital Company <br /> Arbor Mobile Home Park <br /> 17300 Red Hill Avenue #280 <br /> Irvine, CA 92714 <br /> SUBJECT: Bi-Annual Inspection conducted at 19690 N. Hwy 99, Acampo, CA <br /> WasteWater Treatment Plant <br /> Inspection Date: February 18, 2011 <br /> Permit I.D.: PT0000215 <br /> Record I.D.: PR0420602 <br /> A bi-annual inspection was conducted on February 18, 2011 at the above referenced <br /> wastewater treatment plant and the following was observed and noted: <br /> 1. The gate leading into the wastewater treatment plant located at the southeast side <br /> entrance to the facility was locked and secured upon inspection this date February 18, <br /> 2011. Entrance was gained at the southeast gate. It was noted and observed that the <br /> south main PG&E easement gate was secured and locked. All gates leading to the <br /> wastewater treatment plant are to remain locked to prevent unlawful entry and to <br /> mitigate the risk of human and animal injury, or death by drowning. Only personnel <br /> responsible for the operation and maintenance of the facility should have access. <br /> Continue oversight to ensure that all gates are secured. <br /> A man-hole cover was covering the main inlet tank located at the north entrance of the <br /> wastewater treatment plant. The manhole cover is to remain over the hole at all times <br /> unless staff or authorized personnel is conducting routine operations and maintenance <br /> and is present. <br /> 2. The yard area(s) were free of debris and appeared to be well maintained. <br /> 3. Weeds throughout the facility require minimal abatement. Maintain weed control on a <br /> routine basis. Correct on a continuous basis. <br /> 4. Meters have been installed and are being maintained to monitor effluent at outlet <br /> valves to measure amounts of effluent being discharged into the series of aerators. <br /> Seepage pits were added to the plant and the systems are alternated on a routine <br /> basis between the old and new pits. There are a series of three valves which <br /> distribute effluent through the valves to a sequence of leach fields. The leach field <br /> distribution is switched on a routine basis. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.