Laserfiche WebLink
Shadow Lakes Mobile Home Park, LLC c e <br /> 5100 N. Hwy 99 <br /> Stockton, CA 95212 <br /> February 19, 2011 <br /> Central Valley Regional RECEIVED <br /> Water Quality Control Board MAR 0 3 2011 <br /> 11020 Sun Center Drive #200 <br /> Rancho Cordova, CA 95670-6114 ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> SHADOW LAKES WWTP MONTHLY REPORT FOR JANUARY 2011 <br /> The attached report represents the monthly reporting data for the Shadow Lakes wastewater <br /> facility. <br /> Average daily flow for the month indicated 38,036 gallons per day. <br /> During the month, 2,500 gallons of sludge was removed from the plant. All waste activated <br /> sludge was aerobically digested and decanted to reduce volume and stored until tanks are full. <br /> Exceptions/Violations <br /> No exceptions for January. <br /> Calibration Log <br /> Shadow Lake does not use any analytical instruments that require calibration for the reporting of <br /> waste discharge requirements. All analysis is performed by a certified laboratory. <br /> "I certify under penalty of law that I have personally examined and am familiar with the <br /> information submitted in this document and all attachments and that, based on my inquiry of the <br /> those individuals immediately responsible for obtaining the information, 1 believe that the <br /> information is true, accurate, and complete. I am aware that there are significant penalties for <br /> submitting false information, including the possibility offine and imprisonment. " <br /> If you have any questions regarding this report or the operation of the Shadow Lakes wastewater <br /> facility, please call the Mike Money, Park Manager, at (209) 931-4198. <br /> Mike Money <br /> Facility Manager <br /> cc: Mr. Rodney Estrada, San Joaquin County Environmental Health Department, Stockton <br /> Attachments: Monthly Self-Monitoring Report <br /> Laboratory Data- FGL Environmental <br />