Laserfiche WebLink
Hr-Ut:1VCU es- <br /> MAR 28 2011 ' )kJ ��"' <br /> Shadow Lakes Mobile Home Park, LLC <br /> ENVIRONMENTAL HEALTH 5100 N. Hwy 99 <br /> PERMIT/SERVICES Stockton, CA 95212 <br /> March 19, 2011 <br /> Central Valley Regional <br /> Water Quality Control Board <br /> 11020 Sun Center Drive #200 <br /> Rancho Cordova, CA 95670-6114 <br /> SHADOW LAKES WWTP MONTHLY REPORT FOR FEBRUARY 2011 <br /> The attached report represents the monthly reporting data for the Shadow Lakes wastewater <br /> facility. <br /> Average daily flow for the month indicated 36,341 gallons per day. <br /> During the month, 12,500 gallons of sludge was removed from the plant. All waste activated <br /> sludge was aerobically digested and decanted to reduce volume and stored until tanks are full. <br /> Exceptions/Violations <br /> No exceptions for February. <br /> Calibration Log <br /> Shadow Lake does not use any analytical instruments that require calibration for the reporting of <br /> waste discharge requirements. All analysis is performed by a certified laboratory. <br /> "I certify under penalty of law that 1 have personally examined and am familiar with the <br /> information submitted in this document and all attachments and that, based on my inquiry of the <br /> those individuals immediately responsible for obtaining the information, I believe that the <br /> information is true, accurate, and complete. I am aware that there are significant penalties for <br /> submitting false information, including the possibility of fine and imprisonment. " <br /> If you have any questions regarding this report or the operation of the Shadow Lakes wastewater <br /> facility, please call the Mike Money, Park Manager, at(209) 931-4198. <br /> Mike Mone <br /> Facility Manager <br /> cc: Mr. Rodney Estrada, San Joaquin County Environmental Health Department, Stockton <br /> Attachments: Monthly Self-Monitoring Report <br /> Laboratory Data- FGL Environmental <br />