Laserfiche WebLink
• A dosing pump will be equipped with three float switches to activate the pumps <br /> and provide a high level alarm as an indicator of pump failure. <br /> • A totalizing flow meter will be installed on the outlet of the treatment unit. A <br /> remote readout will be provided to monitor output of the treatment unit. <br /> • All pressurized lines leading to the MicroSeptec treatment units must be a <br /> minimum of 2 inches in diameter. All gravity drain lines must be a minimum of 4 <br /> inch diameter. Effluent lines from the MicroSeptec treatment unit to the filter bed <br /> must be I and one half inch diameter minimum. <br /> • Provisions will be made in the filter bed area for soil sampling and measurement <br /> of liquid level. <br /> • The site is not in the 100 year flood plain. No restraint is required to prevent tank <br /> floating. <br />