Laserfiche WebLink
1 <br /> I r� <br /> 3.8 Elevation Survey <br /> Following well installation, the top of each well casing will be permanently marked for use <br /> as reference point during water level measurements The reference point at each well will <br /> then be surveyed for elevation with the same benchmark as that for the existing monitoring <br /> wells <br /> 3.9 Report Preparation <br /> Upon completion of the field work and receipt of the laboratory analytical data, BRE will <br /> prepare an investigation report discussing field activities and presenting the results of the <br /> analyses The report will be prepared by, or under the direction of a California-registered <br /> Civil Engineer experienced in underground tank leak investigations <br /> 3.10 Time Schedule <br /> BRE can be prepared to initiate this project within two weeks of your approval Our time <br /> to complete the field investigation and submit the final report will be approximately six <br /> weeks from the date the work is initiated <br /> If you have any questions or need additional information, please call me at (904) 730- <br /> lie 6777 <br /> Sincerely, <br /> BROWN&ROOT ENVIRONMENTAL <br /> Richard A Roberts <br /> Site Manager/Engineer <br /> Attachments <br /> Table 1 - Summary of Soil Analytical Results <br /> Table 2 - Summary of Groundwater Elevation Data and Groundwater Analytical Results <br /> Figure 1 - Site Plan and Proposed Bonng/Well Locations <br /> Figure 2 - Sal Analytical Results (11 - 11 5'feet b1s) <br /> Figure 3 - Soil Analytical Results (16 - 16 5 feet bis) <br /> Figure 4 - Soil Analytical Results (20 - 215 feet bis) <br /> Figure 5 -Propose&Sal Sampling Locations <br /> E Appendix A'- Site Specific Health and Safety Pian <br /> 1 Appendix B - BRE Standard Operating Procedures <br /> !I <br /> cc B Cobb, E=Z'Serve <br /> I <br /> W Kelly, BRE <br /> I I <br /> I 1 f i i <br /> I 1 1 I i <br /> I 'A <br /> BRE-FL AX196-194/MY41-! ! <br /> r <br />