My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006611
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1012
>
3500 - Local Oversight Program
>
PR0545948
>
ARCHIVED REPORTS_XR0006611
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 10:18:52 PM
Creation date
8/5/2020 3:57:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006611
RECORD_ID
PR0545948
PE
3528
FACILITY_ID
FA0005159
FACILITY_NAME
FILL-EM FAST
STREET_NUMBER
1012
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21903024
CURRENT_STATUS
02
SITE_LOCATION
1012 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
using either a centrifugal pump connected to a dedicated Wattera pump or a pre-cleaned <br /> . submersible pump Temperature, pH, and specific conductance of the purge water will be <br /> monitored during the purging process at regular intervals Purging will cease when the <br /> monitored parameters have stabilized (three consecutive readings not varying by more than <br /> 10-percent) and a minimum of three well volumes have been purged <br /> In the event a well dues out dunng purging, the well will be allowed to recover to <br /> 80-percent of it's original well volume, or for 24-hours, whichever is less, prior to collecting <br /> a groundwater sample. <br /> Groundwater Monitoring Well Sampling <br /> Once a well has been successfully purged a groundwater sample will be collected using <br /> a disposable polyethylene bailer connected to clean nylon or polyethylene cord. The bailer will <br /> be lowered slowly into the water to avoid agitation of the sample A portion of the sample will <br /> be placed in a container and the monitoring parameters will be recorded The remaining <br /> portion of the sample will be transferred from the bailer to the appropnate, laboratory supplied <br /> sampling bottles, using a bottom emptying device. Containers for volatile organic analyses will <br /> be filled completely, leaving a positive meniscus, so no airspace remains in the vial after <br /> sealing. <br /> The sample bottles will be labeled with the well idenufication (i.e MW-1, MW-2, etc), <br /> date and time of the sample collection, the field technicians initials, fob number, analyses to <br /> be performed, and other relevant information Samples will immediately be placed in an <br /> insulated cooler containing blue ice. The samples will be maintained at approximately 4°C <br /> until reaching the analytical laboratory <br /> Laboratory Analysis <br /> Samples will be shipped, under appropriate chain-of-custody procedures, to SPL <br /> Laboratory in Houston, Texas, within 48-hours following collection SPL Laboratory is <br /> certified by the State of California for performing the requested analyses. Samples will be <br /> analyzed for total petroleum hydrocarbons as gasoline (TPHg), diesel fuel, (TPHd), and <br /> benzene, toluene, ethylber zene, and xylene isomers, following Environmental Protection <br /> Agency Methods 5030, 8015 modified, and 8020. Samples will be analyzed on a standard two <br /> weep turn-around time <br /> QA/QC Procedures <br /> ' <br /> Instrument cal ration Equipment used to monitor groundwater parameters will be <br /> calibrated pnor to beginning purging at the site Monitoring equipment will be calibrated <br /> following the manufactures instructions using laboratory grade'standards. I <br /> I Equipment Decon minatzon. Non-disposable and Inon-dedicated sampling equipment <br /> Iwill be cleaned prior to use and between uses in each well. Downhole'f equipment will Ibe <br /> I � I <br /> I I I <br /> 'I Ir <br /> 'II f I k1l ISI` iIl'f 'II11 i <br /> II i{ I I' A1,, � I <br /> ,E <br />
The URL can be used to link to this page
Your browser does not support the video tag.