My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006616
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1012
>
3500 - Local Oversight Program
>
PR0545948
>
ARCHIVED REPORTS_XR0006616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 10:22:59 PM
Creation date
8/5/2020 4:00:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006616
RECORD_ID
PR0545948
PE
3528
FACILITY_ID
FA0005159
FACILITY_NAME
FILL-EM FAST
STREET_NUMBER
1012
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21903024
CURRENT_STATUS
02
SITE_LOCATION
1012 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
leve} All screens and casings used will be in a contaminant-free condition when placed in the <br /> ground No thread lubrication shall be used, other than teflon tape or distilled water, during <br /> the connection of individual lengths of screened and solid well casing Screen shall not be <br /> placed in a borehole that creates hydraulic interconnection of two or more distinctly separate <br /> aquifer units. Screen slot size will be chosen to be compatible with the encountered aquifer <br /> materials. The screen slot size will be chosen to retain a high percentage of the filter pack or <br /> natural formation. The remainder of the well casing, above the screened interval, shall be of <br /> solid riser casing. A sand pack shall be placed in the remammg anular space surrounding the <br /> well casing to a minimum of 1 foot above the screened interval. Sand pack shall not be placed <br /> such that it interconnects two or more distinctly separate aquifer units. Sand pack shall be <br /> chosen to be compatible with both the aquifer materials and the screen slot size. Sand pack <br /> shall consist of clean, washed, kiln dried silica sand. A miumurn 1-foot thick bentonite pellet <br /> or bentonite slurry seal shall be placed above the sand pack. All bentomte shall be hydrated <br /> by either formation water or steam-distilled water The remaining annular space above the <br /> bentonite seal shall be grouted with a neat cement or bentonite-neat cement mixture and shall <br /> be placed from the top of the bentonite pellet seal to within 6 inches of the top of the well If <br /> used, the bentorute content of the mixture shall not exceed 5 percent by weight Sand pack, <br /> bentonite, and cement seal levels will be confirmed during construction by measuring the <br /> remaining anular space with a calibrated weighted tape If shallow water table conditions <br /> prevail, the screen interval will be placed such that the screen height above the static water <br /> level is reduced and a maximum possible surface seal can be achieved A held boring log and <br /> well construction diagram (Plate A-1) shall be prepared by a representative of HETI for each <br /> well completed Monitoring and extraction wells shall be constructed with CIass-A <br /> cement/bentonite grout or bentonite pellets tremied into position as a base for the well casing if <br /> necessary The well casing will be set within the aquifer according to the proposed function of <br /> the well and the chemistry of the potential contaminants <br /> In the event a monitoring well is required to be installed in an aquifer unit underlying an <br /> i existing, shallower aquifer, the well will be completed in the lower aquifer such that only <br /> water from the lower aquifer is drawn into the well The upper aquifer will be sealed by <br /> installing a steel conductor casing which extends to the base of the shallow aquifer The steel <br /> casing will be trenved into position with an annular neat cement or cement-bentonite grout seal <br /> placed between the outside wall of the casing and the wall of the borehole. The cement grout <br /> will be allowed a ininunnun of 72 hours to set prior to advancing the boring beyond the sealed <br /> conductor casing and into the next aquifer. After 72 hours,the boring will be advanced below <br /> the seal and completed as a well as described above but within the steel conductor casing <br /> The tops of all well casings will be sealed and placed in a vandal resistant, traffic rated box to <br /> prevent entry of surface contamination,unauthorized entry and tampering <br /> Monitoring wells will be surveyed to obtain north-end casing elevations to the nearest± 0 01 <br /> foot Water level measurements will be recorded with an interface probe to the nearest±0 01 <br /> foot and referenced to either a project datum or mean sea level (MSL). A project site datum is <br /> typically chosen such that it will remain in the event the project site undergoes a physical <br /> change as a result of construction or other cultural disturbance Where required, the wells will <br /> be surveyed by a licensed land surveyor relative to the nearest bench mark and relative to mean <br /> sea level Typically, the establishment of a known, on-site reference by a licensed survey, is <br /> enough to allow for the rens ping well top elevations to be determined using a survey level and <br /> prod. Unless directed'otherwise by local regulatory agencies, the well top elevations will be <br /> I established in,this'manner <br /> I , <br /> 3 <br /> i, I <br /> I I <br /> ❑ll I I If�ll I ilhl' rl ' !1,II'lll ill I IV I Ili I IIli,�l I SII!it 'I', II I it � Illli 11 ''�I I II ! li ii I I 'I III I�ill' II� I! fi it IIII i illl'I I ' Ili I i I„ I! <br /> 1 i I <br />
The URL can be used to link to this page
Your browser does not support the video tag.