My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006625
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1012
>
3500 - Local Oversight Program
>
PR0545948
>
ARCHIVED REPORTS_XR0006625
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 10:29:30 PM
Creation date
8/5/2020 4:02:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006625
RECORD_ID
PR0545948
PE
3528
FACILITY_ID
FA0005159
FACILITY_NAME
FILL-EM FAST
STREET_NUMBER
1012
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21903024
CURRENT_STATUS
02
SITE_LOCATION
1012 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 1. 0 INTRODUCTION <br /> ' This report presents the res is of Tank Protect Engineering of <br /> Northern California 's (TPE) subsurface investigation at 1012 West <br /> Yosemite Avenue, Manteca, alifornia (see Figure 1) . The <br /> property is currently owned by the E-Z Serve Petroleum Marketing <br /> ' Company (E-Z Serve) . The purpose of this investigation was to <br /> characterize the subsurface soils and groundwater quality beneath <br /> the property. <br /> This site assessment was authorized by E-Z Serve' s May 1, 1992 <br /> confirmation letter. The investigation was conducted in <br /> ' accordance with the E-Z Serve March 20, 1992 Work Plan and TPE's <br /> subsequent May 15, 1992 Health and Safety Plan. Prior to <br /> implementing the work, both documents were submitted to and <br /> approved by the San Joaquin County Health Services Department <br /> ' (SJCHSD) . <br /> The scope of work completed as a part of this Preliminary Site <br /> ' Assessment Report PSAR includes: 1) a limited review of site <br /> background information; 2) the construction of 3 groundwater <br /> monitoring wells, 3) the collection and laboratory analysis of <br /> selected soil and groundwater samples; 4) determination of <br /> ' groundwater flow direction and gradient beneath the site; and 5) <br /> the preparation of this PSAR summarizing TPE 's findings . <br /> 2 . 0 SITE HISTORY <br /> 5 1 <br /> Background information provided by E-Z Serve documents that the <br /> ' site was formerly a gasoline service station containing three <br /> 10, 000 gallon underground fuel storage tanks. Each tank was of <br /> single walled, steel construction and was installed in 1970. The <br /> general configuration of the site is shown in Figure 2 . On July <br /> 13 , 1989 the tanks were precision tested. The regular leaded <br /> gasoline tank failed the precision tank test. None of the <br /> remaining tanks were precision tested. The facility was <br /> subsequently closed in August 1989 and the tanks and associated <br /> piping removed in January 1991. On January 21, 1991 a <br /> preliminary sods and groundwater investigation was conducted by <br /> Associated Soils Analysis (ASA) . ASA drilled and installed three <br /> monitoring wells (MW-1 through MW-3) . Details of this <br /> preliminary study were submitted to SJCHSD in a report dated <br /> April 1, 1991. <br /> 3 . 0 SOIL AND GROUNDWATER INVESTIGATION <br /> 3 . 1 Objectives and Scope, of, Work <br /> On May 1; 1992 TPE was contracted by E-Z ,Serve` to drill `and, <br /> ' install 31monitoring wells (designated MW-4 , MW-5, ,and MW-6) at <br /> the site. The purposes of this project were 1) to 'help 11 <br /> IIS <br />
The URL can be used to link to this page
Your browser does not support the video tag.