My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012671
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1257
>
3500 - Local Oversight Program
>
PR0545949
>
ARCHIVED REPORTS_XR0012671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:29:22 PM
Creation date
8/6/2020 9:43:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012671
RECORD_ID
PR0545949
PE
3528
FACILITY_ID
FA0003707
FACILITY_NAME
AHMEDS SONS INC
STREET_NUMBER
1257
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
20015015
CURRENT_STATUS
02
SITE_LOCATION
1257 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W+ at.. - y".u"'c--_ +gym. ... q r,.,r...'.v <br /> , s <br /> GeaStrategies Inc. <br /> Gettler-Ryan Inc. <br /> August 23, 1991 <br /> Page 5 <br /> a <br /> SOIL AERATION <br /> Upon receipt of the initial chemical analytical results for stockpiled soil, wl <br /> allowable volume of stockpiled soil was aerated on-site. Soil was spread out on- <br /> site to a thickness of 1 to 2 feet and tumad over with a loader bucket to assist <br /> in the aeration process. Upon completion of the aeration process, a verification <br /> sample composed of 4 subsamples was collected for every 50 cubic yards of <br /> s` <br /> soil aerated. <br /> Soil stockpiles CS-6 and CS-7 representing approximately 100 cubic yards and <br /> soil stockpiles CSX-1 through CSX-7 representing approximately 350 cubic yards <br /> were used to backfill the former UGST excavation. These materials were <br /> backfilled and recompacted by the site construction contractor. <br /> SOIL REMOVAL <br /> s <br /> { Approximately 960 cubic yards of soil were transported to Forward Landfill in <br /> Stoekton, California. Approximately 30 cubic yards of soil containing waste oil <br /> — were transported to Browning Ferris Industries in Livermore, California. <br /> 1 <br /> i <br /> F <br /> i <br /> 3 <br /> i <br /> S <br /> i <br /> —:-. -— _.. - ------------72860I-I- <br /> t <br /> t <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.