My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006221
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1257
>
3500 - Local Oversight Program
>
PR0545949
>
ARCHIVED REPORTS_XR0006221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 10:11:52 PM
Creation date
8/6/2020 9:55:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006221
RECORD_ID
PR0545949
PE
3528
FACILITY_ID
FA0003707
FACILITY_NAME
AHMEDS SONS INC
STREET_NUMBER
1257
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
20015015
CURRENT_STATUS
02
SITE_LOCATION
1257 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Work Plan For A Limited Subsurface Investigation - Chevron Service Station#9-1848 <br /> June 26, 1997 <br /> samples from the borings and all groundwater samples will be analyzed for TPHg <br /> by Environmental Protection Agency (EPA) Method 8015 (Modified), and for f <br /> gasoline constituents benzene, toluene, ethylbenzene, total xylenes (BTEX) and <br /> methyl t-butyl ether (MTBE) by EPA Method 8020. <br /> Task 4. Report Preparation <br /> Following receipt and analysis of all data, a report will be prepared which <br /> summarizes the procedures and findings associated with this investigation This <br /> report will be submitted to Chevron for their use and distribution <br /> PROJECT STAFF <br /> Mr. Stephen J Carter, a Registered Geologist in the State of California (R G No 5577), <br /> will provide technical oversight and review of the work Mr Greg Gurss, Project <br /> Manager, will supervise implementation of field and office operations GR employs a staff <br /> of geologists, engineers, and technicians who will assist with the project <br /> SCHEDULE <br /> Implementation of the proposed scope of work will commence upon receipt of regulatory <br /> approval <br /> • <br /> 639201-2 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.