Laserfiche WebLink
• Work Plan For A Limited Subsurface Investigation - Chevron Service Station#9-1848 <br /> June 26, 1997 <br /> samples from the borings and all groundwater samples will be analyzed for TPHg <br /> by Environmental Protection Agency (EPA) Method 8015 (Modified), and for f <br /> gasoline constituents benzene, toluene, ethylbenzene, total xylenes (BTEX) and <br /> methyl t-butyl ether (MTBE) by EPA Method 8020. <br /> Task 4. Report Preparation <br /> Following receipt and analysis of all data, a report will be prepared which <br /> summarizes the procedures and findings associated with this investigation This <br /> report will be submitted to Chevron for their use and distribution <br /> PROJECT STAFF <br /> Mr. Stephen J Carter, a Registered Geologist in the State of California (R G No 5577), <br /> will provide technical oversight and review of the work Mr Greg Gurss, Project <br /> Manager, will supervise implementation of field and office operations GR employs a staff <br /> of geologists, engineers, and technicians who will assist with the project <br /> SCHEDULE <br /> Implementation of the proposed scope of work will commence upon receipt of regulatory <br /> approval <br /> • <br /> 639201-2 4 <br />