My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006472
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1257
>
3500 - Local Oversight Program
>
PR0545949
>
ARCHIVED REPORTS_XR0006472
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 10:23:33 PM
Creation date
8/6/2020 10:03:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006472
RECORD_ID
PR0545949
PE
3528
FACILITY_ID
FA0003707
FACILITY_NAME
AHMEDS SONS INC
STREET_NUMBER
1257
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
20015015
CURRENT_STATUS
02
SITE_LOCATION
1257 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr Mike Infurna <br /> A M B R I A August 30, 2005 <br /> Maximum Groundwater Concentrations <br /> Maximum historical TPHg concentration 5,300 gg/L(C-2, 812211996) <br /> Maximum historical benzene concentration 100 pg/L(C-2, 4/17/1992) <br /> Maximum historical MTBE concentration 2,100 µg/L(C-2, 08/2211996) <br /> Current Groundwater Concentrations(7/23/05) <br /> Ethyl- <br /> Well ID TPHg Benzene Toluene benzene Xylene MTBE <br /> C-1 <50 <0 5 <0 5 <0 5 <0 5 0 7 <br /> C-2 86 <0 5 <0 5 <0 5 <0 5 59 <br /> • C-3 <50 <0 5 <0 5 <0 5 <0 5 <0 5 <br /> Hydrocarbon Trends and Distribution <br /> No benzene has been reported in any well during the past four quarters TPHg is only reported in C-2 <br /> at 86µg/L Methyl tert-butyl ether(MTBE)was detected in monitoring wells C-1 and C-2 at 0 7 pg/L <br /> and 59 µg/L,respectively <br /> ANTICIPATED FOURTH QUARTER 2045 ACTIVITIES <br /> • G-R will collect groundwater samples from the site groundwater monrtonng wells and <br /> prepare a monitoring report, <br /> • Cambria will prepare a quarterly status report,and <br /> • Upon receipt of access agreements, Cambria will proceed with obtaining the proper <br /> drilling permits and install three soil bonngs with depth discrete groundwater samples for <br /> vertical and lateral groundwater delineation <br /> • <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.