Laserfiche WebLink
b <br /> x <br /> Remedial Activities- First Quarter 1995 <br /> SECOR's "Final Remediation Plan", recommending vapor extraction for remediation of the site's <br /> hydrocarbon-impacted soils, was submitted to the PHS/EHD in September 1994 and subsequently <br /> approved in early October 1994 SECOR is re-evaluating vapor abatement equipment, obtaining <br /> appropriate permits, and soliciting contractor bids for installation of the remediation system We <br /> estimate that the system will be installed during the third quarter of 1995 as soon as an installation <br /> subcontractor can be obtained <br /> If you have any questions regarding this project, please feel free to phone me at (206) 286-4495 If I am <br /> unavailable, Kevin Murphy may be able to assist you <br /> Sincerely, <br /> Time Oil Co <br /> Anastasia E Duarte <br /> Environmental Toxicologist <br /> cc Ms Elizabeth Thayer <br /> California Regional Water Quality Control Board <br /> iui95l4167121 doe <br />