Laserfiche WebLink
. Remedial Activities- First Quarter 1995 <br /> SECOR's "Final Remediation Plan", recommending vapor extraction for remediation of the site's <br /> hydrocarbon-impacted soils, was submitted to the PHS/EHD in September 1994 and subsequently <br /> approved in early October 1994 SECOR has since been evaluating vapor abatement equipment, <br /> obtaining appropriate permits, and soliciting contractor bids for installation of the remediation system <br /> Please find enclosed a copy of SECOR's "Soil Vapor Extraction and Treatment System Design <br /> Specifications" This report is submitted for informational purposes only and is intended to provide you <br /> with the technical provisions relating to the installation of the vapor extraction system We estimate that <br /> the system will be installed during the second quarter of 1995 <br /> If you have any questions regarding this project, please feel free to phone me at (206) 286-4495 If I am <br /> unavailable, Kevin Murphy may be able to assist you <br /> Sincerely, <br /> Anastasia E Duarte <br /> Environmental Toxicologist <br /> cc Ms Elizabeth Thayer <br /> California Regional Water Quality Control Board <br />�� aPr95/4187120 doc <br />