My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005987
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
3500 - Local Oversight Program
>
PR0545950
>
ARCHIVED REPORTS_XR0005987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 2:12:40 AM
Creation date
8/6/2020 10:53:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005987
RECORD_ID
PR0545950
PE
3528
FACILITY_ID
FA0003739
FACILITY_NAME
Colonial Energy CE 40134 (DBA Power Mart)
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
02
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> Vapor extraction is the least expensive option, it can achieve rapid results, and <br /> it will not disrupt the business currently in operation <br /> Based on the results of groundwater samples collected to date, SEACOR's report <br /> did not recommend the installation and operation of a groundwater cleanup system <br /> Time Oil agrees with this recommendation Quarterly monitoring will continue <br /> during site cleanup to assure that hydrocarbon concentrations in groundwater do <br /> not exceed action levels <br /> Selection of Remedial Technology <br /> Vapor extraction is the proposed remedial technology to achieve cleanup of <br /> hydrocarbon-impacted soils beneath the subject site It is estimated that 3 <br /> existing wells (W-1, W-2, and W-4) will be utilized for the proposed vapor <br /> extraction system In addition, horizontal wells may be installed within the <br /> vapor extraction piping trenches to enhance remediation if hydrocarbon-impacted <br /> soils are encountered during system installation Although a radius of influence ' <br /> has not yet been calculated for the existing wells, it is estimated that they <br /> will be sufficient for cleanup of the impacted soils Should it be determined <br /> that additional wells are required, they will be installed at a later date <br /> The proposed system will initially utilize an internal combustion engine for <br /> vapor abatement, however, once vapor concentrations have reduced sufficiently, <br /> carbon will be used Section 3 in the attached report contains a detailed <br /> description of the proposed remediation system Figure 7 contains a schematic <br /> diagram of the system components , while Figure 8 identifies the proposed piping <br /> layout and location of the equipment compound <br /> Upon your approval of the FRP/CAP, appropriate permits will be obtained and the <br /> proposed remediation system will be installed at the subject site If you have <br /> any questions regarding this project, please feel free to phone me at (206) 286- <br /> 4495 If I am unavailable, Kevin Murphy may be able to assist you <br /> Sincerely,"00AAS4s;e'4 A�- i <br /> 10 <br /> 14 <br /> Anastasia E Duarte <br /> Environmental Toxicologist <br /> cc Ms Elizabeth Thayer <br /> California Regional Water Quality Control Board <br /> . aed\sep94\4167 L16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.