My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012533
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
3500 - Local Oversight Program
>
PR0545950
>
ARCHIVED REPORTS_XR0012533
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 10:07:41 PM
Creation date
8/6/2020 10:57:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012533
RECORD_ID
PR0545950
PE
3528
FACILITY_ID
FA0003739
FACILITY_NAME
Colonial Energy CE 40134 (DBA Power Mart)
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
02
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />' PROFESSIONAL REVIEW <br />' This document has been prepared by Science & Engineering Analysis Corporation (SEACOR) and <br />' has been reviewed by the Principal(s)and/or staff whose seal(s) and signature(s) appear hereon <br />' The data presented in this report are based upon information collected by SEACOR and supplied to <br /> SEACOR by the Client SEACOR has examined and relied upon documents referenced in thus report, <br />' but has not conducted and independent examination of the facts contained in the referenced <br /> materials SEACOR has assumed the genuineness of the documents and that the information <br />' provided in the document is true and accurate SEACOR shall not be responsible for conditions or <br /> consequences ansing from relevant facts that were concealed, withheld or not fully disclosed at the <br />' time the report was prepared The findings, interpretations, recommendations, specifications or <br /> professional opinions are presented, within the limits prescribed by the client, in accordance with <br />' generally accepted professional geologic and engineering practice at the time of preparation There <br /> is no other warranty either expressed or implied <br /> Prepared by Reviewed by <br /> (: � E p75� (611��I <br /> .j ' -� <br />' John E Bower, R E A Paul D Horton R G <br /> ISenior Geologist Principal Hydrogeologist <br /> PAUL D HORTON <br /> No 5435 <br /> "qT 04 <br /> FOF Cp, <br /> TOC t434 FRP SEACOR' <br /> N0005.002 01 i August 17 1994 <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.