My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012674 CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2900 - Site Mitigation Program
>
PR0545951
>
ARCHIVED REPORTS_XR0012674 CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:41:48 PM
Creation date
8/6/2020 11:05:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012674 CASE 1
RECORD_ID
PR0545951
PE
3528
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• :Y'4 § `- - - -N yWin' - -- � app-�., M F, <br /> Gctober 3, 1990 <br /> limited Subsurface Environmental Investigation AvS 3005$-1 <br /> ARCO Service Station No. 6020, Manteca, California <br /> �----- <br /> FIELD WORK AND METHODS <br /> Applied GeoSystems conducted field work at this site in accordance with our Work Plan for <br /> a Limited Subsurface Investigation (Applied GeoSystems, August 2, 1990, and our Site <br /> Safety Plan 30055-IS (July 19, 1990). Applied GeoSystems'standard methods for field work <br /> are described in Appendix A. <br /> -, <br /> Applied GeoSystems was at the site on August 15 and 16, 1990, to observe W-.yne Drilling <br /> of Lincoln. California, drill seven 8-inch diameter soil borings (B-1 through B-7). The <br /> locations of the soil borings are shown on Plate P-2. <br /> The locations of the borings were selected using ARCO's Preliminary Tank Replacement <br /> " -1 was drilled approximately 2-1/2 feet from the edge of <br /> Assessment guidelines. Boring B <br /> the tank area near the fill ends of the three product tanks; borings B-2, B-3, and B-4 were <br /> drilled near tanks T-2 and T-3: boring B-5 was drilled on the south end of tank T-1; and <br /> borings B-6 and B-7 were drilled in the area proposed as the new tank cavity (Plate P-2). <br /> Soil samples were collected during drilling at approximately 5-foot intervals and were <br /> classified according to the Unified Soil Classification System (Plate P-3). Descriptiors of <br /> -- — <br /> materials-_encountered-are-presented in.the..Lngs_of Boring (Plates P-4 through P-11)- e <br /> 5 <br /> ARVA80f GP'eOSy$tefnS <br /> - <br />
The URL can be used to link to this page
Your browser does not support the video tag.