My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005757 CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2900 - Site Mitigation Program
>
PR0545951
>
ARCHIVED REPORTS_XR0005757 CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 2:38:18 AM
Creation date
8/6/2020 11:32:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005757 CASE 2
RECORD_ID
PR0545951
PE
3528
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r - <br /> r ' <br /> . Date October 29,2001 <br /> Quarter 3Q01 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 6020 Address 1711 E Yosermte Ave , Manteca, CA <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person SECOR/Rusty Benkosky <br /> Consultant Project No 077 43345 703 <br /> Primary Agency/Regulatory ID No San Joaquin County Public Health Services(SJCPHS) <br /> Assembly Bill 681 Status Property owned by ARCO <br /> WORK PERFORMED THIS QUARTER (Third Quarter - 2001): <br /> 1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> WORK PROPOSED FOR NEXT QUARTER (Fourth Quarter - 2001): <br /> 1 Prepare quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project Monitoring <br /> Frequency of Groundwater Sampling MW-5 through MW-10 sampled quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> 1s Free Product(FP)Present Onsite No <br /> Current Remediation Techniques Natural attenuation <br /> Approximate Depth to Groundwater 21-22�i ft <br /> Groundwater Flow and Gradient Northwest @ 0 002 ft/ft <br /> DISCUSSION: <br /> Total petroleum hydrocarbons as gasoline(TPHg),benzene,toluene,ethylbenzene,and xylenes(total)were <br /> reported as nondetectable in all six wells sampled this quarter Methyl tert-butyl ether(MtBE),analyzed using <br /> EPA Method 8260B,was reported in MW-6 at a concentration of 2,900 ppb Chemical concentrations are <br /> consistent with analytical data Groundwater elevations across the site decreased by an average of 129 ft <br /> Groundwater flow was to the northwest at an approximate gradient of 0 002 ft/ft <br /> This report presents our understanding of existing conditions at the subject site The conclusions contained herein <br /> are based on the analytical results,and professional Judgment in accordance with current standards of professional <br /> practice, no other warranty is expressed or implied SECOR assumes no responsibility for exploratory borings or <br /> data reported by other consultants or contractors <br />
The URL can be used to link to this page
Your browser does not support the video tag.