Laserfiche WebLink
Site Characterization Work Plan <br /> ABF Freight System,Inc. <br /> Manteca California Pae n <br /> TABLE OF CONTENTS <br /> Page <br /> 1.0 INTRODUCTION........................................................................................... ......................1 <br /> 1 1 Purpose and Project Scope 1 <br /> 1 2 Plan Organization 1 <br /> 2.0 SITE DESCRIPTION AND BACKGROUND.................................................................. 2 <br /> 3.0 REGULATORY REQUIREMENTS AND PERMITS ................................................... 3 <br /> 3 1 Federal Regulations 3 <br /> 3 1 1 UST Closure 3 <br /> 3 1 2 Identification of Hazardous Matenals 4 <br /> 3 13 Transportation and Disposal 4 <br /> 3 2 State of California Regulations 4 <br /> 3 3 Local Requirements 4 <br /> 4.0 PROJECT STAFFING................................................... . ....................................................4 <br /> 4 1 Project Organization 5 <br /> 4 1 1 Project Manager/Site Supenntendent - Steve Essert 5 <br /> 4 12 Laboratory Quality Assurance Officer—Mr John Murphy 5 <br /> 4 2 Subcontractors 5 <br /> 5.0 FIELD ACTIVITIES......................................... ...................................................................6 <br /> 5 1 Introduction 6 <br /> • 52 Regulatory File Review and Receptor Survey 6 <br /> 53 Underground Utility Clearance 6 <br /> 54 Soil and Groundwater Sampling Program 6 <br /> 55 Monitonng Well Construction 7 <br /> 5 6 Monitonng Well Development and Sampling 8 <br /> 5 7 Water Level Measurements and Well Sampling 8 <br /> 5 8 Grouting and Waste Matenals 8 <br /> 5 9 Report Preparation 8 <br /> LIST OF APPENDIX <br /> APPENDIX I SITE DRAWINGS <br /> APPENDIX 2 SITE SAFETY AND HEALTH PLAN <br /> APPENDIX 3 UST UNAUTHORIZED RELEASE REPORT <br /> APPENDIX 4 UST CLOSURE REPORT <br /> N 1PROJECTS\32721Plans and ReportslABF Final Site Characterization Work Plan doc 6/23198 <br />