Laserfiche WebLink
. HAZAR16 ALYSIS PAO <br /> FEATURE SAMPLING AND TESTING ANALYZED BYIDATE REVIEWED BY/DATE <br /> PRINCIPLE POTENTIAL RECOMMENDED <br /> STEPS HAZARDS T CONTROLS <br /> Strains and sprains Use the proper tool for the job being performed. <br /> Get assistance if needed. <br /> Aviod twisting/turning while pulling on tools, materials, etc. <br /> Unattended worker "Buddy System" Visual contact will be maintained between personnel <br /> site activities. <br /> Working at elevated Ladders will be secured by top, bottom, and intermediate fastenings <br /> heights as required. <br /> Personnel working at heights of 6 feet or more must be secured with <br /> fall protection (safety belt/lanyard) . <br /> ------------------------------- -------- ----------------------------------------------------------------------------------------- <br /> Soil, water, tank Chemical Wear appropriate PPB (rubber gloves, eye protection, saranax suit if <br /> sampling splash expected, respirator if breathing zone vapors expected) . <br /> Slip/Trip/Fall Steel toed boots; removal of obstacles; daily safety meetings to <br /> update employees on areas of concern. <br /> Tool and Equipment Instructions in proper tool use and maintenance. <br /> ------------------------------- --------------------------------- --------------------------------------------------------------- <br /> Density Testing Contacting Real-time air monitoring will take place. Proper personal protective <br /> contaminated mat'ls clothing and equipment will be utilized. <br /> Good housekeeping will be stressed to sate guard against cross <br /> contamination of surrounding areas and eliminate safety hazards. <br /> All site personnel will practice good personal hygiene. <br /> The work area will be demarcated. All unnecessary personnel will be <br /> kept out of the work area and in an upwind location. <br /> Moving equipment Signal person will assist in posistioning equipment. <br /> Signal person will wear a reflective vest for high visibility. <br /> Noise Hearing protection is mandatory above 85 dBA. <br /> Open excavations Excavations will be backfilled as soon as possible. <br /> Slip, trip, and fall Determine beat access route before transporting equipment. <br /> hazards Good housekeeping, keep work area picked up and clean as feasible. <br /> Continually inspect the work area for slip, trip and fall hazards. <br /> Look before you step, ensure safe and secure footing. <br /> Underground utilities- All underground utilities will be located prior to excavating. � <br />