Laserfiche WebLink
Pacific Gas and "•"a""°`"re.m Peen°""""`"'�°"°.`°'" <br /> E/ec[ric Company" �a"a"""'°BTe"� snr earo.,oar ceoro"Roen�3roa <br /> & se"aamo".cn eases <br /> June 23, 2020 <br /> Tadtlia Hernandez <br /> San Joaquin County <br /> 1810 E. Hazelton Dr. <br /> Stockton, CA 95205 <br /> Ref: Gas and Electric Transmission and distribution <br /> �¢ar Mn Hernadez, <br /> Thank you for submitting 26603 South Hansen Rd - PA-2000063 plans for our review. PG&E <br /> will review the submitted plans in relationship to any existing Gas and Electric facilities within <br /> the project area. If the proposed project Is atljacent/or within PG S.E owned property and/or <br /> easements, we will be working with you to ensure compatible uses and activities near our <br /> facilities. <br /> Attached you will find information and requirements as it relates to Gas facilities(Attachment 7) <br /> and Electric facilities(Attachment 2). Please review these In detail, as it is critical to ensure <br /> your safety and to protect PGB,E's facilities and its existing rights. <br /> Below is additional information for your review: <br /> 1. This plan review process does not replace the application process for PG&E gas or <br /> electric service your project may require. For these requests, please continue to work <br /> with PG&E Service Planning: httos://www.oce.com/en US/business/services/buildina- <br /> and-renovation/overview/overview.Daae. <br /> 2. If the project being submitted is part of a larger project, please include the entire scope <br /> of your project, and not just a portion of it. PGB.E's facilities are to be incorporated within <br /> any CEQA document. PG&E needs to verify that the CEPA document will identify any <br /> required future PGS,E services. <br /> 3. An engineering deposit may be required to review plans for a project depending on the <br /> size, scope, and location of the project and as it relates to any rearrangement or new <br /> installation of PG$E facilities. <br /> Any proposed uses within the PG&E fee strip and/or easement, may include a California Public <br /> Utility Commission (CPUC) Section 857 filing. This requires the CPUC to render approval for a <br /> conveyance of rights for specific uses on PGB.E's fes strip or easement. PG8.E will advise if the <br /> necessity to incorporate a CPUC Section 85tfiling is required. <br /> This letter does not constitute PGSE's consent to use any portion of its easement for any <br /> purpose not previously conveyed. PG6E will provide a project specific response as required. <br /> Sincerely, <br /> Plan Review Team <br /> Land Management <br /> PGScE Gas and Electric Facilities Page 1 <br />