Laserfiche WebLink
Pacific Gas and n•n rsew•w ream Pceai•�a•w•wwa•.=om <br /> E/ec[ric Con[pany �g�a Me�e9eTB�� <br /> March 24, 2022 <br /> Tetltlie Hernandez <br /> County of San Joaquin <br /> 7870 E Hazelton Ava <br /> Stockton, CA 95205 <br /> Ref: Gas and Electric Transmission and Distribution <br /> Dear Teddies Hernandez, <br /> Thank you for submitting the 26603 S Hansen Road plans for our review. PGBE will review the <br /> submitted plans in relationship to any existing Gas and Electric facilities within the project area. <br /> If the proposed project is adjacent/or within PGBE owned property and/or easements, we will be <br /> working with you to ensure compatible uses and activities near our facilities. <br /> Attached you will Fnd information and requirements as it relates to Gas facilities (Attachment 7) <br /> and Electric facilities (Attachment 2). Please review these in detail, as it is critical to ensure <br /> your safety and to protect PGBE's facilities and its existing rights. <br /> Below is additional information for your review: <br /> 7. This plan review process does not replace the application process for PGBE gas or <br /> electric service your project may require. For these requests, please continue to work <br /> with PGBE Service Planning: htt '// /e US/business/services/builtlin - <br /> and-ren ova t i o n/overview/ove rview.Dace. <br /> 2. If the project being submitted is part of a larger project, please include the entire scope <br /> of your project, and not just a portion of it. PGBE's facilities are to be incorporated within <br /> any CEQA document. PGBE Heads to verify that the CEQA document will identify any <br /> required future PGBE services. <br /> 3. An engineering deposit may be required to review plans for a project tlepending on the <br /> size, scope, and location of the project and as it relates to any rearrangement or naw <br /> installation of PGBE facilities. <br /> Any proposetl uses within the PGBE fee strip and/or easement, may include a California Public <br /> Utility Commission (CPUC) Section 857 filing. This requires the CPUC to render approval for a <br /> conveyance of rights for specific uses on PGBE's fee strip or easement. PGBE will advise if the <br /> necessity to incorporate a CPUC Section 857filing is required. <br /> This letter does not constitute PGBE's consent to use any portion of its easement for any <br /> purpose not previously conveyed. PGBE will provide a project specific response as required. <br /> Sincerely, <br /> Plan Review Team <br /> Land Management <br /> PGti�E Gas and Ehctrfc Facilities Page 1 <br />