Laserfiche WebLink
Pacific Gas and <br /> S E/ectiic Company�� <br /> 8. Streets and Roads: Access to facilities must ba maintained at all times. Street lights may ba <br /> allowed in the foe strips) and/or easements) but in all cases must be reviewed by PGB.E for <br /> proper clearance. Roads and utilities should cross the transmission aasament as nearly at right <br /> angles as possible. Road intersections will not be allowed within the transmission easement. <br /> 9. Pipelines: Pipelines may ba allowed provided crossings are held to a minimum and to be as <br /> nearly perpendicular as possible. Pipelines within 25 feet of PGB.E structures require review by <br /> PGB.E. Sprinklers systems may be allowed; subject to review. Leach Felds and septic tanks are <br /> not allowed. Construction plans must be submitted to PGB,E for review and approval prior to the <br /> commencement of any construction. <br /> 70. Signs: Signs ora not allowed except in rare cases subject to individual review by PG8.E. <br /> t 7. Recreation Areas: Playgrounds, parks, tennis courts, basketball courts, barbecue and light <br /> trucks (pickups, vans, etc.) may be allowed; subject to review of plans. Heavy equipment <br /> access to PGB.E facilities is to be maintained at all times. Parking is to clear PG&E structures by <br /> at least 10 feat. Protection of PGS.E facilities from vehicular traffic is to ba provided at <br /> developer's expense ANO to PGB.E specifications. <br /> 12. Construction Activity: Since construction activity will take place near PGB.E's overhead <br /> electric lines, please ba advised it is the contractor's responsibility to be aware of, and observe <br /> the minimum clearances for both workers and equipment operating near high voltage electric <br /> lines set out in the High-Voltage Electrical Safety Orders of the California Division of Industrial <br /> Safety (httos://www.dir.ca.aov/Title8/sb5a2.hLn1), as well as any other safety regulations. <br /> Contractors shall comply with California Public Utilities Commission Ganaral Order 95 <br /> (htto://www.cuuacasov/eos/G095/s'o 95 star[uo oas�e.htm 11 and all other safety rules. No <br /> construction may occur within 25 feat of PGS.E's towers. All excavation activities may only <br /> commence after 871 protocols has been followed. <br /> Contractor shall ensure the protection of PGB.E's towers and poles from vehicular damage by <br /> (Installing protective barriers) Plans for protection barriers must be approved by PGS.E prior to <br /> construction. <br /> 73. PGS.E is also the owner of distribution facilities throughout many of the areas within the <br /> state of California. Therefore, any plans that impact PGS.E's facilities must be reviewed and <br /> approved by PGB.E to ensure that no impact occurs that may endanger the safe and reliable <br /> operation of its facilities. <br /> 1'GB,.F_' Gas and 131ectric Facilities Page 6 <br />