Laserfiche WebLink
CERS Consolidated Emergency Response / Contingency Plan <br />INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY (Check all that apply): <br />CIL <br />E 1. VERBAL WARNINGS; [j] 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; El 3. TELEPHONE; <br />❑ 4. PAGERS; ❑ 5. ALARM SYSTEM, 0 6, PORTABLE RADIO <br />NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY (Check all that apply): C12. <br />Eil 1. VERBAL WARNINGS; ❑ 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; [-]�•. 3. TELEPHONE; <br />❑ 4. PAGERS; ❑ 5. ALARM SYSTEM; M ❑ 6. PORTABLE RADIO <br />EMERGENCY COORDINATOR CONTACT INFORMATION: Ellie Fedi, Affiliate Safety Representative <br />C13' <br />PRIMARY EMERGENCY COORDINATOR NAME: Ellie Fedi PHONE NO.: (916) 413-9590 PHONE NO.: (916) <br />887-7811 <br />ALTERNATE EMERGENCY COORDINATOR NAME: Dwain Bachmann PHONE NO.: (209) 606-7313 PHONE NO.: (209) <br />521-6097 <br />0 Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: (209) 524-1211 <br />Note: If more than one alternate emergency coordinator is designated, attach a list in order of responsibility. <br />D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br />Check the applicable boxes to indicate your facility's procedures forcontaining spills and preventingand mitigating releases fires and/or explosions, <br />W& <br />❑ 1. MONITOR FOR LEAKS, RUPTURES, PRESSURE BUILD-UP, ETC.; <br />❑ 2. PROVIDE STRUCTURAL PHYSICAL BARRIERS (e.g., Portable spill containment walls, built-in berms); <br />3. PROVIDE ABSORBENT PHYSICAL BARRIERS (e.g., Pads, spill pigs, spill pillows); <br />❑ 4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br />❑ 5. LINED TRENCH DRAINS AND/OR SUMPS; <br />El 6. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br />E:17. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br />❑ 8. STOP PROCESSES AND/OR OPERATIONS; <br />❑ 9. AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br />10, SHUT OFF WATER, GAS, ELECTRICAL UTILITIES; <br />I 1. CALL 9-14 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br />[] 12. NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br />CJ 13, ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br />j] 14. PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br />15. REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br />jQ 16, HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br />[] 17. USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br />❑ 18. VACUUM SUCTION USING APPROPRIATE VACUUM (e.g., Intrinsically safe) FOR SPILL CONTROL AND/OR CLEANUP; <br />❑ 19. DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE, <br />❑ 20. PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br />El21.OTHER (Specify): <br />02. <br />E. FACILITY EVACUATION <br />THE FOLLOWINGALARM SIGNALS) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Check all that apply): <br />El. <br />❑ 1. BELLS; <br />Es. <br />0 2. HORNS/SIRENS; <br />El 3. VERBAL (i.e., Shouting); <br />0 4. OTHER (Specify): over head paging system, Cisco Phone system <br />THE FOLLOWING LOCATION(S) WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S) (a g., Parking lot, street corner): <br />E3. <br />Northwest corner of parking lot <br />Note: The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br />EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: <br />E4, <br />❑ 1. WRITTEN PROCEDURES DESCRIBING ROUTES, EXITS, AND ASSEMBLY AREAS; <br />0 2. EVACUATION MAP(S) DEPICTING ROUTES, EXITS, AND ASSEMBLY AREAS; <br />❑ 3. OTHER (Specify): Fs. <br />Note: Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan, <br />F. ARRANGEMENTS FOR EMERGENCY SERVICES <br />ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following): <br />FL <br />G] 1. HAVE BEEN DETERMINED NOT NECESSARY; <br />[:124 THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE (Specify): <br />F2. <br />Note: Advance arrangements with local fire and police departments, hospitals, state and local emergency response teams, and/or emergency services <br />contractors should be made for your facility, if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan, <br />Rev. 03/07/17 Page 2 of 4 <br />