My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VERNALIS
>
9000
>
2200 - Hazardous Waste Program
>
PR0541637
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2020 1:55:38 PM
Creation date
8/7/2020 1:47:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0541637
PE
2226
FACILITY_ID
FA0009758
FACILITY_NAME
SFPUC Tesla Treatment Facility
STREET_NUMBER
9000
Direction
W
STREET_NAME
VERNALIS
STREET_TYPE
Rd
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
9000 W Vernalis Rd
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WSTD Incident Report <br />Report ID <br /> <br />Water Supply and Treatment (WSTD) Incident Report Page 4 of 6 <br />Revision Date: 10/18/18 <br />14. Incident Details <br />3/11/19-present <br />Special Conditions: UVR 2040 has been in service from the startup date of 3/11/19. There is power monitoring <br />equipment in the main MCC measuring power to UVR 2040. UVR 2040 L-2-2 had low irradiance issues while <br />Calgon was on site on 3-14-19. An inspection was performed and found the well contaminated. L 2-2 well was <br />replaced and verified with a calibration. L-2-2 had 306 hours until lamp broke. <br />3/20/19 <br />1251: GFI fault for UVR 2040 alarmed. Heard water gushing from the UVR room indicating a lamp break. <br />1252: Matt Cordua donned PPE to close the MOV/FCV locally and to take initial Mercury readings. Initial <br />readings were 0 mg/m³. <br />1255: MOV/FCV were forced closed via MOP panel. <br />1300: MOV/FCV fully shut. <br />1305: All onsite personnel were notified not to enter UVR room. All Access denied to UVR room. <br />1310: Opened all roll up doors and access doors to ventilate area <br />1315: TTF Onsite Response team donned PPE to inspect UVR and number of lamps damaged. <br />1316: All proper personnel were notified via phone/email. <br />1330: Response team found that one lamp (2-2) broke. There were no pickups on the Jerome meter leading to <br />and around the Reactor however a reading of 0.27 mg/m³ inside the Reactor. <br />1345: Onsite samples were collected and placed in lab fridge waiting WQ pickup. <br />1400: Reactor LOTO’d and isolated from the system. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.