Laserfiche WebLink
<br /> <br /> <br />rs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 3 of 5 <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: Caldwell Level Change Indicator <br />Sump/UDC ID 1-87-PS 2-91-PS <br />Sump Manufacturer Unknown FGC Unknown FGC <br />Sump Depth (inches) 45" 46 1/2" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />14" 17" <br />Test Start Time 9:22 9:27 <br />Initial Reading .001 .001 <br />Test End Time 9:52 9:57 <br />Final Reading .001 .001 <br />Change in Reading 0 0 <br />Pass/Fail Criteria > .002 > .002 <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Sump/UDC ID UDC 1&2 UCD 3&4 UCD 5&6 UCD 7&8 <br />Sump Manufacturer Bravo SYCS Bravo SYCS Bravo SYCS Bravo SYCS <br />Sump Depth (inches) 9" 9" 9" 9" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />BP BP BP BP <br />Test Start Time 9:32 9:37 9:42 9:47 <br />Initial Reading .001 .001 .001 .001 <br />Test End Time 10:02 10:07 10:12 10:17 <br />Final Reading .001 .001 .001 .001 <br />Change in Reading 0 0 0 0 <br />Pass/Fail Criteria > .002 > .002 > .002 > .002 <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Additional copies of this page may be attached. <br /> <br />8. SUMP/UDC TEST