Laserfiche WebLink
STEPHEN K. SINNOCK <br />CHRISTOPHER H. NEUDECK <br />NEAL T. COLWELL <br />BARRY O'REGAN <br />KENNETH L. KJELOSEN <br />RETIRED <br />KJELDSEN, SINNOCK & NEUDECK, INC. <br />CIVIL ENGINEERS AND LAND SURVEYORS <br />1550 HARBOR BOULEVARD <br />SUITE 212 <br />TELEPHONE (916) 403-5900 <br />EMAIL: CIVILENGINEERING@KSNINC.COM <br />WEST SACRAMENTO, CALIFORNIA 95691 <br />711 NORTH PERSHING AVENUE <br />POST OFFICE BOX 844 <br />TELEPHONE (209) 946-0268 <br />FAX (209) 946-0296 <br />STOCKTON, CALIFORNIA 95201-0844 <br />KSN Project No. 2414-0010 <br />SUBMITTAL FOR: <br />Grindstone Joe's Association — Wastewater Holding Tank, Controls and Alarms <br />Contractor: fi.� C01),S j f�jt�c�/'j <br />Submittal #: 0019-002 <br />Manufacturer/Supplier: Orenco: Level Controls & Alarm; Xerxes: Single Wall FRP Holding Tank <br />Description <br />Specification Title: <br />Provided for: <br />Remarks: <br />Wastewater Holding Tank Capacity Design Calculations <br />N/A <br />No.: N/A <br />® OWNER REFERENCE OR RECORDS <br />® DESIGN INTENT DOCUMENTATION <br />® COUNTY ENVIRONMENTAL HEALTH DEPARTMENT SUBMITTAL <br />® CONTRACTOR USE OR REFERENCE <br />These provided manufacturer engineering submittals are to be coordinated by the Contractor for <br />installation adhering to manufacturer's instructions and in conformance with the design intent <br />indicated by the Design Drawings. Contractor shall be responsible for all fees, coordination and <br />actions required to complete the installation of these products on behalf of the Owner. Contractor shall <br />coordinate any corrections required for system approval by San Joaquin County Environmental Health <br />Department. <br />These submittals or shop drawings have been reviewed for general conformance with the design <br />concept of the Project, and general compliance with the Contract documents. The Contractor remains <br />responsible for confirming and correlating all dimensions and quantities, selecting fabrication <br />processes and techniques of construction, and coordinating the work of the trades, and performing the <br />work in a satisfactory manner. <br />By: l't' r'Date: October 21, 2019 <br />KJELDSEN, SINNOCK & NEUDECK, INC. <br />cc: <br />Neal T. Colwell, <br />Principal Engineer, KSN <br />