8
<br />GENERALNOTES:
<br />T B THE NTBR OF THESE PLANS TO PRESCRIBE THE DETAILS FOR TIECONSTRUCIgN
<br />OF THE WORK WHICH THE CONTRACTOR UNDERTAKES TO PE7FOFW W ACCORDANCEWITH
<br />THE TERMS OF THE CONTRACT. WHERE THE PUNSOESCRBE PORTIONS OFTIEWORKN
<br />GENERAL TERMS, BUT NOT INCOMPLETE DETAIL, R S U DENST000THATQLYTFEBEST
<br />PRACTICE S TO PREVAIL AND THAT ONLY MATERIAL AND WOR AA SIiCF THE FIST
<br />OUALfTY ARE TO RE USED. UNUM OTHERWrE BPECFED,THECWMACTOR&iAU
<br />FURNISH ALL LABOR. MATERIALS, TOOLS. EQUIPMENT. ANDNCBFO
<br />ENTNSABOALLTHE
<br />WORK INVOLVED IN EXECUTING THE CONTRACT NASATBFACIORYANDWOR MNNU E
<br />MANNER
<br />7. ALL IMPROVEMENTS TO BE DONE IN THIS CONTRACT SHALL BE N ACCORDANCE WITH THE
<br />REQUIREMENTS OF THESE PLANS.
<br />3. SHOULD R APPEAR THAT THE WORN TO BE DONE OR ANY MATTERREATED THEETOB
<br />NOT SUFFICIENTLY DETAILED OR EXPLAINED W THESE PIANS, ORBROADITAPPEAR THAT
<br />THERE B A CHANGE N SITE CONDITIONS, OR AN ADJUSTMENT MIST BE MADETOTHE
<br />WORK REOUREMBATS, THE CONTRAC70R SHALLCONTACTTHEDESIGN ENGINEER FOR
<br />SUCH FURTHER CLARIMATION AS MAYBE NECESSARY.
<br />1. THE CONTRACTOR SHALL BE RESPONSIBLE FORNO'FEWCHANCES LADE WITHOUT
<br />PRIOR WRITTEN AUTHORIZATION FROMTE ENGFEER.
<br />S. PRIOR TO THE NCEMENT OF CONSTRUCTION, A JOINT ROW" BETWEEN THE
<br />ENGINEER AND THE CONRRACTOIRS REPRESENTATIVE SHALL BE MADE TO ASCERTAIN THE
<br />RIE -CONSTRUCTION CONDITION OF EXISTING FACILITIES AND IMPROVEMENTS N THE
<br />VICINITY OF THE PROJECT SITE (E.G. ROADS, PUMPS, PIPES. SPHONS, RAPS, WALKWAYS,
<br />BULDNGS, ETC.). F SIKH EXISMG FACLITIES ORPROVEMENTSARE DAMMEDASA
<br />RESULT OF THE CONTRACTORS OPERATIONS WRWGOONSTRUCTIOR TE CONTRACTOR,
<br />AT HIS SOLE EXPENSE, SHALL MMEDATELY REPARAHGORREPLACE SALE MTHE
<br />CONDITION THAT EXISTED PRIOR TOTHE COMMENCEMENT OF CONSTRICTION.
<br />e. THE CONTRACTOR AGREES THAT N ACCORDANCE WITH GENEPALLYACCEPTED
<br />CONSTRUCTION PRACTICES, THE CON7MCTOR75SULESSC/EANDC01PLETE
<br />RESPONSIBLf7Y FOR JOB SITE CONDITIONS DURING THE COURSE OF WN$IWICICNOF
<br />THIS PROJECT. NCLUDWG THE SAFETY OF ALL PERSONS AND PROPERTY. THIS
<br />REQUIREMENT SHALL APPLY CONTINUOUSLY AND SHALL NOTEE UMTEDTONC MQ
<br />WORGNGHOURS. THE CONTRACTOR SHALL DEFEND,IDENEY,AICHODTIECNNER
<br />AND THE ENGINEER HARMLESS FROM ANY AND ALL LKBIITY.IEAADMIEGED,N
<br />CONNECTION WTN THE PERFORMANCE OF WORKON THSPROECT, FXCBTNOFOR
<br />LABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE DISTRICT OR THE ENGINEER
<br />7. THECONTRACTOR SHALL AT ALL TIMES BE RESPONSIBLE FOR JOB SITE SECWTY. THE
<br />DISTRICT ANDIOR ENGINEER WILL NOT BE RESPONSIBLE FON MSSFGOR DAMAGED
<br />E W IPM E NT, TOOLS. OR PERSONAL SELONC#MS.
<br />S. THECONTRACTORSHALL NOTIFY THE DISTRICT RERESENRATNEAMNWMOF/8HOUR$
<br />PRIOR TO THE COMMENCEMENT OFANYWO N.
<br />9. THE CONTRACTOR SHALL IMMEDIATELY CORRECT ANY DEFICIENCIES DENTFM BY THE
<br />OWNER AN" ENGINEER DURING THE DULY INSPECTORS. OR FNA, INSPECTION OF THE
<br />WORK FINAL ACCEPTANCEOF THE PROJECT WILL NOTSEMADE UNRAUVENTFIED
<br />DEFICIENCIES HAVE BEEN CORRECTED ANMOERONALCOSTSORDPESES
<br />ASSOCIATED WITH THE CORRECTION OF THE DEFCENCES,NOIDNCBUTNDT LACED
<br />TO MOBILIZATION. DEMOBRIUTION, LABOR, EQUIPMENT, MATERIALS, ETC, SNARL BE
<br />BORNE BY THE CONTRACTOR
<br />ID, THE CONTRACTOR SHALL COMP LY WITH ALL APPLICABLE FEDERAL STATE COUNTY, AND
<br />LOCA LAWS AND REGULATORS AS REOURED FOR TPAFFC CONT RO.ANO PUMGSAFM
<br />DURING THE CONSTRUCTION OF THE PROJECT. ALW'OKSHALSEPERFCILED N
<br />ACCORDANCE WITH APPLCABLEONIAREOMTDNS.
<br />11, THE CONTRACTOR SHALL IMMEDIATELY REPAR ARYDAMAGE TOTHELOCLLKNDSOR
<br />ACCESS RAMPS RESULTING FROM CONTRACTOR'S OPERATIONS.
<br />12 PRIOR TO THE MOBILIZATION OF EOUIPME NT AND MATERIAL. THE CONTRACTOR SHALL
<br />CONTACT APPLICABLE STATE. COUNTY. AND LOCA GWDbLEMATMHSPORTATICN
<br />AUTHORITIES IN ORDER TOVERIFY ROAD AND BRIDGE IVEGIT RfownaNS$PEED
<br />LIMITATIONS. SPECIAL TRAFFIC CONTROL MEASURES, AND ANY OTHER REOUREMENTS N
<br />ORDER TO COMPLY WITH SUCH PUBLIC TRANSPORTATION RULESA OREQAATONS FOR
<br />THE USE OF PUBLIC ROADWAYS.
<br />13. THECONTRACTOR SHALL BE RESPONSIBLE FOR MNTANNGACCESSNDNGTHE
<br />EXISTING ROAD AT AL TIMES DURING CONSTRUCNON.ANYOAMAGE TOTHEROADSH A L
<br />BE IMMEDIATELY REPAIRED BY THE CONIRACTORATHIS EXPENSE.
<br />14. THE CONTRACTOR IS RESPONSIBLE FON SETTING ALL CONSTRUCTION STAIONGAD
<br />SURVEYING, AS MAY BE REWIRED FOR CONSTRUCTDNACTMTES, NCLUGHC,BUT NOT
<br />LOOTED 70, SETTING ANY ELEVATIONS AS REINRED THROUGHOUT TIE PROJECT GOES..
<br />15. THE CONTRACTOR SHALL NOT CLOSE ANY ROAD, STREET,ORHGWAYTOTHEPUMC
<br />EXCEPT WITH THE PERMISSION OF THE OWNER AND TIE GOVERNMENTAL AUTHORITY
<br />HAVING JURISDCTON. TEMPORARY PROVISIONS SIIALSE MAIZE BY THE CO TRICTORTO
<br />ENSURE CONTINUOUS ACCESS TO PUBLIC ATDPIWATE ONMEWAYS, ANDPROB2
<br />FUNCTIONING OF SEWER INLETS, GUTTER $, CULVERT$. DPANAGEAD RPoGATON
<br />DITCIHES. AND NATURALWATERCOLASES
<br />18, THE CONTRACTOR SHALL NOTFY THE ENGINEER WHENEVER RAPPEAR$THERE ISA
<br />CHANGE IN SITE CONDITIONS OR AN ADJUSTMENT TOBE FADE N WORKREOUREMENTS.
<br />17. THROUGHOUT ALL PHASES OF CONSTRUCTION TECONIRACTORSHAL KEEPTHE
<br />PRE ES OCCUPIED BY HIM INA CLEAN AND ORDERLY CONDTTM.DBPOSINGO REFUSE
<br />INA MANNER SATISFACTORYTOTHE ENGINEER
<br />DEFNITOM
<br />1. `TYPICAL' OR TYP' INDICATES IDENTICAL
<br />2 'AS REDUIREO' INDICATES COMPONENTS REWIRED TOOOM9ETE THE NOTED, SYSTEMAS
<br />INDICATED IN THE PROJECT DOCUMENTS SHALL BE PROVIDED.
<br />DUST AND MUD CONTROL
<br />1. WRING THE COURSE OF CONSTRUCTION, THE CONTRACTOR SHALL KEEP ALL
<br />CONSTRUCTION AREAS, FILL AREAS. HAUL ROADS, OBER ROADWAYS. AND OTHER USE
<br />AREAS WHERE DUST IS GENERATED WELL WATERED, AND DURING WET CODRIONS,
<br />AREAS USED BY LOCAL TRAFFIC, FREE AND CLEAR FROM MD
<br />2. NONWORKDAYS: THE CONTRACTOR IS RESPONSIBLE FOR DUST CONTROL WANY
<br />PROJECT AREAS OR CONSTRUCTION ROADS WROHARE USED BYTHE CONTRACTOR.
<br />UNLESS OTHERWBEAPPRO'EDBYTEBNGNEER
<br />UTILITY NOTES:
<br />1, THEAPPiRO%IWTE LOCATION OF KNOWN UTILITIES. OSCARGEPPES.ETCLMAYBE
<br />SHOWN ON THE PUNS FOR THE INFORMATION OFTNECONTRACTOR. THE ENGFEER
<br />ASSUMES NO RESPONSIBILITY FOR THE ACC7RACY.COPLErENFM. OR RF1ABLrY O
<br />THSINFORMATION IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE
<br />ACTUAL LOCATION OF ALL UNDERGROUND, SURFACEOVER M.ANDSUBNARM
<br />IMPROVEMENTS, OR FACILITIES WHICH MAYBE SUBJECT TOOAMAGE BY REASONOF HIS
<br />OPERATONS.
<br />2, THE CONTRACTOR SHALL VERIFY THE LOCATIONCF ALLEXLSTNGUGEROROUND
<br />UTILITIES AND SHALL CONTACT THE RESPECTNE UTNYCOLPAIESPRIORTO
<br />COMMENCEMENT CFWOFRK HE SHALL BE RESPONSIBLE FORTHELOCATON AND
<br />PRESERVATION OF ALL SUCH FACILITES N THE AREAOF WNSTRUC TDRAIDSHLLL
<br />NOTIFY UTLIRES A MNIMUM OF TWENTYiWR(3UHDUIS NAOAANCEOFANY
<br />CONSTRUCTION. (UNDERGROUND SERVICE AERT811l(8M2Y?4m
<br />L THE CONTRACTOR SHALL PRESERVE AND PROTECTALLEASiNG OW"TONAD
<br />GRAMM FACILITES INCLUDING. BUT NOT UAITED TD RAPSDUCHESODSSNLS,
<br />ETC., DURING THE TERM OF THE CONTRACT. THE E%SING MrATONADOANACi
<br />FACTURES MUST REMAIN FULLY OPERATIONAL DURNGTHE PER= OF WIISTFtUCTON.
<br />ACCESS ROADS'
<br />1. THE CONTRACTOR SHALL"ROVE AND MAINTAIN THE LOCK ACCESS ROADS AS MAY BE
<br />REQUIRED FOR TRANSPORTATION AND HAULING MATERIAL TO THE SITE
<br />2 THE CONTRACTOR SHALL REVIEW THE ACCESS ROAD ROUTES AND DETERMINE THE
<br />LOCATION FOR ADDITIONAL TURNOUTS, RAMPS. ROAD DR904EAJGNENT, ETC. AND
<br />SHALL SUBMIT A PLAN TO THE ENGINEER (ANO STATE) FOR REVEW ANDAPRRWAPWOR
<br />TOCONSTRUCTION. UPON COMPLETION OF THE PROIECT,SOE PORTIONS OF THE
<br />ACCESS ROADS MAY REWIRE MINOR MOD FIGATKNSANDATERATONS TIEALCESS
<br />ROADS RANCH REMAIN SHALL BE LEFT N GOOD CONDITION FOR TEDISTIK,TA DOT ER
<br />LOCALTRAFFC.
<br />3, THE ACCESS ROADS FOR THIS PROJECT MAY REWRETE CONERACTORTOMODFYAW
<br />REWORK THE EXISTING ROADS TO MEET THE WNTRACTORSHAU NGAND ROAD
<br />DRAINAGE REQUIREMENTS SUCH MOOFICATIONSSHW.BE DETERMINED BY THE
<br />EWWEER
<br />A. THE CONTRACTORS EOUPMENT SHALL BE RESTRICTBHTOOPERATE ONLY ON TRIOSE
<br />ROADS AND WITHIN THOSE SPECIFIED WORK ARFASNDICATEDONTHE PLANS (MESS
<br />OTHERWISE APPROVED BY THE ENGEEERADOSTRCT.
<br />S. THE CONTRACTOR SHALL Q7END.STRENGTHEN.RERACE.OR OTHERWISE MODFY THE
<br />EXISTING CROSSINGS (E G. CULVERTS. DRAW PIPES.PLILPDSO"M PPES,WETSPOTS.
<br />ETC.) AS NECESSARY TOACCOMMODATE HIS EQ UPMQR. TIE LONTRACTORSHNL
<br />PROVIDE WHATEVER MEASURES ARE NECESSARYTOPREsew PROTECT,ANIMANTAN
<br />THE CROSSNGS SOAS TO ENSURE CONTNUOUSA D LNNIEM AMDCOSTLLRLIN
<br />OPERATIONS DURING THE ENTIRE TERROF THISCONTRACT.
<br />N:mA
<br />6. NEITHER THE DISTRICT NOR THE ENGINEER MAKERIYWARRANTYORGWJWREEASTO
<br />THE ADEQUACY OF THE E%STING NATIVE MNTERALS TO WPPCNT THECONSTRUCTKN
<br />TRAFFIC ON THE ACCESS ROADS. THE CONTRACTOR B SOLELY RESPONSIBLE FOR MAXNG
<br />THE NECESSARY IMPROVEMENTS AND PROVIDING THE NECESSARY MEASURES REQUIRED
<br />TO ACCOMMODATE HIS ANTICIPATED NEEDS.
<br />T. THE CONTRACTOR SHALL BE RESTRICTED TO THE 119E OF HIGHWAY LEGAL SSD TRUCKS
<br />AND TRAILERS AND OTHER EQUIPMENT OPERATIONS OVER THE ACCESS ROADS, LN ESS
<br />OTHERWISE APPROVED BY THE ENGNEER
<br />8. THE MAXIMUM ALLOWABLE SPEED UNIT ON ALL ROADS SHALL BE 5 MPH UNLESS
<br />OTHERWISE APPROVED.
<br />9. THE CONTRACTOR, UPON COMPLETION OF ALL WORK, SHALL RESTORE ALL ACCESS ROADS,
<br />HAUL ROADS. AND PROJECT SITES N A MANNER SATISFACTORY TO THE ENGINEER
<br />DISTRICT, AND STATE.
<br />CLEARING 6 GRUBBING
<br />I. USE CAUTION WHILE CLEARING& GRUBBING AROUND URTYLNES&ANY BAITED
<br />UTILITIES
<br />2, ALL WITERXL CLEARED AND REMOVED SNNLBECOE THE PROPERTYAND
<br />RESPONSS&fTY OF THE CONTRACTOR FOR REMOJALANDOSPOSLLOFFSIfE
<br />CONSTRUCTION 6 MATERMNOTES:
<br />1, UNLESS OTHERWISE SHOWN ON THE PLANS. ALL PIPES SHALHIVEAMMAIMCONEAO
<br />38' FROM FLASH GRADE.
<br />2, ALIGNMENT OF NEW PIPELNESAS SHOWN CNDRAWNLSNEAPPROMIATE
<br />CONTRACTORS RESPONSIBLE FOR FIT7INGACTUALAUGMMENTOFPPESTOOOFCIMAS
<br />NEAR AS POSSIBLE TO DESIGN BY PROPER SELECTION ANDPLACHBNTOF PPEAND
<br />FITTINGS. THE NUMBER OF HW AND LOW POINTS N PPELNESSIXLLNOTBE INCREASED
<br />FROM THE NUMBER PROVIDED FOR BY ELEVATIONS SHOWN. DULECTCNOF PIPE JOINTS
<br />SHALL BE LMTEO TO VALUES RECO\LE7DEDSYMMNUFACRRBL
<br />3. A MINIMUM OF B• OF CLEARANCE BETWEEN PIPE CR059NG UDERGROUAO SHA LSE
<br />MAINTAINED WHETHER SHOWN ON DRAWINGS OR NOTP ROJDEASTIAOFOAM PAD(12'
<br />S0. MIN) BETWEEN PIPES FOR ANY CLEARANCE LESS THAN /7.
<br />N. PIPELINES SHALL SLOPE UNFORM.Y BETWEEN ELEVATIONS SHOWN ON PLANS AND
<br />PROFILES. ALL PPE ELEVATIONS SHOWN REFER TO INVERT UNLESS OTHERWISE NOTED,
<br />CONSTRUCTION NOTES:
<br />1. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER FOR THE LOCATION OF EXISTING
<br />UNDERGROUND UTILITIES, IT SHALL BE THE RESPONSISMY OF THE CONTRACTOR TO
<br />IDENTIFY,LOCATE, AND PROTECT ALL UNDERGROUND FACUTES WHICH ARE NOT
<br />DESIGNATED FOR DEMOLITION AND ARE WITHIN THE SCOPE OF PROPOSED WORK
<br />2 THE CONTRACTOR SHALL CLEAR UP DIRT AND DEBRIS FROM SITE THAT ARE ATTRIBUTABLE
<br />TO CONSTRUCTION ACTIVITIES.
<br />3. ALL GRADING SHALL BE PERFORMED IN SUCH A LAMER AS TOCOIPLY WITH THE
<br />STANDARDS ESTABLISHED BY THE PROJECT SPECFICATIONSAND AGENCIES HAVING
<br />JURISDICTION FOR AIRBORNE PARTICULATES (DUST).
<br />A. IT S THE CONTRACTORS RESPONSIBILITY TO VERIFY F EXISTING UTILITIES WITHIN THE
<br />PROJECT WAITS ARE SERVING EXISTING FACILITES OR WT. THOSE THAT SERVE EXISTING
<br />FACILITIES SHALL, IF NECESSARY, BE RELOCATED NSU HAAANERASTOMANTAN
<br />UNINTERRUPTED SERVICES. ANY EXISTING UTIUOFS WINHTHE PROJECT LMS 11X700
<br />NOT SERVE ANY OTHER EXSTNG FACWTIES TO REMAIN SHALL BE DBGLSHDOR
<br />ABANDONED N PLACE AS NDCATEDON THE RAMS
<br />5. CONTRACTOR SWILL OBTAIN A TRENCH SAFETY PERMIT FROM THHECALFOBAQYSKRNOF
<br />NDUSTRAL SAFETY PRIOR TO EXCAVATION OF ANYTRBAN GREATER TRANS FEET DE®
<br />S. ALL TRENCHES SHALL BE PROTECTED ACCORDNGTOCLL OSHA STANDARDS.
<br />7, CONIAACTOR SHALL POTHOLE TO VERIFY THE EXACT LOCATION" DEPTHS OFEXATNG
<br />PARALLEL ANDCROS91NG UTILITIES AT LEAST 5 DAYS PRIOR TOTIE WOfRKANDNOTFYTHE
<br />ENGINEER OF ANY REWIRED CHANGES FROM THAT SHOWN ONTHE RANSRiDRTOMNY
<br />EXCAVATION. CONTRACTOR SHALL EXERCISE CARE WHEN WCY&RGNEAR EXSTMUMJTIES
<br />AND SHALL BE RESPONSIBLE FOR ALL DAMAGE. BREMLSORLEARS.
<br />8. CONTRACTOR SHALL POTHOLE ALL UTILITY CONNECTION PONTSTOVERFYSU,LOCATOR,
<br />AND MATERIAL TYPE PRIOR TO ORDERING MATERMSFORTIEWORK, CONTRACTOR MAY
<br />NEED TO MAKE ADJUSTMENTS. INCLUDING ADAPTERS, COUPLINGS. REDUCERS.ADRESOING
<br />OF STRUCTURE TOCOMPLETE THE NSTAUATDNOFILI
<br />9. LOCATE PPWO, VALVE BOXES. HANOHOLE3. P1A1BOES, AJOTRNSFOFERSTOAVOD
<br />INTERFERENCE WITH OTHER UTLITES. THIS FAY INCLUDE FEW ADAJSTMOOSOFR UTNG
<br />OR DEEPENNG LINES TO ACHIEVE COORDINATION BETWEBNALSYSTB6. CONTACTOR
<br />TO COORDINATE THE SITE ROUTING AND INSTALUTONOFALLWATE R, NATURALGIS,
<br />SEWER STORM GRAIN. ELECTRIC, COMMUNICATIONS COOMONTHE SHE, CONTRACTOR
<br />PROPOSED FIELD ADJUSTMENTS SHALL BE APPROVED BY THE ENGINEER PRIOR TO BEING
<br />IMPLEMENTED.
<br />10. ALL TEES,CROSSES AND BENDS SHALL NCLUDE TRUST BLOCKS WHERE NOT OTHERWISE
<br />RESTRAINED BY MECHANICALOROTHERMEAMS.
<br />K KJELOSEN 7,1NPm,MMAN.
<br />N.rs. S SINNOCK
<br />N NEUDECK
<br />HXIIMIILINAIIFGBI:VE �W. HIK f11Ne.SAe212
<br />I1�� �K1' 1I• WRAC Sx6483= 5W1
<br />tJ.tJ.MJU11u wuHAluoicmn 916NO3N90
<br />CONSTRUCTION NOTES
<br />24140010
<br />
|