Laserfiche WebLink
CRC <br />GRAVITY MET 02% SLOPE 1 <br />m RBIVAM <br />ROOFPETfBIIII101101I <br />FROM HE4RIOOY <br />WASH DOWN AREA <br />RAATLRE2BO <br />�I �� `RAYITLEYEL, 7O <br />(:a:1 WASTEWATER HOLDING TANK- SECTION 1 <br />P=2' <br />2 WASTEWATER HOLDING TANK- SECTION 2 <br />1'=Z <br />f✓rIYlpM <br />RILPJEEN <br />GOMCRIEM PAD. CRAIN NO DRAW PIPE <br />NOT SHO M <br />SEE DETAA 3, THIS 9EET <br />BOLLARD am <br />SEE SHEET DPIM FOR <br />PLACEMENT LOCATION <br />( 3 ) WASTEWATER HOLDING TANK- SECTION 3 <br />N.T.S <br />VENTTORESTROOM <br />ROOF PENETRATION <br />TO WW HOLDNGTANK <br />FROM RESTROOM <br />WASHDOWNAREA <br />AS SHOM K( KJEU7SEN <br />S) SINNOCK ,5mdb�,I <br />�11 ` NEUDECK,�„�,,,a„e9i2,2 <br />O X' 1' v"`�waAl SavPNnb.G�LNt <br />lauMlJlLil ....MR:cmm Nwo3�m <br />SHEET NOTES <br />1, TANK INSTALLATION TO BE COMPLETED PER MANUFACTURES <br />INSTALLATION INSTRUCTIONS AND AS PROVIDED 14 THE <br />MANUFACTURES SUBMITTAL DRAWINGS, MANUFACTURER DRAWINGS <br />TAKE PRECEDENCE WHERE CONFLICTS WTTHTIESE PLANS MAY <br />OCCIXL <br />2 PROVIDE2%SIOPE TRANSITION AWAY FROMFLLAREA TOEXISTNG <br />GRADE POST TANK 96TALLATK K <br />3, DEWATERINGOF PIT MAYBE REOUIED.OEWATERNGISTIE <br />CONTACTORS RESPONSIBILITY. <br />M. CONTRACTOR TO PROVIDE OWNER WITH REOLNES FORANY CHANGES <br />TO DRAWNGS AT PROJECT COMPLETION. <br />KEYNOTES <br />1O <br />PROVIDE MINIMUM OFFSET ON ALL SIDES OF TAW PER <br />MANUFACTURERS INSTALLATION INSTRUCTIONS. <br />O FULLY BED TANK RES N PRIMARY BACNFLL <br />0 PRIMARY BACKFILL TO TOP OF TANK INSTALL PER MANUFACTURERS <br />INSTALLATION IISTRUCTIOS. <br />® WRAP PRIMARY BACKFILL IN GEOTEXTEE FAME ALL SIDES. <br />OS ROUTE TANK VENT TO RESTROOMS N COMMON TRENCH WI PELLEM <br />LINE, VENT THROUGH ROOF ON OUTSIDE OF EXETNG RESTROOM <br />FACIL fY <br />© KEEP DRAFT MANHOLE UNOBSTRUCTED FOR SEPTIC TNN PUMPMG <br />O FLOATLEVEL I PROVIDES INPUT TO LEVEL HARM I. THIS 6 SETAT <br />THE'TIME-TO-PUMP LEVEL IAPPROX W%)OFRESEFNE VOLAE. <br />8O FLOAT LEVEL 2 PROVIDES INPUT TO LEVEL ATARM2. THE E SET AT <br />THE-EXCEEDINGRESERVE STORAGE VOLuw EVELAPPROX BB%I <br />OFRESERVE VOLUTE. <br />SHO INSTALL DEAOYAN. TURNBUCKLE, ANOSIRAPS PER MNVFAC U ES <br />INSTALLATION INSTRUCTIONS. <br />i4BWW. MIM12B90 --�-- OCTOBER2019 <br />LOOI'GA9w DP301TU <br />WASTEWATER HOLDING TANK SEDT a 0 T <br />SECTIONS KSN PROJECT FIE NO <br />