Laserfiche WebLink
RINDSTONE JOE'S WATER SYSTEM DESIGN CALCULATIONS <br />II <br />DESIGN VALUE <br />2414-001 <br />WATER SYSTEM DEMANDS DURING SEASONAL SITE USAGE (Mar. - Oct.) <br />CAPACITY -RELATED CALCULATIONS <br />VALUES <br />101161201 <br />INPUT DATA, CONSTANT <br />AVERAGE DAY DEMAND (GPD) <br />320.0 <br />OCCUPANCY DATA <br />531 <br />WATER USE <br />VG ACTIVE SEASON WEEKEND USE (ATTENDEES/DAY) <br />7x PEAK DAY CAPACITY (GAUWEEK) <br />8 <br />ST. USFS CAMPGROUND TYPICAL OVERNIGHT WATER USE (Gal/Capita/Day) <br />40 <br />PEAK DAY USE (ATTENDEESIDAY)r'r <br />4,500 <br />85 <br />ST. USFS CAMP DAY USE EST. (Gal/Capita/Day) <br />20 <br />DAY USE EST. (% OF FLOW) <br />75% <br />"TIME TO PUMP" CAPACITY, 80% (GAL) <br />VERNIGHT USE EST. (% OF FLOW) <br />DAYS BETWEEN "TIME TO PUMP" PUMPING EVENTS (DAYS) <br />25% <br />13 <br />'EXCEEDING RESERVE STORAGE" CAPACITY, 96% (GAL) <br />FIXTURE COUNT <br />4,800 <br />DAYS BETWEEN'TIME TO PUMP" AND "EXCEEDING RESERVE STORAGE VOLUME" PUMPING EVENTS (DAYS) <br />BOOSTER PUMP & DISTRIBUTION SYSTEM <br />3 <br />UNIT DEMAND No. FIXTURES <br />OOSTER PUMP MINIMUM CAPACITY (GPM) <br />41.5 <br />NATER CLOSETS <br />8.0 <br />5 <br />ROWERS <br />2.0 <br />4 <br />INKS <br />3.0 <br />6 <br />HOSE BIBBS <br />1.1 <br />23 <br />ICE MAKERIDRINKING FOUNTAIN <br />0.5 <br />1 <br />OTAL UNITS <br />92 <br />(1) Peak Day Use estimated for the annual 6 hour member meeting at 20 gal/capita/day, adjusted to the 6 hour time -period. <br />CALCULATIONS <br />ALCULATION <br />II <br />DESIGN VALUE <br />CAPACITY -RELATED CALCULATIONS <br />VALUES <br />PEAK FIXTURE DEMAND per CPC (GPM) <br />42 <br />AVERAGE DAY DEMAND (GPD) <br />320.0 <br />PEAK DAY DEMAND (GPD) <br />531 <br />VASTEWATER HOLDING TANK RELATED CALCULATIONS <br />7x PEAK DAY CAPACITY (GAUWEEK) <br />3,750 <br />RECOMMENDED MIN. CAPACITY (GAL) <br />4,500 <br />TANK DESIGN CAPACITY (GAL) <br />5,000 <br />OPERATIONAL PUMPING RELATED CALCULATIONS <br />"TIME TO PUMP" CAPACITY, 80% (GAL) <br />4,000 <br />DAYS BETWEEN "TIME TO PUMP" PUMPING EVENTS (DAYS) <br />13 <br />'EXCEEDING RESERVE STORAGE" CAPACITY, 96% (GAL) <br />4,800 <br />DAYS BETWEEN'TIME TO PUMP" AND "EXCEEDING RESERVE STORAGE VOLUME" PUMPING EVENTS (DAYS) <br />3 <br />Notes <br />Per GSJ Staff: Peak day is annual member picnic that only lasts 6 hours. <br />afec <br />Ca �w a-I�m <br />h, ft <br />