Laserfiche WebLink
Q°" - -- SANsd0A0UiN <br />COU NTY- <br />cq�i�P� Greatness grows here. <br />July 7, 2020 <br />Mike Torell II <br />T2 Construction <br />2475 Dunn Rd <br />Merced, CA 95340 <br />Environmental Health Department <br />ORIGINAL <br />Wayne Fox, REHS, Interim Director <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Willy Ng, REHS <br />Muniappa Naidu, REHS <br />Michael Kith, REHS <br />Melissa Nissim, REHS <br />RE: Engineer Plan Check for Wastewater System Design (Holding Tank) response letter <br />Joe Grindstone Association <br />13550 Highway 12, Lodi <br />APN 055-020-02, SR0081813 <br />The San Joaquin County Environmental Health Department (EHD) has reviewed the letter (the Letter) dated <br />May 29, 2020 prepared by Kjeldsen Sinnock Neudeck, Inc. (KSN) regarding the proposed wastewater system <br />design to install a 5,000 -gallon waste -water holding tank (the tank) at the above -referenced location (the site). <br />EHD has the following comments for your consideration: <br />The proposed location of the tank does not meet minimum setback requirement of 100 feet to per <br />Table 1.5 of Section 1.5 of the San Joaquin County Onsite Waste Treatment System (OWTS) <br />Standards. KSN stated in the Letter that the location meets 50 -foot set back as an "Existing, Non - <br />Conforming OWTS". The parcel is not a non -conforming lot, as the property is listed as a 12 -acre <br />parcel. Please submit revision / addendum for the location of the tank that meets minimum of 100 <br />feet setback to waterways per OWTS Standards. <br />2. EHD accepts the revised calculations based on the attendee record of the 2019 calendar year <br />provided in the letter. <br />- Average 13 attendees per day for Peak Week use (average is based on maximum attendee of 90 <br />attendees per day over a 3 consecutive day period according to 2019 attendee records); <br />- Overnight Water Use of 40 gallons/capita/day at assumed 25% of total, <br />- Camp Day Use of 20 gallons/capita/day at assumed 75% of total; <br />The peak 7 -day required capacity is 2,275 gallons. <br />3. EHD accepts the proposed 5,000 -gallon holding tank which meets the 2,275 gallon peak 7 -day <br />capacity plus 100% reserve. <br />4. EHD accepts the revised Service Agreement with Advanced Septic Service, LLC dated May 29, 2020 <br />which scheduled pumping frequency quarterly (April 1, June 1, August 1, October 1) or as needed, <br />with the following condition: <br />- In addition to the quarterly pumping, pumping must be conducted between "time -to -pump" alarm <br />which is set at tank being 80% full, and "exceeding reserve storage level" alarm which is set at 95% <br />full (see below). EHD recommends scheduling pumping with the contractor as soon as the "time -to - <br />pump" level has been reached in order to prevent any accidental overfill and release of wastewater to <br />the environment. <br />5. EHD accepts the audible and visual alarm setting of "time -to -pump" alarm which is set at tank being <br />80% full, and "exceeding reserve storage level" alarm which is set at 95% full. Ensure that the <br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/ehd <br />