Laserfiche WebLink
K KJELOSEN Elisabeth A. Beckensten, P.E. <br />S S I N N O C K Civil Engineer <br />N NEUDECK 1550 Harbor Blvd. Suite 212 West Sacramento CA 95691 <br />inc. cswlENGINEER58LAND SURVEYORS 916 403-5900 1 fax: 916 403-5901 <br />C E L E B R AT I N G 60 Y2 All s ebeckensten(a ksninc.com I https://www.ksninc.com <br />Warning.- <br />Information <br />arning:Information provided via electronic media is not guaranteed against defects including translation and transmission errors. <br />If the reader is not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this <br />communication is strictly prohibited. If you have received this information in error, please notify the sender immediately. <br />From: Callahan, Michael [PW] <mcallahan@sigov.org> <br />Sent: Monday, April 27, 2020 12:45 PM <br />To: Elisabeth A. Beckensten, P.E. <ebeckensten@ksninc.com>; Wong,Jeff <Jwong@sigov.org> <br />Cc: Steven Whittlesey <swhittlesev@ksninc.com>; Neal Colwell <ncolwell@ksninc.com>; Joseph E. Thomas <br /><jthomas@ksninc.com> <br />Subject: RE: Joe Grindstone Engineered Plans for Septic Holding Tanks <br />Elisabeth <br />I have finished reviewing the report. Regarding the floodway definition number 4, the report states that the project is <br />indeed between the levees and flood water does flow over the project site which means it is within the floodway. The <br />report then simply states that "it is not the watercourse itself'. The report need to explain this statement and provide <br />concrete reasoning as to why the project site should not be considered part of a watercourse or river and why it does <br />not meet floodway definition number 4. <br />Michael Callahan <br />Senior Civil Engineer <br />San Joaquin County <br />Department of Public Works <br />(209) 468-9360 <br />mcallahan@sigov.org <br />From: Elisabeth A. Beckensten, P.E. <ebeckensten@ksninc.com> <br />Sent: Tuesday, April 07, 2020 6:08 PM <br />To: Wong,Jeff <Jwong@sigov.org> <br />Cc: Callahan, Michael [PW] <mcallahan@sigov.org>; Mike Torell (Tore112@hotmail.com) <Tore112@hotmaii.com>; Steven <br />Whittlesey <swhittlesev@ksninc.com>; Neal Colwell <ncolwell@ksninc.com>; Joseph E. Thomas <br /><ithomas@ksninc.com>; Scott Andrews <scott@cogenia.com> <br />Subject: RE: Joe Grindstone Engineered Plans for Septic Holding Tanks <br />Mr. Wong, <br />Thank you for forwarding the comments from Mr. Callahan in the Public Works Department. My colleague, Joseph <br />Thomas, who is Certified Floodplain Manager has reviewed the comments and relevant site data. Please see the <br />attached letter he prepared addressing the floodway concerns. <br />