Laserfiche WebLink
GREASE INTECEPTOR SIZING <br /> GENERAL NOTES <br /> WATER HAMMER ARRESTER <br /> WASTE PIPING 1 PLUMBING CONTRACT DRAWINGS ARE IN PART DIAGRAMMATIC, COVERING THE SCOPE OF WORK AND <br /> QTY DESCRIPTION F.U.PER TOTAL SCHEDULE GENERAL ARRANGEMENT OF THE EQUIPMENT, PIPING, ETC., AND THE APPROXIMATE SIZE OF EQUIPMENT <br /> AND MATERIALS. THE CONTRACTOR SHALL FOLLOW THESE DRAWINGS IN LAYING OUT THE PLUMBING WORK. ROBISON <br /> FIXTURE SS F.U. PLUMBING CONTRACTOR SHALL CONSULT GENERAL, SPRINKLER, HEATING/VENTILATING/AIR CONDITIONING <br /> CONTRACT AND ELECTRICAL DRAWINGS TO FAMILIARIZE HIMSELF WITH THAT WORK AND TO VERIFY THE ENGINEERING INC <br /> 1 MOP SINK 3 3 MARK MANUFACTURER/ SPACES IN WHICH THE PLUMBING WORK WILL BE INSTALLED. <br /> MODEL FIXTURE UNITS INLET SIZE REMARKS 1940140TH AVE W.,SUITE 302 <br /> 2 BECAUSE OF THE NATURE AND SCALE OF THE DRAWINGS, CERTAIN BASIC PLUMBING ITEMS SUCH AS LYNNWOOD,WA 98036 <br /> 1 3-COMP SINK 3 3 UNIONS, FITTINGS, ELBOWS, ETC., MAY NOT BE SHOWN. WHERE SUCH ITEMS ARE REQUIRED BY OTHER 206.364.3343 TEL <br /> SECTIONS OF THE SPECIFICATIONS, OR WHERE THEY ARE REQUIRED BY THE NATURE OF THE WORK OR BY <br /> WHA-A PPP SC-500 1 -1 1 1 2" PER PDI STANDARD PDI-WH 201 CODES AND REGULATIONS, THEY SHALL BE FURNISHED AND INSTALLED AT NO ADDITIONAL COST TO THE CONTACT:MARK MANGLICMOT <br /> 1 HAND SINK 2 2 / OWNER. THE DRAWINGS INDICATE GENERAL LOCATIONS OF PIPING, EQUIPMENT, DUCTWORK AND <br /> SIMILAR. THE EXACT LOCATION TO BE DETERMINED BY THE CONTRACTOR TO BEST FIT THE LAYOUT OF <br /> 2 FLOOR DRAIN 2 4 WHA-B PPP SC-750 12-32 3/4" PER PDI STANDARD PDI-WH 201 THE JOB. <br /> ROFESS/pN <br /> 3 ALL EQUIPMENT SHALL BE TIGHTLY COVERED AND PROTECTED AGAINST DIRT, WATER, AND CHEMICAL OR <br /> MECHANICAL INJURY OR THEFT. PLUMBING FIXTURES SHALL BE COVERED WITH HEAVY PAPER COVERINGS D• Rp �� <br /> TOTAL 12 WHA-C PPP SC-1000 33-60 1 PER PDI STANDARD PDI-WH 201 AFTER INSTALLATION AND SHALL BE THOROUGHLY CLEANED AFTER COMPLETION OF THE PROJECT. els Fy <br /> 4 ALL MATERIALS SUCH AS VALVES, FITTINGS, PIPING, EQUIPMENT, PUMPS, COILS, ETC., SHALL BE Z <br /> CPC TABLE 1014.3.6 PROPERLY PROTECTED, AND ALL PIPING OPENINGS SHALL BE TEMPORARILY CLOSED BY THE CONTRACTOR w o. M-28712 m <br /> GRAVITY GREASE INTERCEPTOR SIZING FOR THE WORK UNDER HIS CHARGE, ON A DAILY BASIS, AT THE END OF EACH WORKING DAY, SO AS TO 70 <br /> PREVENT OBSTRUCTION AND DAMAGE. THE ABOVE REQUIREMENTS ARE MANDATORY. - 0-19 <br /> DFU'S INTERCEPTOR VOLUME 5 THE CONTRACTOR SHALL SEE THAT ALL MATERIALS, INSTALLATION AND WORKMANSHIP IS PERFORMED INACCq �FCHAN��P���P <br /> FIXTURE UNIT CALCULATIONS AND OALL COUNTY ANCE HAND E LOCAL CITY LATEST I CODES TION FOR ORDINANCES,ALL LE INCLUDINGALL ORCODES, LAWS, ORDINANCES <br /> ORA�LOCAL BOARD OF TE, rF OF CA�\F�� <br /> 8 500 GALLONS HEALTH, FEDERAL AND STATE ENVIRONMENTAL PROTECTION REGULATIONS, Seal 03-22-18 <br /> 21 750 GALLONS WATER PIPING WASTE PIPING STATE ENERGY CODES AND UTILITY REGULATORY AGENCIES. <br /> ®® _ <br /> 35 1000 GALLONS FIXT ID 6 ALL WORK SHALL BE FURTHER PERFORMED IN ACCORDANCE WITH THE NATIONAL BOARD OF FIRE - -� <br /> QTY DESCRIPTION F.U.PER TOTAL TOTAL F.U.PER TOTAL UNDERWRITERS, THE PLUMBING AND BUILDING CODES, NATIONAL ELECTRICAL CODE, THE i ® v s <br /> (ITEM) OCCUPATIONAL SAFETY AND HEALTH ACT, THE AMERICAN GAS ASSOCIATION, AND ALL SUCH OTHER <br /> 90 1250 GALLONS FIXTURE CW F.U. HW F.U. FIXTURE SS F.U. SPECIFIC CODES AS MAY BE REFERRED TO IN THE INDIVIDUAL SECTIONS OF THE SPECIFICATIONS. <br /> low- ® ®® <br /> PLUMBING FIXTURES 7 PIPE SIZES SHOWN ON THE DRAWINGS ARE THE MINIMUM SIZES ALLOWED REGARDLESS OF THE CODE <br /> MINIMUM, EXCEPT WHEN THE CODE MINIMUM SIZE IS LARGER THAN THAT SHOWN. <br /> WC-1 2 WATER CLOSET (FLUSH TANK) 2.5 5.0 - 4 8 8 THE CONTRACTOR SHALL MAINTAIN A CURRENT SET OF CONTRACT PRINTS ON THE CONSTRUCTION SITE AT ®_ <br /> ALL TIMES, ON WHICH HE SHALL ACCURATELY RECORD THE ACTUAL INSTALLATION OF ALL PLUMBING WORK. <br /> AS WORK PROGRESSES, MARK CHANGES MADE WHETHER RESULTING FROM JOB CONDITIONS, ADDENDA, �s <br /> LV-1 2 LAVATORY 1 2 2 1 2 FORMAL CHANGE ORDERS OR OTHER INSTRUCTIONS ISSUED BY THE ENGINEER. <br /> DOMESTIC HOT WATER A1C 1 CAPPUCCINO MACHINE (6 HEADS) 0.5 0.5 - 0.5 0.59 THE PLUMBING CONTRACTOR SHALL INDICATE PROGRESS BY COLORING IN VARIOUS PIPES, FIXTURES, AND N <br /> ASSOCIATED APPURTENANCES EXACTLY AS THEY ARE ERECTED AND INSTALLED. _moi ® Jaw- <br /> NNW <br /> CIRCULATING PUMP SCHEDULE A10 2 DUAL SOFT HEAT BREWER 0.5 1 - 0.5 1 10 MARK ALL PIPE SIZES AND LOCATIONS DURING CONSTRUCTION. ALSO, MARK LOCATIONS OF ALL VALVES <br /> AND VARIOUS EQUIPMENT, APPARATUS, AND ASSOCIATED APPURTENANCES AS ERECTED WEEKLY DURING <br /> CONSTRUCTION. <br /> DESIGNATION: HWCP- 1 B 1 A 2 FROZEN BEVERAGE DISPENSER 0.5 0.5 - 0.5 0.5 <br /> 11 AT THE COMPLETION OF THE JOB THESE PRINTS, INCORPORATING CHANGES, ADDENDA AND ADDED DATA <br /> ZONE: BUILDING NOTED ON MARKED-UP PRINTS, INCLUDING DIMENSIONED LOCATIONS OF UNDERGROUND PIPING BEYOND <br /> 32A 1 FOUNTAIN ICE MAKER (CUBED) 0.5 0.5 - 0.5 0.5 LIMITS OF BUILDING, SHALL BE SUBMITTED TO THE ENGINEER FOR FINAL REVIEW AND COMMENT. THE <br /> MANUFACTURER: GRUNDFOS PRINTS WILL BE RETURNED WITH APPROPRIATE COMMENTS AND RECOMMENDATIONS. THESE CORRECTED <br /> PRINTS TOGETHER WITH CORRELATED PRINTS INDICATING ALL THE REVISIONS, ADDITIONS AND DELETIONS <br /> MODEL: UP15-18137 3213 1 FOUNTAIN ICE MAKER (NUGGET) 0.5 0.5 - 0.5 0.5 OF WORK, SHALL FORM THE BASIS FOR PREPARING A SET OF RECORD DRAWINGS. <br /> TYPE: INLINE 1312 1 20-VALVE ICEBEVERAGE DISPENSER 0.5 0.5 - 0.5 0,5 12 WHERE PIPING, AND OTHER PLUMBING APPURTENANCES PASS THROUGH FIRE PARTITIONS, FIRE WALLS, OR <br /> / FLOORS, INSTALL A FIRE-STOP THAT PROVIDES AN EFFECTIVE BARRIER AGAINST THE SPREAD OF FIRE, <br /> SMOKE AND GASES. FIRE-STOP MATERIAL SHALL BE UL APPROVED, PACKED TIGHT AND COMPLETELY FILL <br /> G.P.M.: 3 CLEARANCES BETWEEN RACEWAYS AND OPENINGS. FLOOR, EXTERIOR WALL, AND ROOF SEALS SHALL ALSO BE Q <br /> (36 1 ICE MAKER 0.5 0.5 <br /> HEAD (FT-H20): 12 MADE WATERTIGHT AS APPROVED BY THE ADMINISTRATIVE AUTHORITY. <br /> G6C 1 ICE MAKER CONDENSER 0.5 0.5 13 ARRANGE AND INSTALL PIPING APPROXIMATELY AS INDICATED, STRAIGHT, PLUMB AND AS DIRECT AS m <br /> RPM: 2940 POSSIBLE. FORM RIGHT ANGLES OR PARALLEL LINES WITH BUILDING WALLS. KEEP PIPES CLOSE TO <br /> WALLS, PARTITIONS AND CEILINGS, OFFSETTING ONLY WHERE NECESSARY TO FOLLOW WALLS AND AVOID Cf) <br /> MOTOR FLA: 0.74 G7 1 MOP SINK 3 3 3 3 3 INTERFERENCE WITH OTHER MECHANICAL ITEMS. LOCATE GROUPS OF PIPES PARALLEL TO EACH OTHER; Z <br /> SPACE THEM AT A DISTANCE TO PERMIT ACCESS FOR SERVICING VALVES. 0 a- <br /> VO LTAG E: 115 U5 LLJ <br /> 3913 1 3-COMP SINK 3 3 3 3 3 14 WATER PIPING SHALL BE PITCHED TO POINTS OF DRAINAGE WITH CONSTANT UNIFORM SLOPE. w <br /> PHASE: 1 w CD <br /> G9E 1 PRE-RINSE FAUCET 2 2 2 2 2 15 INSTALL HORIZONTAL PIPING AS HIGH AS POSSIBLE WITHOUT SAGS OR HUMPS. Z <br /> WEIGHT (LBS): 6.7 0 <br /> 16 GRADE DRAINAGE AT UNIFORM SLOPE OF NOT LESS THAN 1/4" PER FOOT TOWARD THE POINT OF DISPOSAL. J <br /> REMARKS: (1 )(2)(3) ��6 2 HAND SINK 1 2 2 2 4 WHEN APPROVED BY ADMINISTRATIVE AUTHORITY, PIPE SIZE 4" AND LARGER MAY HAVE A SLOPE OF NOT LESS m <br /> (1 ) ALL BRONZE PUMP, 125 PSI MIN. RATED. THAN 1/8" PER FOOT. Q <br /> G54 1 CARBONATOR 0.5 0.5 - 0.5 0.5 17 WHERE CHANGES IN PIPE SIZES OCCUR, USE ONLY REDUCING FITTINGS. <br /> (2) WITH 1 " FLANGE CONNECTION. ~ <br /> 18 FOR DRAINAGE PIPING CHANGES IN DIRECTION, USE LONG SWEEP WHERE POSSIBLE, OTHERWISE, SHORT Z <br /> FD-1 4 FLOOR DRAIN - - - - - <br /> (3) COORD. WITH ELEC'L CONTRACTOR FOR POWER SWEEP 1/4 BENDS, OR COMBINATION WYE AND 1/8 BENDS; USE SANITARY TEE BRANCHES ONLY FOR o0 <br /> HORIZONTAL BRANCHES DISCHARGING TO STACKS. Ui <br /> TO PUMP. FS-1 4 FLOOR SINK - - - 2 8 <br /> 19 INSTALL SECTIONALISING VALVES AND ON EACH BRANCH LINE TO MULTI-FIXTURE GROUPS. LOCATE VALVES IN A < c-,I <br /> READILY ACCESSIBLE LOCATION, DO NOT CONCEAL. DO NOT LOCATE VALVE SYSTEMS BELOW HORIZONTAL UNLESS r� <br /> HB-1 2 HOSE BIBB 2 4 - - - INDICATED ON PLANS. LOCATE ANGLE STOP VALVES BELOW THE SINK OR WATER CLOSET. CD <br /> GAS SIZING 20 WATER SUPPLY TO ALL FIXTURES AND CONTAINERS SHALL BE SO INSTALLED AS TO PREVENT POSSIBLE a a a a a a a a <br /> BACK SIPHONAGE OF POLLUTED WATER. ALL SUPPLIES SHALL BE EITHER ABOVE THE FLOOD RIM OF THE <br /> FIXTURE OR SEPARATED FROM THE DRAINAGE END BY MEANS OF AN APPROVED VACUUM BREAKERS. <br /> 21 PROVIDE PIPING AND FIXTURE TRAPS. CONNECT TO FIXTURES AND OTHER EQUIPMENT INDICATED OR <br /> QTY DESCRIPTION CFH TOTAL CFH TOTAL 25.5 12 34.5 SPECIFIED AS REQUIRING SOIL, WASTE, DRAIN AND VENT FACILITIES. <br /> PER UNIT NOTES: 22 LAY ALL PIPING TRUE TO LINE AND GRADE, FIT ENDS TOGETHER, MATCH SO THAT SEWER OR DRAIN WILL <br /> HAVE SMOOTH AND UNIFORM INSERT. FOLLOW LOCATIONS AND ELEVATIONS AT SITE. AS THE PIPE <br /> 1 GAS WATER HEATER 76 76 <br /> 1 . WATER SUPPLY FIXTURE UNITS ARE BASED ON CPC LAYING WORK SPROGRESSES,OPPAGE CLSARPR PIPE <br /> INTERIOR <br /> OF CEMENT, <br /> PLUGS OR IRT, AND <br /> D DIRT, <br /> TR OPENENDSS OFMATERIALS. <br /> DRAINS. <br /> 2. DRAINAGE FIXTURE UNITS ARE BASED ON CPC <br /> 2 HVAC UNITS 200 200 23 PROVIDE CLEANOUTS WHERE INDICATED AND AT INTERVALS OF 100' OR AS REQUIRED BY LOCAL PLUMBING Q <br /> CODE AND WHERE REQUIRED AT CHANGES OF DIRECTIONS OF SOIL AND WASTE STACKS. INSTALL <br /> CLEANOUTS SO AS TO BE ACCESSIBLE FOR EASY REMOVAL AND TO PROVIDE CLEARANCE FOR RODDING. W <br /> TOTAL 276 CLEANOUTS SHALL BE THE SAME SIZE AS PIPE SERVED EXCEPT THAT NO CLEANOUT NEED BE LARGER THAN O <br /> FOUR INCHES. <br /> ' GAS WATER HEATER SIZING 24 EXTEND VENT PIPES 12 INCHES ABOVE ROOF AND 10FT MINIMUM AWAY FROM ANY FRESH AIR INTAKES 0- W c) <br /> 1 . SIZE GAS PIPING PER CPC TABLE 1216.2(l ) 125 LENGTH AND AT LEAST 48 INCHES AWAY FROM A PARAPET WALL. O Q � <br /> FIXT. ID QTY DESCRIPTION DEMAND TOTAL 25 SANITARY VENT PIPING SHALL BE GRADED SO THAT THE AIRFLOW TO THE OUTSIDE WILL BE CONTINUOUSLY fr <br /> GASSIZING (FUTURE TENANT) LV-1 2 LAVATORY 5 GPH 10 GPH UPWARD AND SO THAT NO LOW POINTS WILL BE DRAINED. Z Q <br /> 26 MAKE TIGHT CONNECTION BETWEEN WATER CLOSET FLANGES AND EARTHENWARE FIXTURE BY MEANS OF O <br /> G16A 2 HANDSINK 5 GPH 10 GPH AN APPROVED MOLDED WAX RING OR SETTING COMPOUND AND BOLTING. O <br /> QTY DESCRIPTION CFH TOTAL CFH 27 VENTS: PROVIDE FLASHING FOR STACKS PASSING THROUGH ROOF. MAKE WATER-TIGHT AT ROOF. DO NOT J <br /> PER UNIT G7 1 MOP SINK 15 GPH 15 GPH LOCATE VENT THROUGH ROOF LESS THAN 24 INCHES FROM A PARAPET WALL. U <br /> Cn <br /> 1 STUB FOR FUTURE TENANT 1000 1000 G9E 1 3-COMPARTMENT SINK 45 GPH 45 GPH 28 ALL PLUMBING FIXTURES AND PIPING ARE TO BE LISTED BY AN APPROVED LISTING AND TESTING AGENCY O W w W <br /> AND PROPERLY LABELED. ' ` � � � <br /> 2 HVAC UNITS 240 240 29 COORDINATE ALL LOCATIONS, SIZES, AND ELEVATIONS OF ALL SLEEVES THROUGH WALLS, BEAMS, SLABS AND z <br /> W U z <br /> SUBTOTAL = 80 GPH FOOTING WITH STRUCTURAL AND ARCHITECTURAL DRAWINGS. ALL PIPES SLEEVING THROUGH FOOTINGS SHALL <br /> HAVE A SLEEVE DIAMETER OF TWO PIPE SIZES OVER THE PIPE PASSING THROUGH THE FOOTING. NO PIPE TO O Q <br /> TOTAL 1240 DEMAND FACTOR: 0.8 BE PLACED THROUGH FOOTING UNLESS APPROVED BY THE STRUCTURAL ENGINEER. Q z <br /> HOT WATER DEMAND: 0.8 X 80 GPH = 64 GPH 30 ALL PIPES SHALL BE PROTECTED AT THE POINT THEY CROSS BUILDING EXPANSION JOINT, U Q <br /> 1 . SIZE GAS PIPING PER CPC TABLE 1216.2(l ) -150' LENGTH EITHER WITH AN EXPANSION FITTINGS OR IN ANOTHER MANNER ACCEPTABLE TO THE ENGINEER. W� <br /> MODEL A.O. SMITH, BTX-80 31 PLUMBING CONTRACTOR SHALL CONNECT ALL GAS PIPING TO ALL GAS RELATED UNITS PER PLAN WITH LISTED ) <br /> RECOVERY RATE 83 GPH @ 1007 TEMPERATURE RISE AND APPROVED GAS SHUT-OFF VALVE, SEDIMENT TRAP, AND UNION. <br /> GAS INPUT 76 BTU <br /> STORAGE CAPACITY 50 GALLONS 32 FAUCET CONTROLS SHALL BE OPERABLE WITH ONE HAND AND SHALL NOT REQUIRE TIGHT GRASPING, <br /> PINCHING, OR TWISTING OF THE WRIST. THE FORCE REQUIRED TO ACTIVATE CONTROLS SHALL BE NO GREATER <br /> THAN 5 POUNDS. <br /> 33 PENETRATION OF FLOOR/CEILING ASSEMBLIES AND ASSEMBLIES REQUIRED TO HAVE A FIRE-RESISTANCE <br /> RATING SHALL BE PROTECTED IN ACCORDANCE WITH THE BUILDING CODE. <br /> 34 WHERE WATER PRESSURE WITHIN A BUILDING EXCEEDS 80 PSI, AN APPROVED WATER-PRESSURE REDUCING <br /> VALVE CONFORMING TO ASSE 1003 WITH STRAINER SHALL BE INSTALLED TO REDUCE THE PRESSURE IN THE Project Number <br /> BUILDING WATER DISTRIBUTION PIPING TO 80 PSI STATIC OR LESS. SPA16002.0 <br /> 35 DISINFECTION OF POTABLE WATER SYSTEM SHALL COMPLY WITH THE LOCAL AND THE STATE PLUMBING <br /> CODE. <br /> 36 PROPER ACCESS MUST BE PROVIDED FOR THE TESTING AND MAINTENANCE OF THE BACKFLOW PREVENTER. Sheet Name <br /> IF THE BACKFLOW PREVENTER IS INSTALLED MORE THAN 5'-0" ABOVE THE FLOOR, SPECIAL PROVISIONS <br /> MUST BE MADE. NOTES <br /> 37 PROVIDE AND INSTALL A SINGLE GAS ISOLATION VALVE FOR THE MULTIPLE GAS METER BANKS FOR 7 <br /> THE ENTIRE BLDG. SCHEDULES <br /> 38 ALL PIPING SHALL MAINTAIN AT LEAST 5'-0" CLEARANCE IN FRONT OF THE HVAC SUPPLY AND RETURN <br /> OPENINGS. <br /> 39 PLASTIC PIPES ARE NOT PERMITTED TO BE INSTALLED WITHIN THE AIR PLENUM SPACE. <br /> 40 HUNG WASTE PIPING SHALL BE STRUCTURALLY SUPPORTED AS TIGHT AS POSSIBLE BELOW THE <br /> STRUCTURAL BEAMS TO GAIN MORE HEAD SPACE AS IT PITCH TOWARDS THE LOWEST POINT TO <br /> KEEP WASTE PIPING WITHIN THE CEILING SPACE. Sheet Number <br /> 41 CONTRACTOR TO PROVIDE AND INSTALL QUICK DISCONNECT GAS LINES AT ALL COOKING EQUIPMENT. <br /> 42 NO NON-METALLIC PIPING IS ALLOWED WITHIN THE RETURN-AIR PLENUMS. <br /> POm2 <br />