op
<br /> ROBISON
<br /> ENGINEERING, INC
<br /> 19401 40TH AVE W.,SUITE 302
<br /> LYNNWOOD,WA 98036
<br /> 206.364.3343 TEL
<br /> CONTACT:MARK MANGLICMOT
<br /> OFESS/pN
<br /> D• Rp�q��
<br /> Z Z
<br /> TABLE OF CONTENTS
<br /> BUILDING ENERGY ANALYSIS REPORT W o. M-28712
<br /> - 0-19
<br /> �FCHAS\CP
<br /> F OF CA��F�
<br /> Cover Page 1 Seal 03-22-18
<br /> Table of Contents 2 PROJECT:
<br /> Form PRF-01-E Certificate of Compliance 3 Arca Antioch bp
<br /> Form ENV-NIM Envelope Mandatory Measures 21 SWC Hillcrest and Wildflower
<br /> Antioch, CA 94531 = ® ®®
<br /> Project Designer:
<br /> Robison Engineering, Inc. Q
<br /> 19401 40th Ave VV, Suite 302 _
<br /> Lynnwood, VITA 98036
<br /> (200) 364-3343
<br /> Project Name: Arco Hillcrest&Wildflower-Antioch NRCC-PRF-01-E Page 2 of 18 Project Name: Arco Hillcrest&Wildflower-Antioch NRCC-PRF-01-E Page 1 of 18
<br /> Project Address: 5WC Hillcrest and Wildflower Antioch 94531 Calculation Date/Time: 12:15,Mon,Mar 12,2018 Project Address: 5WC Hillcrest and Wildflower Antioch 94531 Calculation Date/Time: 12:15,Mon,Mar 12,2018 Report Prepared by:
<br /> Compliance Scope: NewEnvelopeAndMechanical Input File Name: 18-0308 Arca Hillcrest Antioch,CA.cibdl6x Compliance Scope: NewEnvelopeAndMechanical Input File Name: 18-0308 Arca Hillcrest Antioch,CA.cibdl6x
<br /> C.PRIORITY PLAN CHECK/INSPECTION ITEMS(in order of highest to lowest TDV energy savings) A.PROJECT GENERAL INFORMATION Dee Lam
<br /> 1st Space Cooling:Check envelope and mechanical Compliance Margin By Energy Component(from Table B column 4) 1. Project Location(city) Antioch B. Standards Version Compliance2016 I Robison
<br /> �ob i so n Engineering k hsSuite
<br /> +� �7
<br /> 2nd Space Heating:Check envelope and mechanical Space Cooling 2. CA Zip Code 94531 9. Compliance Software(version) EnergyPro 7.1 19401 40th Avenue Y V, S U ite .302
<br /> J
<br /> 3rd Indoor Fans:Check envelope and mechanical Space Heating 3. Climate Zone 12 10. Weather File CONCORD_7241936CZ2010.epw f/� /► Q
<br /> Y
<br /> 4th Heat Rejection:Check envelope and mechanical Indoor Fans 4. Total Conditioned Floor Area in Scope 2,476 ftz 11. Building Orientation(deg) (S)180 deg Lynnwood, A 98036 �
<br /> Sth Pumps&Misc.:Check mechanical Heat Rejection 5. Total Unconditioned Floor Area 0 It, 12. Permitted Scope of Work NewEnvelopeAndMechanical 2063043343
<br /> Pumps&Misc.
<br /> 6th Domestic Hot Water:Check mechanical Domestic Hat Water 6. Total#of Stories(Habitable Above Grade) 1 13 Building Type(s) Nonresidential m
<br /> Indoor Lighting 7. Total#of dwelling units 0 114 Gas Type Propane (n
<br /> 7th Indoor Lighting:Check lighting
<br /> B.COMPLIANCE RESULTS FOR PERFORMANCE COMPONENTS(Annual TDV Energy Use,k8tu/ft 1-yr) §140.1 Z ~
<br /> D.EXCEPTIONAL CONDITIONS BUILDING COMPLIES j o
<br /> LU
<br /> The project shows partial compliance,either envelope only or mechanical only,excluding lighting systems.The building must show partial compliance including lighting or full new building 1.Energy Component 2.Standard Design(TDV) 3,Proposed Design(TDV) 4.Compliance Margin(TDV) 5.Percent Better than Standard CD
<br /> compliance or show prescriptive lighting compliance before operation Space Heating 14.70 1.76 12.94 88.0% z
<br /> D
<br /> The aged solar reflectance and aged thermal emittance must be listed in the Cool Raaf Rating Council database of certified products.For projects where initial reflectance is used,the initial Space Cooling 103.25 82.06 21.19 20.5% J
<br /> reflectance must be listed,and the aged reflectance is calculated by the software program and used in the compliance model. Indoor Fans 96.06 94.50 1.56 1.6% Job Number:
<br /> The building does not include service water heating.Verify that service water heating is not required and is not included in the design. m
<br /> Heat Rejection -- - -- -
<br /> E.HERS VERIFICATION Pumps&Misc. -- -- -- -- 424-906 J
<br /> Q
<br /> This Section Does Not Apply Domestic of Water
<br /> Indoor Lighting 98.95 98.95 0.0% z
<br /> F.ADDITIONAL REMARKS COMPLIANCE TOTAL 344.62 308.93 35.69 10.4% Date:
<br /> 00
<br /> Nona Provided Receptacle 96.38 96.38 0.0 0.0% LU
<br /> 3/12/2018
<br /> Process 40.24 40.24 0.0 0.0% i__ N-)Q CV
<br /> Other Ltg \
<br /> r7
<br /> TOTAL 481.24 445.55 35.7 7.4%1 CD
<br /> The EnergyPra computer program has been used to perform the calculations summarized in this compliance report.This program has approval and is �t
<br /> authorized by the California Energy Commission for use With both the Residential and Nonresidential 2016 Building Energy Efficiency Standards. a a a a a a a a
<br /> Q
<br /> This program developed by EnergySoft Software-www.energys6ft.cum.
<br /> EnergyPro 7.1 by EnergySoft Job Number: ID:424-906 User Number:8394
<br /> CA Building Energy Efficiency Standards-2016 Nonresidential Compliance Report Version:NRCC-PRF-01-E-08082017-4377 Report Generated at:2018-03-12 12:16:18 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance Report Version:NRCC-PRF-01-E-08082017-4377 Report Generated at:2018-03-1212:16:18
<br /> Project Name: Arco Hillcrest&Wildflower-Antioch NRCC-PRF-01-E Page 6 of 18 Project Name: Arco Hillcrest&Wildflower-Antioch NRCC-PRF-01-E Page 5 of 18 Project Name: Arco Hillcrest&Wildflower-Antioch NRCC-PRF-01-E Page 4 of 18 Project Name: Arco Hillcrest&Wildflower-Antioch NRCC-PRF-01-E Page 3 of 18
<br /> Project Address: SWC Hillcrest and Wildflower Antioch 94531 Calculation Date/Time: 12:15,Man,Mar 12,2018 Project Address: SWC Hillcrest and Wildflower Antioch 94531 Calculation Date/Time: 12:15,Man,Mar 12,2018 Project Address: SWC Hillcrest and Wildflower Antioch 94531 Calculation Date/Time: 12:15,Mon,Mar 12,2018 Project Address: 5WC Hillcrest and Wildflower Antioch 94531 Calculation Date/Time: 12:15,Mon,Mar 12,2018
<br /> Compliance Scope: NewEnvelopeAndMechanical Input File Name: 18-0308 Arco Hillcrest Antioch,CA.cibdl6x Compliance Scope: NewEnvelopeAndMechanical Input File Name: 18-0308 Arco Hillcrest Antioch,CA.cibdl6x Compliance Scope: NewEnvelopeAndMechanical Input File Name: 18-0368 Arco Hillcrest Antioch,CA.cibdl6x Compliance Scope: NewEnvelopeAndMechanical Input File Name: 18-0368Arco Hillcrest Antioch,CA.cibdl6x w
<br /> H.CERTIFICATE OF INSTALLATION,CERTIFICATE OF ACCEPTANCE&CERTIFICATE OF VERIFICATION SUMMARY(NRCI/NBCA/NRCV)- H.CERTIFICATE OF INSTALLATION,CERTIFICATE OF ACCEPTANCE&CERTIFICATE OF VERIFICATION SUMMARY(NRCI/NBCA/NRCV)- G.COMPLIANCE PATH&CERTIFICATE OF COMPLIANCE SUMMARY G.COMPLIANCE PATH&CERTIFICATE OF COMPLIANCE SUMMARY /O/� 57
<br /> recognized for compliance compliance Documentation Author to indicate which Certificates must be submitted for the features to be recd com Documentation Author to indicate which Certificates must be submitted for the features to be recognized for com I..L
<br /> g p Confirmed g p Confirmed The following building components are only eligible for prescriptive compliance.indicate which are the following building components may have mandatary requirements per Part 6.Indicate identify which building components use the performance or prescriptive path for compliance."NA"= Z not in project M
<br /> (Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify). (Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify). relevant to the project. which are relevant to the project. w M
<br /> See Tables G.and H.in MCH and LTI Details Sections for Acceptance Tests and forms by equipment. See Tables G.and H.in MCH and LTI Details Sections for Acceptance Tests and forms by equipment. For components that utilize the performance path,indicate the sheet number that includes mandatory notes on plans. I I I > M
<br /> Yes NA Prescriptive Requirement Compliance Forms Yes NA Mandatory Requirement Compliance Forms Location of Mandatory Notes on ■ � � O ` J
<br /> Building Component Compliance Forms(required forsubmittal) Pass Fail Building Component Compliance Forms(required jiorsubmittal) Pass Fail Building Component Compliance Path Compliance Forms(required forsubmittal) Q Q LO
<br /> Lighting(Indoor Commissioning:§120.8 Plans r
<br /> ❑NRCI-PLB-01-E-For all buildings with Plumbing Systems ❑ ❑ ®NRCI-ENV-01-E-For all buildings ❑ ❑ ❑ ® NRCC-LTI-Dl/02/03/D4/O5-E ❑ ® Simple Systems NRCC-CXR-01/02/03/OS-E rL.TL
<br /> Envelope Unconditioned)§140.6 ® Performance NRCC-PRF-ENV-DETAILS(section of the NRCC-PRF-01-L) Q
<br /> ❑ NRCI-PLB-02-E-required on central systems in high-rise residential,hotel/motel application. ❑ ❑ ® NRCA-ENV-02-F-NFRC label verification for fenestration ❑ ❑ ❑ ® Comiplex Systems NRCC-CXR-01/D2/04/DS-E
<br /> Envelope ❑ Prescriptive NRCC-ENV-01/02/03/04/OS/06-E
<br /> F-1 El El ® Lighting(Outdoor)§140.7 NRCC-LTO-01/02 03-E Electrical:§130.5 NRCC-ELC-01-E LJ %
<br /> / ❑ ® � Q
<br /> NRCI-PLB-03-E-Single dwelling unit systems in high-rise residential,hotel/motel application. ❑ ❑ ®NRCI-MCH-01-E-For all buildings with Mechanical Systems NA O
<br /> ❑ ® Lighting(Sign)§140.8 NRCC-LTS-01-E ❑ ® Solar Ready:§110.10 NRCC-SRA-01/02-E
<br /> Plumbing O /
<br /> v
<br /> ❑ NRCI-PLB-21-E-HERS verified central systems in high-rise residential,hotel/motel application. ❑ ❑ ® NRCA-MCH-02-A-Outdoor Air E] ❑ Covered Process: NRCC-PRC-01-E ® Performance NRCC-PRF-MCH-DETAILS(section of the NRCC-PRF-01-E)
<br /> El El El El NRCI-PLB-22-E-HERS verified single dwelling unit systems in high-rise residential,hotel/motel application. ® NRCA-MCH-03-A-Constant Volume Single Zone HVAC ❑ IN Parking Garage NRCC-PRC-02-E Mechanical E] Prescriptive NRCC-MCH-01/02/03/04/OS/06/07-E
<br /> ❑ NRCV-PLB-21-H-HERS verified central systems in high-rise residential,hotel/motel application. ❑ ❑ ❑ NRCA-MCH-04 H-Air Distribution Duct Leakage ❑ ❑ Solar Thermal Water NRCC-STH-01-E E] NA® Commercial Refrigeration NRCC-PRC-05-E W Q
<br /> ❑ ® ❑ ■
<br /> Heating:§140.5 ❑ ® Warehouse Refrigeration NRCC-PRC-06/07/08-E ■ ■ ■
<br /> ElUNRCV-PLB-22-H-HERS verified single dwelling unit systems in high-rise residential,hotel/motel1:1 El ® El El application. NRCA-MCH-0S-A-Air Economizer Controls ❑ ® Compressed Air NRCC-PRC-10-E Performance NRCC-PRF-PLB-DETAILS(section of the NRCC-PRF-01-E) W
<br /> ❑ NRCI-STH-01-E-Any solar water heating ❑ ❑ ® NRCA-MCH-06-A-Demand Control Ventilation ❑ ❑ ❑ ® Process Boilers NRCC-PRC-11-E Domestic Hot Water ❑ Prescriptive NRCC-PLB-DI-E O
<br /> ❑NRCI-LTI-01-E-For all buildings ❑ 71 NRCA-MCH-07-A-Supply Fan Variable Flow Controls El El ® NA /W
<br /> ❑ NRCI-LTI-02-E-Lighting control system,or for an Energy Management Control System(EMCS) ❑ ❑ ❑ NRCA-MCH-09-A-Valve Leakage Test ❑ ❑ ❑ Performance NRCC-PRF-LTI-DETAILS(section of the NRCC-PRF-01-E) 0 U) L.L J
<br /> ❑ NRCI-LTI-03-E-Line-voltage track lighting integral current limiter,or for a supplementary overcurrent protection panel used to ❑ ❑ ❑ NRCA-MCH-09-A-Supply Water Temp Reset Controls ❑ ❑ Lighting(Indoor Conditioned) ❑ Prescriptive NRCC-LTI-01/02/03/04/05-E U Q
<br /> energize only line-voltage track lighting Mechanical ❑ NRCA-MCH-10-A-Hydronic System Variable Flow Controls ❑ ❑ ® NA
<br /> Indoor Lighting O Q
<br /> ❑ NRCI-LTI-04-E-Two interlocked systems serving an auditorium,a convention center,a conference room,or a theater ❑ El ElNRCA-MCH-II-A-Auto Demand Shed Controls ❑ LiCoveredProcess: E] Performance S2(section of the NRCC-PRF-01-E) Q
<br /> ❑ NRCI-LTI-OS-E-Lighting Control Credit Power Adjustment Factor(PAF) ❑ ❑ E] Prescriptive NRCC-PRC-OS/03-E 7 L
<br /> ® NRCA-MCH-12-A-Packaged Direct Expansion Units El C1 Commercial Kitchens
<br /> ❑ NRCI-LTI-06-E-Additional wattage installed in a video conferencing studio ❑ ❑ El El El ® NA W�/'�
<br /> NRCA-MCH-13-A-Air Handling Units and Zone Terminal Units
<br /> ElNRCA-LTI-02-A-Occupancy sensors and automatic time switch controls. ❑ ❑ El Performance S3(section of the NRCC-PRF-01-E) V J
<br /> ❑ NRCA-MCH-14-A-Distributed Energy Storage ❑ ❑ Covered Process:
<br /> El NRCA-LTI-03-A-Automaticdaylightingcantrols Ll El NRCA-MCH-15-A-Thermal Energy Storage El ❑ Computer Rooms ❑ Prescriptive NRCC-PRC-01/04-E
<br /> ❑ NRCA-LTI-04-A-Demand responsive lighting controls ❑ ❑ ❑ NRCA-MCH-16-A-Supply Air Temp Reset Controls ❑ ❑ ® NA
<br /> ❑NRCI-LTO-01-E-Outdoor Lighting ❑ ❑ El Performance 54(section of the NRCC-PRF-01-E)
<br /> ❑ NRCA-MCH-17-A-Condensate Water Temp Reset Controls I 1 LiCovered Process:
<br /> Outdoor Lighting ❑ NRCI-LT0-02-E-EMCS Lighting Control System ❑ ❑ Laboratory Exhaust ❑ Prescriptive NRCC-PRC-01/09-E
<br /> ElNRCA-MCH-18•A-Energy Management Controls Systems ❑ ❑
<br /> ❑ NRCA-LTO-02-A-Outdoor Lighting Control ❑ ❑ ® NA
<br /> ❑ NRCV-MCH-04-H-Duct Leakage Test 1:1 El
<br /> Sign Lighting ❑NRCI-LTS-01-E-Sign Lighting ❑ ❑
<br /> Electrical ❑NRCI-ELC-01-E-Electrical Power Distribution ❑ ❑
<br /> Photovoltaic ❑NRCI-SPV-01-E Photovoltaic Systems ❑ ❑
<br /> Project Number
<br /> CA Building Energy Efficiency Standards-2016 Nonresidential Compliance Report Version:NRCC-PRF-01-E-08082017-4377 Report Generated at:2018-03-12 12:16:18 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance Report Version:NRCC-PRF-01-E-08082017-4377 Report Generated at:2018-03-12 12:16:18 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance Report Version:NRCC-PRF-01-E-08082017-4377 Report Generated at:2018-03.12 12:16:18 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance Report Version:NRCC-PRF-01-E-08082017-4377 Report Generated at:2018-03-12 12:16:19
<br /> SPA16002.0
<br /> Sheet Name
<br /> MECHANICAL
<br /> T-24 FORMS
<br /> Sheet Number
<br /> MOm3
<br />
|