My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
927
>
1600 - Food Program
>
PR0544598
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 10:30:21 AM
Creation date
8/11/2020 3:06:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0544598
PE
1625
FACILITY_ID
FA0025347
FACILITY_NAME
HIGH WATER BREWING TAPROOM AND BREWERY
STREET_NUMBER
927
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
927 INDUSTRIAL WAY
P_LOCATION
02
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES LEGEND <br /> A. ALL PENETRATIONS THROUGH THE EXTERIOR BUILDING <br /> SURFACE SHALL BE PROPERTY SEALED AND CAULKED SUPPLY AIR REGISTER,CEILING <br /> WEATHERTIGHT.ROOF PENETRATIONS SHALL HAVE <br /> ROOF JACK AND STORM COLLAR,WITH ASSEMBLY HOT ql—� SUPPLY AIR REGISTER,WALL <br /> MOPPED TO THE ROOF STRUCTURE FOR A WEATHER ' <br /> PROOF CONNECTION. <br /> B. SUB CONTRACTOR SHALL DESIGN ENTIRE HVAC SYSTEM l❑ RETURN AIR REGISTER,CEILING ARCHITECTURE <br /> AND SUBMIT DESIGN FOR OWNER'S APPROVAL PRIOR <br /> TO ORDERING MATERIALS OR EQUIPMENT.HEATING NIS RETURN AIR REGISTER,WALL <br /> I <br /> SYSTEMS SHAUL BE SIZED TO ACCOMMODATE AIR <br /> CONDITIONING. EXHAUST AIR REGISTER,S.M.D. <br /> C. ALL EQUIPMENT INSTALLED IN THIS PROJECT SHALL <br /> COMPLY WITH THE REFERENCE STANDARDS LISTED IN RESTROOM 75 CFM EXHAUST FAN- 120V ON <br /> APPENDIX C OF U.M.C. LIGHT SWITCH ARCHITECT <br /> D. HVAC EQUIPMENT GENERATING A GLOW,SPARK OR <br /> FLAME AND LOCATED IN A GARAGE SHALL BE ��� 8"DUCT FRESH AIR INTAKE W/GALV.HOOD NJ ASSOCIATES <br /> INSTALLED NO LESS THAN 18"ABOVE THE FLOOR. AND INSECT SCREEN 22769 N BENDER ROAD <br /> E. ALL MECHANICAL EQUIPMENT NOT INSTALLED ON A F ACAMPO CA 95220 <br /> PLATFORM AND LOCATED WITHIN NORMAL VEHICULAR RETURN REGISTER,DUCT <br /> PATHS SHALL BE INSTALLED BEHIND SUITABLE 209.727.2040 <br /> PROTECTIVE BARRIERS. SUPPLY REGISTER,DUCT www.njaarchitecture.com <br /> F. IN BATHROOMS,LAUNDRY ROOMS AND SIMILAR SUPPPLY AIR SPIRAL DUCT 24 GAGE-SEE <br /> ROOMS WITHOUT REQUIRED NATURAL VENTILATION. PLAN FOR SIZING.R-8 CLIENT <br /> PROVIDE A MECHANICAL VENTILATION SYSTEM <br /> CAPABLE OF FIVE AIR CHANGES PER HOUR AND ==a=_= RETURN AIR SPIRAL DUCT 24 GAGE HIGH WATER BREWING <br /> CONNECTED DIRECTLY TO OUTSIDE AIR. <br /> G. FREESTANDING AND BUILT-IN COOK-FOPS SHALL HAVE SUPPLY AIR FLEXIBLE DUCT R-8 INSULATED- <br /> A VERTICAL CLEARANCE ABOVE THE COOKING SURFACE SEE PLAN FOR SIZING <br /> OF NOT THAN 24"TO A METAL VENTILATION HOOD ____ __ RETURN AIR FLEXIBLE DUCT-SEE PLAN FOR <br /> AND NOT LESS THAN 30"TO UNPROTECTED SIZING <br /> COMBUSTIBLE MATERIAL. WALL MOUNTED THERMOSTAT WITH <br /> H. HORIZONTAL CLEARANCES FROM COOKING SURFACES FURNACE CONTROLLED <br /> Ll SHALL BE NOT LESS THAN THAT DISTANCE PROJECT <br /> PERMANENTLY INDICATED ON THE COOKING UNIT. __________= EXTERIOR DOOR WITH VENTS FOR COMBUSTION <br /> I. GAS VENTS SHALL BE EFFECTIVELY DRAFT-STOPPED AT AIR,SEE DOOR SCHEDULE HIGH WATER BREWING <br /> EACH FLOOR AND CEILING. 927 INDUSTRIAL WAY <br /> J. EXHAUST FANS SHALL BE DUCTED TO OUTSIDE AIR LODI CA 95240 <br /> AND SHALL BE EQUIPPED WITH BACKDRAFT DAMPERS. <br /> AC IA GRILL SIZING <br /> I I <br /> I I RETURN AIR SPIRAL DUCT GRILLE DIFFUSER <br /> I I R1 RECT. <br /> I I <br /> I I <br /> L---- -----J <br /> AC-2 R2 <br /> AC-1 B I — R3 RETURN AIR GRILLE WALL MOUNT <br /> F <br /> __ _ _ _ I I <br /> I I R4 RETURN AIR GRILLE CEILING MOUNT <br /> I I I I <br /> I <br /> I } <br /> o O L — — — — — — — — — SUPPLY AIR SPIRAL DUCT GRILLE DIFFUSER <br /> HEAT-2 �• , S1 RECT. <br /> L _ _ J <br /> S2 - <br /> AC-3 S3 SUPPLY AIR GRILLE CEILING MOUNT <br /> I I 54 SUPPLY AIR GRILLE CEILING MOUNT <br /> I I <br /> I I <br /> AC-4 I <br /> L - -J <br /> 18"SQ.FIRE DAMPER W/FUSABLE LINK <br /> L _i_ J r — — ———— <br /> � <br /> HEAT-1 • a i F2 20"SQ.FIRE DAMPER W/FUSABLE LINK <br /> f_I_ -1 L — — ———— <br /> � <br /> L _ _ J 54 S4 <br /> KITCHEN R4 PANTRY SCOPE OF WORK <br /> r R4 HALLWAY S4 A. FURNISH ALL LABOR AND MATERIALS FOR A COMPLETE <br /> wH INSTALLATION OF THE MECHANICAL SYSTEM AS <br /> � � SHOWN,NOTED,REQUIRED AND IMPLIED.THIS SHALL <br /> PAC-5 <br /> S4 R4 INCLUDE,BUT IS NOT LIMITED TO THE FOLLOWING <br /> F1 SUMMARY.CONTRACTOR SHALL BE RESPONSIBLE FOR <br /> S4 DETERMINING ALL QUANTITIES: <br /> MENS 51 S1 B. MECHANICAL SYSTEMS COMPLETE INCLUDING ALL <br /> r- - - - � - - - I� <br /> L I 54 I I I FITTINGS,HANGERS,SWAY AND SEISMIC BRACING AND <br /> ' N I I I ACCESSORIES. <br /> HEAT-1 o I° I ,1 _ _ _ 1 - - J�1 51 <br /> C. TESTING,CLEANING AND GUARANTEE OF MECHANICAL <br /> 7— —1 <br /> 51 R3 = _ _ _ _ _ � 4 4 L__-- I WORK. <br /> L _ _ J I I F2 D. ALL EQUIPMENT,FIXTURES AND DEVICES SHALL BE ARCHITECTS STAMP <br /> LIL <br /> PRODUCTION INSTALLED IN ACCORDANCE WITH MANUFACTURER'S <br /> I <br /> RECOMMENDATIONS. <br /> R4 LAB I E. CONTRACTOR SHALL REFER TO THE ARCHITECTURAL gE A <br /> �S1 I I R1 R1 DRAWINGS FOR THE EXACT LOCATION OF ALL <br /> BUILDING PENETRATIONS AND FRAMING i JpHN A VIERFdA <br /> IWOMENS . R4 REQUIREMENTS.THE CONTRACTOR SHALL VERIFY ALL <br /> BREWERY WALK-IN i ___________=i PROPOSED BUILDING PENETRATIONS WITH THE * c-35199 <br /> SEATING BAR COOLER I I S4 I I ARCHITECT BEFORE BEGINNING ANY INSTALLATION. 10-31-2019 <br /> s4 <br /> � <br /> L _I_ J I S1 I S1 S1 I I S1 ��F CAS-�Fo <br /> HEAT-] ' ^ r _�_ � � AC-11 __ AG-8 _ _�_ F " T MECHANICAL SCHEDULE <br /> LI <br /> L_ _ J s AC-9 I s1 REVISIONS <br /> $1 I I I I <br /> I I I I L = J UNIT NEW/ MODEL# BTU BTU A TENANT No. Description Date By <br /> L_ ___J �� L _ _ _ _ _ _ _ITJ �r F R3 EXIST IN OUT <br /> R3 - - --- ---- � II II <br /> BREWERY I AC-1 A E DUAL UNIT YCDI50C3LOBA 10/1997 150K 1 22K 24.3 X 2 C <br /> I R1 AC-1 B E 4YCC3060A3096BA 2/2015 96K 77.5K 15.6 C <br /> ii ACAC-7 —- R1 I R1 PRODUCTION R1 I I AC-2 E YCC048F3MOBD 9/1997 80K 64 15.1 C <br /> L 1— D I i S1 Sim AC-3 E 3MOBD 60K 48K 11.4 C <br /> ,� - - - - - - 1 - - - °�' - - - - - - - - - - - R1 I TASTING SEATING <br /> S1 AC-4 E YHC060A3ELA0000 6/2004 60K 48K 17.4 Project No.: 17043 <br /> BAR y <br /> S3 R3 F — I I AC-5 E YCD075C3LOBE 11/1997 120K 97.2K 21.8 DrawnB : <br /> I -- --_—_—_ —_—_—_—_—_—_ —_ --_—_ <br /> AC-6 E YCC036F3MOBD 10/1997 60K 48K 11.6 Checked By: <br /> i <br /> AC-10 I I I i AC-7 E YCC036F3MOBD 11/1997 60K 48K 11.6 <br /> L — — — _ I I AC-8 F DUAL UNIT YCD120C3LOAB 10/1997 135K 109K 19 X 2 <br /> IL F R3 AC-9 E YCC060F3MOBF 10/1997 100K 80K 19.5 <br /> AC-10 E YCC048F3MOBD 9/1997 80K 64 15.1 NOT FOR CONSTRUCTION <br /> SEATING AC-11 E HEAT PUMP 4TW133024C1000AA 1/2012 8.9 <br /> s1 s1 s1 s1 s1 s1 s1 PERMIT SET <br /> IT 04.04.18 <br /> s1 <br /> F2 <br /> a <br /> HEAT-1 NEW GAS OVERHEAD MECHANICAL PLAN <br /> HEATER <br /> MECHINCAL PLAN <br /> 0 <br /> N <br /> R <br />
The URL can be used to link to this page
Your browser does not support the video tag.