AGREEN BUILDING CODE SECTION COMPLIANCE NOTESDETAILSCALENONEBGREEN BUILDING CODE COMPLIANCE NOTESDETAILSCALENONETHE GENERAL CONTRACTOR SHALL SUBMIT A WASTE MANAGEMENT PLAN AT TIMEOF PERMITTING TO INCLUDE THE FOLLOWING:A. IDENTIFY THE MATERIALS TO BE DIVERTED FROM DISPOSAL BY RECYCLING,REUSE ON THE PROJECT, OR SALVAGE FOR FUTURE USE OR SALE.B. SPECIFY IF MATERIALS WILL BE SORTED ON-SITE OR MIXED FORTRANSPORTATION TO A DIVERSION FACILITY.C. IDENTIFY THE DIVERSION FACILITY WHERE THE MATERIALS COLLECTED WILL BETAKEN.D. SPECIFY THAT THE AMOUNT OF MATERIALS DIVERTED SHALL BE CALCULATEDBY WEIGHT OR VOLUME, BUT NOT BOTH.CCONSTRUCTION WASTE MANAGEMENT PLANSCALENONE31. POLLUTANT CONTROL DOCUMENTATION SHALL BE PROVIDE INDICATECOMPLIANCE WITH SECTION 5.504 AND SHALL INCLUDE AT LEAST ONE OFTHE FOLLOWING;-PRODUCT CERTIFICATIONS AND SPECIFICATIONS, CHAIN OF CUSTODYCERTIFICATIONS, OR OTHER METHOD ACCEPTABLE TO THE REINFORCINGAGENCY. CGBC 5.504.4.5.232.FOR INDOOR MOISTURE CONTROL, BUILDINGS SHALL COMPLY WITH CBCSECTION1203 (VENTILATION) AND CHAPETR 14 (EXTERIOR WALLS) . CGBC5.505 ALSO REFER TO THE REQUIREMENTS OF CGBC 5.407 THAT REFERENCECBC SECTION 1403.2 (WEATHER PROTECTION), CEC SECTION 150(MANDATORY FEATURES AND DEVICES), AND TEXT INDICATING THE PROPERDESIGN OF SPRINKLERS AND BUILDING OPENINGS SHALL HELP ASSUREWATER REMAINS OUTSIDE THE BUILDING. CGBC 5.505.133.SPECIAL INSPECTION IS REQUIRED FOR ALL CAL-GREEN DESIGN FEATURESAND MANDATORY MEASURES. SUBMIT THE NAME AND QUALIFICATIONSOFTHE PERSON ANTICIPATED TO PERFORM THE INSPECTIONS.35. SUBMIT THE FOLLOWING FORMS/WORKSHEET.-CONSTRUCTION WASTE MANAGEMENT PLAN-CONSTRUCTION WASTE MANAGEMENT WORKSHEET-CONTSRUCTION WASTE MANAGEMENT ACKNOWLEDGEMENT.36.A WATER BUDGET SHALL BE DEVELOPED FOR LANDSCAPE IRRIGATION THATCONFORMS TO THE LOCAL WATER EFFICIENT LANDSCAPE ORDINANCE ORTO THE CALIFORNIA DEPARTMENT OF WATER RESOURCES MODEL WATEREFFICIENT LANDSACPE ORDINANCE. CGBC 5.304.137.AUTOMATIC IRRIGATION CONTROLLERS THAT ARE WEATHER OR SOILMOISTURE-BASED SHALL BE INSTALLED AT THE TIME OF FINAL INSPECTION.CGBC 5.304.3.138.PROVIDE A WEATHER RESISTANT EXTERIOR WALL AND FOUNDATIONENVELOPE PER CBC SECTION 1403.2, CEC SECTION 150, ANDMANUFACTURER'S INSTALLATION INSTRUCTIONS OR LOCAL ORDINANCES.39.SPRINKLERS SHALL BE DESIGNED TO PREVENT SPRAY ON STRUCTURES.CGBC 5.407.140. AN OPERATION AND MAINTENANCE MANUAL WITH CONTENT PER 5.410.4.5.AND IN A FORMAT ACCEPTABLE TO THE ENFORCING AGENCY SHALL BEPLACED IN THE BUILDING AT THE TIME OF FINAL INSPECTION. CGBC 5.410.4.5.1. ALL DUCTS AND OTHER RELATED AIR DISTRIBUTION COMPONENT OPENINGSSHALL BE COVERED WITH TAPE, PLASTIC, OR SHEET METAL UNTIL THE FINALSTARTUP OF THE HEATING AND COOLING EQUIPMENT. (5.503.1)2 . ARCHITECTURAL PAINTS AND COATINGS, ADHESIVES, CAULKS AND SEALANTSSHALL COMPLY WITH VOLATILE ORGANIC COMPOUND (VOC) LIMITS LISTED INTABLE 5.504.4.1-5.504.4.3 (5.504.4.1-5.504.4.3)3. THE VOC CONTENT VERIFICATION CHECKLIST SHALL BE COMPLETED ANDVERIFIED PRIOR TO FINAL INSPECTION APPROVAL. THE MANUFACTURE'SSPECIFICATIONS SHOWING VOC CONTENT FOR ALL APPLICABLE PRODUCTS SHALLBE READILY AVAILABLE AT THE JOB SITE AND BR PROVIDED TO THE FIELDINSPECTOR FOR VERIFICATION. (5.504.4)4. ALL NEW CARPET INSTALLED IN THE BUILDING INTERIOR SHALL MEET THETESTING AND PRODUCT REQUIREMENTS OF ONE OF THE FOLLOWING:A.CARPET AND RUG INSTITUTE'S GREEN LABEL PLUS PROGRAMB.CALIFORNIA DEPARTMENT OF PUBLIC HEALTH STANDARD PRACTICE FORTHE TESTING OF VOCS (SPECIFICATION 01350)C.NSF/ANSI 140 AT THE GOLD LEVELD.SCIENTIFIC CERTIFICATIONS SYSTEMS INDOOR ADVANTAGE GOLD (5.504.4.4)5. ALL NEW CARPET CUSHION INSTALLED IN THE BUILDING INTERIOR SHALL MEETTHE REQUIREMENTS OF THE CARPET AND RUG INSTITUTE GREEN LABELPROGRAM. (5.504.4.4.1)6. NEW HARDWOOD PLYWOOD, PARTICLE BOARD, AND MEDIUM DENSITYFIBERBOARD COMPOSITE WOOD PRODUCTS USED IN THE INTERIOR OR EXTERIOROF THE BUILDING SHALL MEET THE FORMALDEHYDE LIMITS LISTED IN TABLE5.504.4.5 (5.504.4.5)7. THE FORMALDEHYDE EMISSIONS VERIFICATION CHECKLIST, SHALL BECOMPLETED PRIOR TO FINAL INSPECTION APPROVAL. THE MANUFACTURE'SSPECIFICATIONS SHOWING FORMALDEHYDE CONTENT FOR APPLICABLE WOODPRODUCTS SHALL BE READILY AVAILABLE AT THE JOB SITE AND BE PROVIDED TOTHE FIELD INSPECTOR FOR VERIFICATION (5.504.4.5)8. AN AIR FILTER WITH A MAXIMUM EFFICIENCY REPORTING VALUE (MERV) OF 8OR HIGHER SHALL BE INSTALLED IN THE MECHANICAL SYSTEM FOR OUTSIDE ANDRETURN AIR PRIOR TO OCCUPANCY. (5.504.5)9. DESIGNATED OUTDOOR SMOKING AREA SHALL BE AT LEAST 25 FEET FROM ANOUTDOOR AIR INTAKE OR OPERABLE WINDOWS. (5.504.5)10. THE BUILDING SHALL MEET OR EXCEED THE PROVISIONS FOR MECHANICALVENTILATION OF SECTION 1203 OF CALIFORNIA BUILDING CODE. CGBC (5.504.7)11. BUILDINGS THAT USE DEMAND CONTROL VENTILATION SHALL HAVE COâ‚‚SENSORS AND VENTILATION CONTROLS INSTALLED IN ACCORDANCE WITH THEREQUIREMENTS OF THE CURRENT EDITION OF THE CALIFORNIA ENERGY CODE,CCR, TITLE 24, PART 6, SECTION 121 (C). (5.506.2)12. THE HVAC, REFRIGERATION, AND FIRE SUPPRESSION EQUIPMENT SHALL NOTCONTAIN CFC OR HALONS. (5.508.1)13. INTERIOR AND EXTERIOR LIGHTING SHALL BE DESIGNED SUCH THAT ZERODIRECT-BEAM ILLUMINATION LEAVES THE BUILDING SITE (5.106.8)14. ALL EXTERIOR LUMINAIRES SHALL BE SHIELDED OR BE CUTOFF LUMINAIRES ASDEFINED IN SECTION 132 (b) OF THE CALIFORNIA ENERGY CODE. (5.106.8)15. INTERIOR LIGHTING SHALL BE CONTAINED WITHIN EACH SOURCE. (5.106.8)16. NO MORE THAN .01 HORIZONTAL FOOTCANDLES SHALL ESCAPE 15 FEETBEYOND THE SITE BOUNDARY. (5.106.8)17. ALL EXTERIOR LIGHTING SHALL HAVE CONTROLS THAT AUTOMATICALLY TURNOFF OR LOWER LIGHT LEVELS DURING INACTIVE PERIODS FROM DUSK TO DAWN.(5.106.8)18. A SOUND TRANSMISSION COEFFICIENT (STC) OF AT LEAST 50 FOR THEBUILDING ENVELOPE, AND 30 FOR THE WINDOWS SHALL BE PROVIDED WHERE THEPROJECT IS :A. WITHIN 1000 FT OF FREEWAYSB. WITH IN 5 MILES OF AIRPORTS SERVING 10,000 COMMERCIAL FLIGHTS PER YEARC. WITH IN AREAS WHERE THE SOUND LEVELS AT THE PROPERTY LINEREGULARLY EXCEED 65 DB. CGBC 5.507.4.119. NEW PLUMBING FIXTURES AND FITTINGS SHALL NOT EXCEED THE MAXIMUMALLOWABLE FLOW RATE SPECIFIED IN TABLE 5.303.2.3. (5.303.2.1)21. AN STC OF 40 IS REQUIRED FOR WALL AND CEILING ASSEMBLIES SEPARATINGTENANT SPACES AND PUBLIC SPACES. CGBC 5.507.4.222. AUTOMATIC LANDSCAPE IRRIGATORS SHALL BE INSTALLED IN SUCH A WAYTHAT IT DOESN'T SPRAY ON THE BUILDING (5.407.2.1)23. ALL OPERATIONAL ASPECTS OF THE BUILDING SHALL BE DOCUMENTED WITHINA SYSTEM MANUAL. THIS SYSTEMS MANUAL SHALL BE DELIVERED TO THE OWNEROR REPRESENTATIVE AND FACILITIES OPERATOR (5.410.2.5.1)24. THE TRAINING OF THE APPROPRIATE MAINTENANCE STAFF FOR EACHEQUIPMENT TYPE AND/OR SYSTEM SHALL BE DOCUMENTED IN THECOMMISSIONING REPORT. (5.410.2.5.2)25. A COMPLETE COMMISSIONING REPORT SHALL BE PROVIDED TO THE OWNEROR REPRESENTATIVE. (5.410.2.6)26. FINAL COMMISSIONING REPORT SHALL BE READILY AVAILABLE TO THE FIELDINSPECTOR PRIOR TO FINAL APPROVAL (5.410.2.6)27. REDUCE CONSTRUCTION WASTE BY RECYCLING OR SALVAGING FOR RE-USEAMINIMUM OF 50 PERCENT OF THE NON-HAZARDOUS CONSTRUCTION ANDDEMOLITION WASTE MANAGEMENT ORDINANCE, WHICHEVER IS MORE STRINGENT.CGBC 5.408.3.28. 100 % OF ALL TREES, STUMPS, ROCKS ANDASSOCIATED VEGETATION AND SOILS RESULTING PRIMARILY FROM LANDCLEARING SHALL BE RE-USED OR RE-CYCLED. CGBC 5.408.429. AEROSOL ADHESIVES, SMALLER UNIT SIZES OF ADHESIVES, AND SEALANT ORCAULKING COMPOUNDS (IN UNITS OF PRODUCT, LESS PACKING, WHICH DO NOTWEIGH MORE THAN 1 POUND AND DO NOT CONSIST OF MORE THAN 16 FLUIDOUNCES) SHALL COMPLY WITH STATEWIDE VOC STANDARDS AND OTHERREQUIREMENTS, INCLUDING PROHIBITIONSON THE USE OF CERTAIN TOXICCOMPOUNDS, OF CCR, TITLE 17, COMMENCING WITH SECTION 94507. CGBC5.504.4.1, SUBSECTION 2.30. FOR RESILIENT FLOORING AT LEAST AT LEAST 50 % OF THE FLOOR AREA SHALLCOMPLY WITH VOC EMISSION LIMITS DEFINED IN 2009 COLLABORATIVE FOR HIGHPERFORMANCE SCHOOLS (CHPS) LOW EMITTING MATERIAL LIST OR UNDER THERESILIENT FLOOR COVERING INSTITUTE (RFCI) FLOOR SCORE PROGRAM. CGBC5.504.4.620. BUILDINGS ON SITE WITH 1,000 SF OR MORE OF CUMULATIVE LANSCAPE AREASHALL HAVE AUTOMATIC IRRIGATION CONTROLLERS. PROVIDE MANUFACTURER'SSPECIFICATIONS SHOWING THAT THESE CONTROLLERS ARE EITHER WEATHER ORSOIL MOISTURE BASED. (5.304.3)SECTION 5.106 - SITE DEVELOPMENT5.106.1.2 - BEST MANAGEMENT PRACTICES (BMP).PREVENT THE LOSS OF SOIL THROUGH WIND OR WATER EROSION BYIMPLEMENTING AN EFFECTIVE COMBINATION OF EROSION AND SEDIMENTCONTROL AND GOOD HOUSEKEEPING BMP.1.SOIL LOSS BMP THAT SHOULD BE CONSIDERED FOR IMPLEMENTATION ASAPPROPRIATE FOR EACH PROJECT INCLUDE, BUT ARE NOT LIMITED TO, THEFOLLOWING:A. SCHEDULING CONSTRUCTION ACTIVITY.B. PRESERVATION OF NATURAL FEATURES, VEGETATION AND SOIL.C. DRAINAGE SWALES OR LINED DITCHES TO CONTROL STORMWATER FLOW.D. MULCHING OR HYDROSEEDING TO STABILIZE DISTURBED SOILS.E. EROSION CONTROL TO PROTECT SLOPES.F. PROTECTION OF STORM DRAIN INLETS (GRAVEL BAGS OR CATCH BASININSERTS.)G. PERIMETER SEDIMENT CONTROL (PERIMETER SILT FENCE, FIBER ROLLS).H. SEDIMENT TRAP OR SEDIMENT BASIN TO RETAIN SEDIMENT ON SITE.I. STABILIZED CONSTRUCTION EXITS.J. WIND EROSION CONTROL.K. OTHER SOIL LOSS BMP ACCEPTABLE TO THE ENFORCING AGENCY.2.GOOD HOUSEKEEPING BMP TO MANAGE CONSTRUCTION EQUIPMENT,MATERIALS AND WASTES THAT SHOULD BE CONSIDERED FORIMPLEMENTATION AS APPROPRIATE FOR EACH PROJECT INCLUDE, BUT ARENOT LIMITED TO, THE FOLLOWING:A. MATERIAL HANDLING AND WASTE MANAGEMENT.B. BUILDING MATERIALS STOCKPILE MANAGEMENT.C. MANAGEMENT OF WASHOUT AREAS (CONCRETE, PAINTS, STUCCO, ETC.).D. CONTROL OF VEHICLE/EQUIPMENT FUELING TO CONTRACTOR'S STAGINGAREA.E. VEHICLE AND EQUIPMENT CLEANING PERFORMED OFF SITE.F. SPILL PREVENTION AND CONTROL.G. OTHER HOUSEKEEPING BMP ACCEPTABLE TO THE ENFORCING AGENCY.DCONSTRUCTION WASTE MANAGEMENT PLANSCALENONET3.0TYPICALCAL GREENNOTES----Filename:Sheet Title:Date:Scale:Project No.: Drawn By:Reviewed By:No.MCG ARCHITECTS 2018 ALL RIGHTS RESERVEDCSheet #:09-18-18Description18.452DateRevisions:Client:A Project for:Seal:TEAM600 CITADEL DRIVE,COMMERCE, CA 90040Tel. (323) 869 7500Fax (323) 869 7856TENANT IMPROVEMENT
<br />STOCKTON, CA 95207
<br />SMART & FINAL #393
<br />744 WEST HAMMER LANE
<br />AS NOTED10.22.181ST SUBMITTAL
|