TOWER VENTILATION (364sf) PROVIDE TILE ROOFING ON TOWER VENTILATION (171sf)
<br /> REQUIRED: 364 / 150 = 2.43sfICE AND WATER SHIELD REQUIRED: 171 / 150 = 1.14sf
<br /> PROVIDED: (4) 14"x22" = 8.56sf UNDERLAYMENT ON TOWER PROVIDED: (1) 14"x24" = 2.33sf
<br /> 50% FREE AREA LOUVER ROOF 50% FREE AREA LOUVER:
<br /> 8.56sf x 50% = 4.28sf 2.33sf x 50% = 1.17sf
<br /> Architecture / Development
<br /> 22'_0" PROVIDE PLYWOOD 16'-0"
<br /> SHEATHING FLOORING
<br /> 1'-0" 20'-0°' 1'-0' FINISH IN TOWER AREA 1'-0" 14'-0" 1'-0' LINE OF AWNING BELOW. SEE 14901 Quorum Drive
<br /> DETAILS #5 & #6 ON SHEET A16.0 Suite 300
<br /> 12
<br /> Dallas Texas 75254
<br /> ,q
<br /> ILLUMINATED ROOF DRAIN & OVERFLOW, Al2 Ph: (972)239-8884
<br /> A10.0 BUILDING SIGN
<br /> 4 SEE DETAIL 10/A17.1, SIM Fax: (972)239-5054
<br /> A17.1 L.E.D.
<br /> 1 - - LIGHTING
<br /> - - - - � - - - - - - - - - - - - - - - - DATE DESCRIPTION
<br /> Cr I I =_
<br /> URBAN PROTOTYPE DESIGN
<br /> I - - - - - - - - - - -
<br /> I S Q O � I F r�� I 10-22-2018 ISSUED FOR PERMIT
<br /> MJLR❑❑ �o F O° 0° ��° I I w O s� (!) 0° - s�'°❑° I L I
<br /> ❑❑❑ GYP CEILING, !' O� ❑ o ❑ A� I L - J
<br /> ❑�
<br /> 1 cn ❑ 7,_0,> 5,_5„ » 2,-1„
<br /> I
<br /> 1
<br /> LU
<br /> VIII 0
<br /> O �� -
<br /> (no ��� fir ' I I ❑-❑❑❑ ��Q ❑❑❑❑❑ - FCOMPRESSORS (84)
<br /> �Q SEE NOTE I I I ❑�❑ I 2 ®❑® 01 CI I PLATFORM. SEE
<br /> 18x8x48 GUTTER BOX Ili
<br /> " ( ) ACCESS I 1
<br /> B I I I (MOUNTED AT FLOOR
<br /> J TYP I A17.1 I DETAIL 07/A16.1. 1 o
<br /> s o I� I B
<br /> IT - - - - - - - - -ter PaaE g I- - - - L - - - I - - - - - - - -
<br /> 2 - 2 �� T
<br /> 0 o V I I I SERVER/UPS A17.o A17.1 A17.o I I s a I I 1 o z
<br /> A10.0 ,�, c� I A10.0
<br /> RACK 2 I I A17.1 O ❑ I N = POWE R PENETRATIONS
<br /> M I TYP ( ❑
<br /> N o V I I I A17.1 1 1 1 1 ❑ I I I I I I i I REVISION RECORD
<br /> "' "' I I I I ❑❑❑❑❑ ❑❑❑❑❑ I ELECTRIC 1'-6" GA I U) ❑ I N
<br /> V I I I ❑�❑ ❑®❑� I 5 4� � - - - - - - -
<br /> I I
<br /> o I I I I I I 5' 1� I EFRIGERATION I A17.0
<br /> Ui I I I I 1 20 1 - 1 1 PENETRATION (TYP)-
<br /> A17.1I I
<br /> o I I I I I _ 1 1 [2]21g 11 1 \/ I ACJPLATFORM I I
<br /> V I I I I 18 a a 1 I /\ I 1 ', 11 II II 1
<br /> 0 U)
<br /> L_ t7c CD - - oo Noll E:]
<br /> ILS I - - -
<br /> hN ? o I 114'-0" 4'-1" Q o' I1 \\ » ,> 1'-6„ 8,_7$„ EF 1'-g" 1" 3,_0„
<br /> I` 4x24 OUVE I 7 1
<br /> � I I L - - -�I ELOW RAPET D.S. & GUTTER. SEE 1
<br /> 1 mCn
<br /> `D J I I - -0 I OND NSATE INE I _,� 8/A17.2. PROVIDE WALKWAY OPN G _ -
<br /> N 2x WOOD i PAD BELOW DOWNSPOUT I ROOF DRAIN, SEE 10/A17.1,
<br /> I I P TFORM _ _ _ _ 1A ETAL OOR @ 12 ABOVE II II I A17.2 N
<br /> r FC-1 (ABOVE) , I R OF D CK W 24"x24" FOR SPLASH BLOCK a' L _ J - I N WITH 3 STORM DRAIN DOWN
<br /> r
<br /> R TYP. 3 PLACES POWER PENETRATIONS CO oo z I I THRU COLUMN & CURB, DRAIN
<br /> - - - - - - -� - - - a ROOFING ON 1/2" DENSDECK v AT GUTTER.
<br /> IIS CONDENSATE (TYP) 5,-8$„ F o
<br /> ROOF BOARD ON PLYWOOD 1
<br /> � � AE 5 /\ 5'-1$' SHEATHING, SEE SPECS o N
<br /> i❑ � � I J
<br /> I ❑; ABOVE ROOF DECK I r I`"I i'I 1 L<
<br /> -
<br /> ABOVE
<br /> I W/ 24"x24" LOUVER a ' ' I /I EE-MA-CH INES [(2)� i / I ❑,❑11 I
<br /> Of
<br /> BELOW I F_ --I TYP. 3 PLACES I O I / I 22.1 COMPRESSORS 1 1 I C
<br /> 1 o I I CU ROOFING ON 1 2 DENSDECK o1' °° I I A10.1
<br /> 1 I I 1 ROOF BOARD 0 PLYWOOD J GA oQ �,
<br /> _ I I SHEATHING, SPE S 10 OVERFLOW DRAIN, SEE
<br /> PLATFORM REFRIGERAT ON o r 7 TAPERED I 1 O/A17.1, 3" PIPE TO
<br /> - LJ RIDGE LINE - ISI >
<br /> AC (NP) D PLYWOOD i DAYLIGHT 1 BELOW CEILING
<br /> PROFESSIONAL SEAL
<br /> ROOF HATCH WITH 1 I Lu ACCESS PRE,FAB WOOD TRUSSES @ I w ' 2 UP TS EF I (2) PAIR OF 14"x22" 14 ARC
<br /> SUPPORT RAIL. SEE I a PANEL Lu COMBUSTION AIR LOUVERS 4 1 � ,*
<br /> I O- 24 O.C. (TYP) REFER TO o- ACCESS 1 _6 I \ 2 75" ABOVE DECK. '� G
<br /> I
<br /> 15/A16.0 co 0 19 STRUCTURAL DWG 5'-6" LECTRI PANEL 19 OPN'G 1'_ "I I - - - TOTAL). TOP OF HIGH LOUVER AT F ,
<br /> A17.1 4A17.1 r---� I � I
<br /> I
<br /> WALKWAY PAD, INSTALL I P i _❑_ i - 01 I, \ PROVIDE NON-COMBUSTIBLE
<br /> IPE MFR'S _ _ _ - -
<br /> b RE OMMENDATIONS ( P) L -J - I I \ \ I MATERIAL WITHIN 18" OF a ❑ I 4r�
<br /> 1 I I 11'-10 " �E MACHINE (115A) -� I \\ O O I GREASE DUCT PENETRATION. O I �C0
<br /> EF N COMPRESSOR __ -_ \ \ 1 SEAL OPENING W/FIRE CAULK cJn o ,
<br /> 2 / \ \ MAKE-WATERTIGHT I -201g
<br /> 4'- 1 v/ A17.0 / / �'� "' Q� \ \ } I 1 GALV. METAL COPING OVER FELT 10-1 i
<br /> REFRIGERATION / / 5 -6g �° O \ \ I OVER 1/2" PLYWOOD (PROVIDE
<br /> - - - - - PENETRATION / / G' O� \\
<br /> 1 ❑ I / / » I °O BULK Co2 TANK WITH\ \ I I STANDING SEAM ® 10'-0" O.C.)
<br /> 1 I I CND NSATE I / 1 -6 I LEAK SENSOR (PROVIDE \ \
<br /> o G I ❑ I I N I METAL DOOR ® 12" ABOVE j OPN G PLATFORM. SEE DETAIL \ \ I I
<br /> o A10.1 I I � 1 I � �i '� i LOWER DECKW/
<br /> 3 PLACES) `.❑/ ♦ O�❑0�. 12/A17.2) COLUMN BELOW
<br /> `l I
<br /> 1 1 10' 84' I\ I I \ / 1 20 -4 2 -6 8 -0 - 11 ♦ O 1 1 i o 2 A17.1 � L J I
<br /> » PO E ING » L---J \ L -
<br /> ❑ I I \ 1 \/ �� ��� A17.1 �� \ I PROTOTYPE VERSION
<br /> N I I I \ 1 1 /\ 1 r - - � I R00 HATCH WI H HIP LINE / - - - - - - - - - - - - - - - - - URBAN DESIGN
<br /> / \ 1 AC ❑ SUPPORT RAIL. SEE /
<br /> ❑ I I \\I I / \ 3 o z I I 114/ 16.0 ALK-IN ,� ' \\ \ °Q� ♦ / x �/❑/ ,
<br /> PROJECT NAME
<br /> ♦ / v // '
<br /> - - - - J I L - I M o I I I I IREFRIG. I \ \\ G'n� / W R HEATERS WITH // �'/ ,O
<br /> TAPERED PLYWO D, TYP. �- -� /
<br /> - �ELEC RI GAS _ J 1(83) 1 \\ \ / \S S STRAP TO COMPLY O,o /// I N-N-O UT
<br /> H 1 �� - - �� - - 1COMPRESS.I \ \ / WIT A ICABLE CODES. ❑O�` / / / ,C
<br /> A10.1
<br /> PLATFORM \ \ SEE PLU MORE NF`9RG�ONE SEE
<br /> FOR /❑ 2�� /j//> BURGER
<br /> 11/A17.2 F\9R\W\TERHEATER PAN / J� \� �ROOF DRAIN(& VERFLOW, 1 I /// //// N. PROVIDE TILE ROOFING ON
<br /> I Q 1 SEE DETAIL 10/ 17.1, SIM °Q O �( \ 0 ICE AND WATER SHIELD
<br /> s PRES��Rf WASHER/ � LATH ROP
<br /> 1 ISI I I ❑c�` J . O ��\ �o'• \\\\ J/ \ j�2� N / UNDE\ ROOFRLAYMENT ON TOWER
<br /> 1 - ❑❑ 1 O - - - - - - - - - PROVIDE PLYWOOD CALIFORNIA
<br /> O o SHEATHING FLOORING
<br /> _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ I I _\ \ ❑; /��,/ �o'° O FINISH IN TOWER AREA 16514 GOLDEN VALLEY PKWY
<br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 - - - - - - - \� �� / /
<br /> TOWER VENTILATION (364sf) LATHROP, CA 95330
<br /> \ // REQUIRED: 364 / 150 = 2.43sf
<br /> A17.1 (2) PAIR OF 14"x22" I �I / �o'° PROVIDED: (4) 14"x22" = 8.56sf
<br /> L.E.D. LIGHTING F 12 COMBUSTION AIR LOUVERS (4 >> 50% FREE AREA LOUVER =
<br /> A 1 TOTAL). TOP OF HIGH LOUVER I 8.56sf x 50% = 4.28sf)
<br /> A10.1 A17.1 A10.0 1 AT 75" ABOVE DECK. BOT. OF
<br /> LOW LOUVER AT 14" ABOVE W.H.
<br /> PLATFORM 1
<br /> I 1
<br /> PRE-FAB WOOD TRUSSES @ I ,° NoNwOUT
<br /> 24" O.C. (TYP) REFER TO 1 ` ❑ ❑ ❑ ❑R❑ ❑❑ ❑ ❑1111 \BURGER
<br /> 1 STRUCTURAL DWGS
<br /> 1 1 A. ALL DUCTWORK EXHAUSTING MOISTURE LADEN AIR SHALL BE STAINLESS STEEL.
<br /> 1 I B. ALL DUCTWORK EXHAUSTING GREASE LADEN AIR SHALL BE WELDED BLACK STEEL GOD BLESS AMERICA
<br /> 111 ❑ I (INDOOR PORTION) OR WELDED GALVANIZED WITH WELD AREAS COLD GALVANIZED
<br /> I ROOFING ON 1/2" DENSDECK p 1 (OUTDOOR PORTION).
<br /> 1 ROOF BOARD ON PLYWOOD �o APERED 1 C. PROVIDE 5/8"PLYWOOD PLATFORM BELOW ROOF ACCESS PANELS WITH WOOD
<br /> SHEATHING, SEE SPECS I PLYWOOD I BLOCKING SPANNING BETWEEN BOTTOM CHORD OF TRUSSES. PLATFORM To BE 8'
<br /> GALV. METAL COPING OVER FELT LONG, CENTERED ON ACCESS OPENING, AND EXTEND IN THE DIRECTION OF THE
<br /> I OVER 1/2" PLYWOOD (PROVIDE TRUSSES. PROVIDE AN ADDITIONAL 8' LONG PLATFORM AT EACH TRUSS BAY TO THE PROJECT NUMBER
<br /> 1 I STANDING SEAM ® 10'-0" O.C.) LEFT & RIGHT OF THE ACCESS OPENING. COORDINATE INSTALLATION OF PLATFORMS
<br /> 1 - S� I 1 To AVOID LIGHT FIXTURES, DIFFUSERS, DUCTWORK, ETC. 180641.001
<br /> 1 ❑��❑ I L J D. REFER TO DETAIL 13/A17.2 FOR PARAPET FLASHING TERMINATION AT TOWERS.
<br /> C R I-I n I-I❑❑I-II-I I- 1 I L- - J I COLUMN BELOW E. PAINT LOUVERS IN TOWERS AND TOWER DOORS TO MATCH ADJACENT SURFACE. SHEET TITLE
<br /> - - - - F. GALVANIZED CAPS AT ROOF TOP EQUIPMENT PLATFORMS ARE To HAVE FULLY
<br /> ❑❑� ❑❑❑❑❑❑ ❑❑11'��❑I�' - t
<br /> - - - - - - - - - - + - - - - - WELDED JOINTS. NO SCREWS OR FASTENERS ARE To PENETRATE THROUGH THE TOP ROOF PLAN
<br /> SURFACE.
<br /> E NORTH G. METAL STRAPS FOR WALK-IN COOLER COMPRESSOR AND "CU-1" ARE To BE
<br /> 1 ATTACHED TO THE SIDES OF THE ROOF CURB AND NOT THE TOP.
<br /> LO
<br /> ROOF DRAIN, SEE 1 O/A17.1, WITH E A17.0 H. PAINT ALL PENETRATIONS AT ROOF TILES TO MATCH TILE.
<br /> 3" STORM A10.1 I. ATTACH ICE MACHINE COMPRESSORS To RACK USING 3/8" TEK SCREWS OR BETTER.
<br /> COLUMN &DCURB,RAIN DDRAINOWN TARUGUTTER. ATTACH ICE MACHINE DISCONNECT TO RACK USING BOLTS (NO SCREWS).
<br /> C14J. REFER TO DETAIL 17/A17.1 FOR VENT PIPING DETAIL AT TILE ROOFS.
<br /> K. BUILDING TYPE IS TYPE 5V. ROOF COVERING IS A POLYVINYL-CHLORIDE ADHERED SHEET NUMBER
<br /> OVERFLOW DRAIN, SEE 10/A17.1, MEMBRANE ROOFING SYSTEM BY JOHNS MANVILLE (SEE SPEC ON A1.E) WHICH
<br /> Q o 3" PIPE TO DAYLIGHT 1" BELOW CEILING
<br /> CARRIES A CLASS A RATING.
<br /> mA6mO
<br /> 00
<br /> ZZ
<br /> C= C=
<br /> CL. �
<br />
|