My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GOLDEN VALLEY
>
16514
>
1600 - Food Program
>
PR0544910
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 11:15:33 AM
Creation date
8/12/2020 8:15:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0544910
PE
1625
FACILITY_ID
FA0025530
FACILITY_NAME
IN-N-OUT BURGER #346
STREET_NUMBER
16514
STREET_NAME
GOLDEN VALLEY
STREET_TYPE
PKWY
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16514 GOLDEN VALLEY PKWY
P_LOCATION
07
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
750
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1830A215-Mar2008 1930A215-Mar2008 <br /> A. CLEANING: New units are wiped clean at the factory to remove any visible signs of dirt, oil, grease, etc., remaining from the <br /> manufacturing process. Each fryer vessel should be thoroughly washed with hot soapy water to remove film residues, <br /> installation dust, or debris; and then wiped dry before being used for food preparation. <br /> B. STARTUP: The fryers are tested, adjusted and calibrated prior to being shipped: however adjustments may be necessary on instal- <br /> lation to meet local conditions, high or low gas pressure, differences in altitudes, variations in gas characteristics, and to correct pos- <br /> sible problems caused by rough handling or vibration during shipment. Initial calibration or adjustment is the responsibility of the <br /> customer and will not be covered by the Ultrafryer Systems warranty. <br /> NOTE: Calibration and adjustments must be performed by qualified personnel. <br /> C. LIGHTING INSTRUCTIONS: Each fryer is equipped with a spark ignition system; to test this system, perform the following <br /> steps, in sequence: <br /> 1. Ensure the Ultrastat 25 Controller is off. <br /> 2. Fill the fryer vessel with hot or cold water to the SHORTENING LEVEL mark. <br /> CAUTION : IF THE MAIN BURNERS ARE OPERATED WITH THE VESSEL EMPTY, THE HEAT WILL CAUSE THE JOINTS <br /> OF THE FRYER VESSEL TO BE PLACED UNDER UNDUE STRESS AND MAY CAUSE THE HEAT EXCHANGER <br /> VESSEL TO WARP OR BUCKLE, VOIDING WARRANTY. <br /> 3. Turn the manual gas valve behind the fryer service access door of the fryer to the OFF position and wait FIVE (5) minutes for <br /> any accumulated gas to disperse. <br /> 4. ENSURE the MAIN gas shutoff is in the ON position, MANUAL VALVE on the combination GAS CONTROL VALVE <br /> (located behind the fryer service access door) is in the ON position, and the Vent Hood EXHAUST FAN is ON. <br /> 5. Turn the manual gas valve to the ON position. <br /> 6. Place the ULTRASTAT 25 Cooking Computer into the MELT MODE. <br />WARNING!!! DO NOT USE A MATCH OR CANDLE TO LIGHT A FRYER… EVER! <br />D. SEQUENCE OF IGNITION: When the lighting instruction steps are performed in the sequence listed above, the following will occur: <br /> 1. Blower will come ON, activating the air pressure switch. <br /> 2. The air pressure switch will CLOSE completing the electrical circuit to the transformer. <br /> 3. The transformer will supply 24 volts to the IGNITOR MODULE and GAS CONTROL VALVE, and the ignitor will SPARK <br /> lighting the gas in the burner. <br /> WARNING!!! WHEN CHECKING FOR BURNER PERFORMANCE, DO NOT STAND WITH YOUR FACE CLOSE TO THE <br /> BURNER…. IT MAY LIGHT WITH A “POP” AND COULD FLASH BACK AND CAUSE FACIAL BURNS. <br /> NOTES: 1) If the burner flame fails, it will be sensed by the SPARK IGNITOR; the Spark Ignitor Module will open the electrical <br /> circuit to the GAS CONTROL VALVE, shutting off gas to the burner. 2) If the blower fails, the air pressure switch will <br /> open the electrical circuit to the TRANSFORMER, removing electrical power from the SPARK IGNITOR MODULE and <br /> GAS CONTROL VALVE, shutting off gas to the burner. <br />E. BURNER OPERATION TEST: Perform above LIGHTING INSTRUCTIONS and observe operation of the burners. When satisfied <br /> that the burner is operating properly, drain the fryer vessel of water and dry the vessel thoroughly; then fill the fryer vessel with <br /> shortening according to the instruction, below. <br />F. SHORTENING INSTALLATION: <br /> 1. LIQUID SHORTENING: When using liquid shortening fill the fryer with cold shortening 1/2" (13mm) BELOW the “E” in the word <br /> LEVEL. When the shortening is heated, ensure it is even with the “E” in the word LEVEL. <br /> 2. SOLID SHORTENING: <br /> a) Cut a block of solid shortening into small pieces. <br /> b) Place small pieces of solid shortening EVENLY on top of the HEAT EXCHANGER TUBES or THOROUGHLY PACK these <br /> pieces of solid shortening between, below, and above the HEAT EXCHANGER TUBES. While packing solid shortening is <br /> messy and time-consuming, it is the fastest way to melt solid shortening.
The URL can be used to link to this page
Your browser does not support the video tag.