My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GOLDEN VALLEY
>
16514
>
1600 - Food Program
>
PR0544910
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 11:15:33 AM
Creation date
8/12/2020 8:15:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0544910
PE
1625
FACILITY_ID
FA0025530
FACILITY_NAME
IN-N-OUT BURGER #346
STREET_NUMBER
16514
STREET_NAME
GOLDEN VALLEY
STREET_TYPE
PKWY
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16514 GOLDEN VALLEY PKWY
P_LOCATION
07
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
750
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br />SELECTING THE CORRECT PUMP TUBING <br />There are two pump tube sizes available for use with this dispenser. To determine the correct tubing for your <br />application, first determine the dispenser flow rate you intend to use, refer to Setting Dispenser Flow Rate. Then <br />look up the recommended tube size for the mix ratio of your concentrate, refer to the Tube Selection Chart. <br />Examples: <br />1. For a Dispenser Flow Rate of 2.5 Oz./sec (74 mL/sec) and a Mix Ratio of 35:1 – use 3/16” I.D. Tubing. <br />2. For a Dispenser Flow Rate of 1.8 Oz./sec (53 mL/sec) and a Mix Ratio of 60:1 – use 1/8” I.D. Tubing. <br />Tube kits can be purchased from BUNN-O-MATIC. <br />Part # 34727.1000 for 3/16” I.D. Tubing or #34728.1000 for 1/8” I.D. Tubing. <br />INSTALLING THE PUMP TUBING (Refer to the Tubing Installation Instructions in side the cabinet door for <br />details.) <br />1. Loosen the thumbscrew securing the tubing retainer plate to the pump housing. Set it and the retainer plate <br />aside. <br />2. Depress the tension screw and remove it from the notch in the pump body, releasing the spring tension on <br />the pump band. <br />3. Apply lubricant (BUNN-O-MATIC part number M2531.0001) to the new pump tubing. <br />4. Insert the tubing onto the mix chamber port and wrap the tubing around the pump rotor, making sure that <br />the elbow and clamps end up on the bottom side of the pump body. <br />5. Close the compression band reinsert the tension screw into the notch in the pump housing. <br />6. Replace the tubing retainer plate and tighten the thumbscrew. <br />7. Reconnect bag connector to the product box. <br />8. Repeat steps 1 through 7 for the other pump. <br />9. Prime the pumps. Refer to Priming the Concentrate Lines section. <br />TUBE SELECTION CHART <br /> Dispense Concentrate Ratios <br /> Rate 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 <br /> 1.8 Oz/sec. 3/16” I.D. TUBING 1/8” I.D. TUBING <br /> (53 ml/sec.) <br /> 2.5 Oz/sec. 3/16” I.D. TUBING 1/8” I.D. TUBING <br /> (74 ml/sec.) <br />Remove Retaining Plate Release Spring Tension Remove Tubing Lubricate New Tube <br />Install New Tubing Completed Installation <br />Thumbscrew <br />Lubricate between arrows <br />2.0”2.0”Tension <br />Screw <br />Tube Clamp <br />Tension Screw <br />36026.1 010313 <br />RELEASED FOR PRODUCTION <br />DIR Num: 36026.0001 19, May 2015
The URL can be used to link to this page
Your browser does not support the video tag.