DIVISION 0 - BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT SECTION 00320 - GEOTECHNICAL DATA SECTION 01290 - PAYMENT PROCEDURES SECTION 01320 - CONSTRUCTION PROGRESS DOCUMENTATION
<br /> 00320 Geotechnical Data 1. SUBSURFACE INVESTIGATIONS 1. SCHEDULE OF VALUES 1. SUBMITTALS
<br /> A. Soil and subsurface investigations were conducted at the Site, the results of which are in a separate report. COORDINATION: Coordinate preparation of the Schedule of Values with preparation of Contractor's Construction Schedule. SUBMITTALS SCHEDULE: Submit three copies of schedule. Arrange the following information in a tabular format:
<br /> 00425 Schedule of Values Correlate line items in the Schedule of Values with other required administrative forms and schedules, including CONTRACTOR'S CONSTRUCTION SCHEDULE: Submit two printed copies of initial schedule, one a reproducible print and
<br /> 00600 Bonds & Certificates 2. INTERPRETATION Submittals Schedule and Application for Payment forms with Continuation Sheets. Submit the Schedule of Values to one a blue or black-line print, large enough to show entire schedule for entire construction period.
<br /> A. The report identified above is not part of the Contract Documents. Soil and subsurface investigations were Architect at earliest possible date but no later than seven days before the date scheduled for submittal of initial CONSTRUCTION PHOTOGRAPHS: Submit each photographic view within three days of taking photographs. Digital (jpeg) 4 Architecture / Development
<br /> 00700 General Conditions conducted for the purpose of design only. Subsurface investigation information is made available to the Contractor Applications for Payment. mega pixels minimum.
<br /> solely as a matter of convenience and general information. FORMAT AND CONTENT: Use the Specifications table of contents as a guide to establish line items for the Schedule of FIELD CONDITION REPORTS: Submit two copies at time of discovery of differing conditions. 14901 Quorum Drive
<br /> DIVISION 1 - GENERAL REQUIREMENTS B. The Owner and Architect disclaim all responsibility for the accuracy of information prepared by others to be Values. Provide at least one line item for each Specification Section. Arrange the Schedule of Values in tabular form Suite 300
<br /> 01050 Field Engineering completely representative of conditions and materials which may be encountered and as being adequate for the with separate columns to indicate the following for each item listed: 2. COORDINATION Dallas Texas 75254
<br /> purposes of construction. Related Specification Section or Division. Coordinate preparation and processing of schedules and reports with performance of construction activities and with
<br /> 01060 Regulatory Requirements C. The Owner and Architect further disclaim responsibility for interpretation b Contractor and others of soil and Description of the Work. Fa ((97 239-584
<br /> P Y P Y P scheduling and reporting of separate contractors. Coordinate Contractors Construction Schedule with the Schedule of Fax: (972)239-5054
<br /> 01290 Payment Procedures subsurface investigation information, such as in projecting soil-bearing values, rock profiles, presence and scope of Name of subcontractor. Values, list of subcontracts, Submittals Schedule, progress reports, payment requests, and other required schedules and
<br /> boulders and cobbles, soil stability and the presence, level and extent of underground water. Name of manufacturer or fabricator. reports. Secure time commitments for performing critical elements of the Work from parties involved. Coordinate each ISSUE RECORD
<br /> 01310 Project Management and Coordination P P g
<br /> D. Conditions found after execution of the Agreement to be materially different from those reported and which are not Name of supplier. construction activity in the network with other activities and schedule them in proper sequence.
<br /> 01320 Construction Progress Documentation customarily encountered in the geographic area shall be governed by provisions of the General Conditions and Change Orders (numbers) that affect value. DATE DESCRIPTION
<br /> 01500 Temporary Facilities and Controls Supplementary Conditions for unforeseen conditions. Dollar value. 3. SUBMITTALS SCHEDULE URBAN PROTOTYPE DESIGN
<br /> 01610 Product Delivery, Handling & Storage Percentage of the Contract Sum to nearest one-hundredth percent, adjusted to total 100 percent. PREPARATION: Submit a schedule of submittals, arranged in chronological order by dates required by construction 10-22-2018 ISSUED FOR PERMIT
<br /> 3. SOIL AND SUBSURFACE INVESTIGATIONS BY CONTRACTOR Schedule Updating: Update and resubmit the Schedule of Values before the next Applications for Payment when Change schedule. Include time required for review, resubmittal, ordering, manufacturing, fabrication, and delivery when
<br /> 01700 Execution Requirements g p 9 J Orders or Construction Change Directives result in a change in the Contract Sum. establishing dates.
<br /> q A. The Contractor is encouraged to review the report of subsurface investigation for the Project site and similar sites
<br /> 01731 Cutting and Patching in the area.
<br /> B. The Contractor is also encouraged to examine the site, make additional tests, borings and other exploratory 2. APPLICATIONS FOR PAYMENT
<br /> 01770 Closeout Procedures 4. CONTRACTORS CONSTRUCTION SCHEDULE (GENERAL)
<br /> operations as they deem appropriate, and make an independent determination as to the nature, character and Each Application for Payment shall be consistent with previous applications and payments as certified by Architect and TIME FRAME: Extend schedule from date established for [the Notice to Proceed] to date of [Final] Completion. Contract
<br /> extent of the materials and conditions to be found. paid for by Owner. Initial Application for Payment, Application for Payment at time of Substantial Completion, and final completion date shall not be changed by submission of a schedule that shows an early completion date, unless
<br /> DIVISION 2 - SITE CONSTRUCTION C. All additional tests, borings and other exploratory operations shall be performed with no change in the Contract Application for Payment involve additional requirements. specifically authorized by Change Order. Activities: Treat each story or separate area as a separate numbered activity
<br /> 02020 Erosion Control Sum. PAYMENT APPLICATION TIMES: The date for each progress payment is indicated in the Agreement between Owner and for each principal element of the Work.
<br /> D. Additional on site tests, borings and other exploratory operations may be performed prior to execution of the Contractor. The period of construction Work covered by each Application for Payment is the period indicated in the CONSTRAINTS: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule,
<br /> 02300 Earthwork Contract only if approved in writing, by the Owner. Make requests through the Architect. All such Work must name Agreement.
<br /> as additional) insured parties the Owner and other such entities as the Owner directs. g and show how the sequence of the Work is affected.
<br /> 02361 Termite Control y P PAYMENT APPLICATION FORMS: Use AIA Document G702 and AIA Document G703 Continuation Sheets as form for MILESTONES: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the
<br /> 02580 Pavement Markings E. Upon conclusion of additional on-site tests, borings and other exploratory operations, restore the site to its original Applications for Payment. Notice to Proceed, interim milestones indicated below, Substantial Completion, and Final Completion.
<br /> 02846 Site Signage
<br /> state, to the satisfaction of the Owner. APPLICATION PREPARATION: Complete every entry on form. Notarize and execute by a person authorized to sign legal
<br /> documents on behalf of Contractor. Architect will return incomplete applications without action. 5. CONTRACTOR'S CONSTRUCTION SCHEDULE CPM SCHEDULE REVISION RECORD
<br /> SECTION 00425 - SCHEDULE OF VALUES TRANSMITTAL: Submit 3 signed and notarized original copies of each Application for Payment to Architect by a method ( )
<br /> 1. FORM ensuring receipt within 24 hours. One co shall include waivers of lien and similar attachments if required. GENERAL: Prepare network diagrams using AON (activity-on-node) format.
<br /> DIVISION 3 - CONCRETE g P copy q PRELIMINARY NETWORK DIAGRAM: Submit diagram within 14 days of date established for the Notice of Award Outline
<br /> A. Prepare a Schedule of Values on American Institute of Architects (AIA) Document G703, (APPLICATION AND WAIVERS OF MECHANIC'S LIEN: With each Application for Payment, submit waivers of mechanic's lien from every entity g y [ ]'
<br /> 03300 Cast- In- Place Concrete CERTIFICATE FOR PAYMENT CONTINUATION SHEET, current edition, or other form as directed and acceptable to ' significant construction activities for the first 60 days of construction. Include skeleton diagram for the remainder of
<br /> Owner. ) P who is lawfully entitled to file a mechanics lien arising out of the Contract and related to the Work covered by the the Work and a cash requirement prediction based on indicated activities.
<br /> payment. INITIAL ISSUE OF SCHEDULE: Pre are initial network dia from a list of strai ht "earl start-total float" sort.
<br /> DIVISION 4 - MASONRY B. Submit final Schedule of Values within three working days of request by Owner or Architect, prior to execution of APPLICATION FOR PAYMENT AT SUBSTANTIAL COMPLETION: After issuing the Certificate of Substantial Completion, submit P g ram g y
<br /> the Agreement. Identify all values for Work, including Allowance and Unit Price values if applicable, according to an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete. Identify critical activities.
<br /> 04820 Reinforced Unit Masonry Assemblies Contract Sum stated on Agreement. FINAL PAYMENT APPLICATION: Submit final Application for Payment with releases and supporting documentation not
<br /> C. Schedules of Value shall be subject to review and approval of Owner. Upon execution of Contract, approved previously submitted and accepted, including, but not limited, to the following: 6. REPORTS
<br /> DIVISION 5 - METALS Schedule of Values will become a part of the Contract Documents. Each Application for Payment shall include an Evidence of completion of Project closeout requirements. FIELD CONDITION REPORTS: Immediately on discovery of a difference between field conditions and the Contract
<br /> updated Schedule of Values and will be the basis upon which payments will be made. Insurance certificates for products and completed operations where required and proof that taxes, fees, and similar Documents, prepare a detailed report. Submit with a request for information. Include a detailed description of the
<br /> 05400 Cold Formed Metal Framing D. A copy of the Schedule of Values form AIA Document G703, (APPLICATION AND CERTIFICATE FOR PAYMENT) obligations were paid. differing conditions, together with recommendations for changing the Contract Documents.
<br /> 05500 Metal Fabrications CONTINUATION SHEET, may be obtained for a nominal charge from most local chapter offices of The American Updated final statement, accounting for final changes to the Contract Sum.
<br /> Institute of Architects. AIA Document G706, "Contractor's Affidavit of Payment of Debts and Claims." AIA Document G706A, "Contractor's 7. CONTRACTOR'S CONSTRUCTION SCHEDULE
<br /> DIVISION 6 - WOOD AND PLASTICS Affidavit of Release of Liens." AIA Document G707, "Consent of Surety to Final Payment." Evidence that claims have CONTRACTOR'S CONSTRUCTION SCHEDULE UPDATING: At monthly intervals, update schedule to reflect actual construction
<br /> SECTION 00600 - BONDS AND CERTIFICATES progress and activities. Issue schedule one week before each regularly scheduled progress meeting. Revise schedule
<br /> g Carpentry 1. BONDS Final meter readings for utilities, a measured record of stored fuel, and similar data as of date of Substantial mmey after eachmeeting or other activity ere revisions have been recognized or maIssue up
<br /> 06100 Rough Car entr been settled.
<br /> immediately tin thtivit where hbnized de. Idated
<br /> 06111 Pre-Assembled Roof Panels A. A Performance Bond for the Contractor and a Labor and Material Payment Bond are required. Bonds shall beCompletion or when Owner took possession of and assumed responsibility for corresponding elements of the Work. schedule concurrently with the report of each such meeting. Include a report with updated schedule that indicates
<br /> 06176 Wood Trusses prepared and submitted in the form of The American Institute of Architects Document A312, PERFORMANCE BOND every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity
<br /> AND LABOR AND MATERIAL PAYMENT BOND, latest Edition. Another form, covering substantially the some information, SECTION 01310 - PROJECT MANAGEMENT AND COORDINATION durations. As the Work progresses, indicate Actual Completion percentage for each activity.
<br /> 06200 Finish Carpentry may be used, if mutually acceptable to the Owner and Contractor. 1. COORDINATION DISTRIBUTION: Distribute copies of approved schedule to Architect, Owner, separate contractors, testing and inspecting
<br /> B. Bonds shall be in the following amounts: COORDINATION: Coordinate construction operations included in different Sections of the Specifications to ensure efficient agencies, and other parties identified by Contractor with a need-to-know schedule responsibility.
<br /> 1. Performance Bond 100% of the Contract Sum. and order) installation of each art of the Work. Coordinate construction operations, included in different Sections,
<br /> DIVISION 7 - THERMAL AND MOISTURE PROTECTION Y P P
<br /> 2. Labor and Material Payment Bond 100% of the Contract Sum. 8. CONSTRUCTION PHOTOGRAPHS
<br /> that depend on each other for proper installation, connection, and operation.
<br /> 07131 Sheet Waterproofing Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other PERIODIC CONSTRUCTION PHOTOGRAPHS: Take four color photographs monthly, coinciding with cutoff date associated
<br /> 07210 BuildingInsulation 2. CERTIFICATES OF INSURANCE with each Application for Payment. Photographer shall select vantage points to best show status of construction and
<br /> nsuconstruction activities and activities of other contractors to avoid conflicts
<br /> A. Minimum insurance requirements are stated in the General Conditions. cts and to ensure orderly progress of the Work. progress since last photographs were taken.
<br /> 07541 Polyvinyl-Chloride Roofing (PVC) Such administrative activities include, but are not limited to, the following: PROFESSIONAL SEAL
<br /> 07620 Sheet Metal Flashing and Trim 3. Nothing contained in these insurance requirements shall be construed as limiting the extent of the Contractor's 2. SUBMITTALS SECTION 01500 - TEMPORARY FACILITIES AND CONTROLS
<br /> 07720 Roof Accessories responsibility for payment of damages resulting from his operation under this Contract. COORDINATION DRAWINGS: Prepare Coordination Drawings if limited space availability necessitates maximum utilization of 1. USE CHARGES AR
<br /> A. All policies shall name and be for the mutual and joint benefit and protection of Owner and Contractor. Executed A. GENERAL: Cost or use charges for temporary facilities are not chargeable to Owner or Architect and shall be ,+
<br /> 07920 Joint Sealants P J P available space for efficient installation of different components or if coordination is required for installation of �
<br /> copies of the policies of insurance or certificates thereof shall be delivered to the Owner prior to the included in the Contract Sum. Allow other entities to use temporary services and facilities without cost, including, r F <^,
<br /> P P P products and materials fabricated by separate entities. C
<br /> commencement of any construction. All policies of insurance or certificates thereof must contain a provision that Key Personnel Names: Within 15 days of starting construction operations, submit a list of key personnel assignments, but not limited to, Owner's construction forces occupants of Project Architect testing and inspecting agencies and G -'
<br /> DIVISION 8 - DOORS AND WINDOWS the company will give the Owner ten (10) days notice, in writing, in advance of any cancellation or lapse or the including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and personnel of authorities having jurisdiction.
<br /> 08110 Steel Doors And Frames
<br /> effective date of any reduction in the amounts of insurance. responsibilities; list addresses and telephone numbers, including home, office and cell phone telephone numbers.
<br /> B. Cause to have an endorsement contained in the insurance naming the Owner, Architect and Architect' 2. SUBMITTALS s consultants Provide names, addresses, and telephone numbers of individuals assigned as standbys in the absence of individuals kP
<br /> 08210 Flush Wood Doors as an additional insured. assigned to Project. A. TEMPORARY UTILITY REPORTS: Submit reports of tests, inspections, meter readings, and similar procedures performed
<br /> 08311 Access Doors And Frames C. Insurance shall be written with a company having at a minimum an "A" First Division of Ratings and an "AAA" on temporary utilities. ,
<br /> 08520 Aluminum Windows Second Division of Ratings, as listed in the Best Insurance Guide, latest edition. 3. PROJECT MEETINGS 3. QUALITY ASSURANCE -201g
<br /> 08710 Door Hardware D. Submit a fully completed and properly executed AIA Document G705 - CERTIFICATE OF INSURANCE, latest Edition or GENERAL: Schedule and conduct meetings and conferences at Project site, unless otherwise requested by the Owner. 10-1
<br /> other form covering substantially the same information. A copy of AIA Document may be obtained, upon request, ATTENDEES: Inform participants and others involved, and individuals whose presence is required, of date and time of A. STANDARDS: Comply with ANSI A10.6, NECA s Temporary Electrical Facilities, and NFPA 241.
<br /> 08800 Glazing from The American Institute of Architects. each meeting. Notify Owner and Architect of scheduled meeting dates and times at least 2 business days in advance
<br /> E. Submit copies of policies, in addition to Certificate of Insurance, when requested. of the meeting. Minutes: Record significant discussions and agreements achieved. Distribute the meeting minutes to 4. PROJECT CONDITIONS
<br /> DIVISION 9 - FINISHES everyone concerned, including Owner and Architect, within three days of the meeting. Minutes shall reflect those actions A. TEMPORARY UTILITIES: At earliest feasible time, when acceptable to Owner, change over from use of temporary
<br /> SECTION 00700 - GENERAL CONDITIONS OF THE CONTRACT that need to be completed and the responsible for completing it. service to use of permanent service. Temporary Use of Permanent Facilities: Installer of each permanent service
<br /> 09220 Portland Cement Plaster (Stucco) 1. GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION, is AIA Form A201, General Conditions of the Contract PRECONSTRUCTION CONFERENCE: Schedule a preconstruction conference before starting construction, at a time shall assume responsibility for operation, maintenance, and protection of each permanent service during its use as
<br /> 09260 Gypsum Board Assemblies latest edition. convenient to Owner, and Architect, but no later than 15 days after execution of the Agreement. Hold the conference a construction facility before Owner's acceptance, regardless of previously assigned responsibilities.
<br /> 09310 Ceramic Tile at Project site or another convenient location. Conduct the meeting to review responsibilities and personnel
<br /> 2. The General Conditions of the Contract for Construction is referenced in the Project Manual as the "Conditions of the assignments. 5. EQUIPMENT
<br /> 09512 Acoustical Ceilings Contract." PREINSTALLATION CONFERENCES: Conduct a preinstallation conference at Project site before each construction activity A. FIELD OFFICES: Prefabricated, mobile units, or job built construction with lockable entrances, operable windows, and PROTOTYPE VERSION
<br /> 09900 Painting that requires coordination with other construction, where specified. serviceable finishes; heated and air conditioned; on foundations adequate for normal loading. URBAN DESIGN
<br /> 3. A copy of the General Conditions may be obtained a the local office of the American Institute of Architects. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and B. FIRE EXTINGUISHERS: Hand carried, portable, UL rated. Provide class and extinguishing agent as indicated or a
<br /> its coordination or integration with other materials and installations that have preceded or will follow, shall attend the combination of extinguishers of NFPA recommended classes for exposures. Comply with NFPA 10 and NFPA 241 for
<br /> DIVISION 10 - SPECIALTIES SECTION 01050 - FIELD ENGINEERING meeting. Advise Architect of scheduled meeting dates, at least two business days in advance of meeting. classification, extinguishing agent, and size required by location and class of fire exposure. PROJECT NAME
<br /> 10155 Toilet Compartments 1. QUALIFICATIONS OF ENGINEER OR SURVEYOR Agenda: C. SELF CONTAINED TOILET UNITS: Single occupant units of chemical, aerated recirculation, or combustion type; vented;
<br /> Registered Civil Engineer qualified to perform land surveying or licensed Land Surveyor acceptable to Contractor and PROGRESS MEETINGS: Conduct progress meetings at weekly intervals. Coordinate dates of meetings with preparation of fully enclosed with a glass fiber reinforced polyester shell or similar nonabsorbent material. I N-N-0 UT
<br /> 10800 Toilet Accessories Owner. Contractor shall furnish to the Owner prior to start of work the name and license or registration number payment requests. B. DRINKING WATER FIXTURES: Drinking water fountains Containerized, tap dispenser, bottled water, drinking water units,
<br /> issued by the State where Work is being constructed Contractor shall provide notice to the Owner during the course of Attendees: In addition to representatives of Owner, and Architect, each contractor, subcontractor, supplier, and other including paper cup supply.
<br /> DIVISION 11 - for this work change responsible construction should the identification of the individual EQUIPMENT res entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be C. Where power is accessible, provide electric water coolers to maintain dispensed water temperature at 45 to 55 deg BURGER
<br /> Q P ge from time to time, and shall represented at these meetings. All participants at the conference shall be familiar with Project and authorized to F. Liquid propane gas or fuel oil heaters are commonly used. Steam or hot water heaters, gas fired space heaters,
<br /> 11090 Knox Box obtain approval of the Owner for the replacement. All field engineering services furnished during the course of this
<br /> project shall be under the direct supervision and control of the named individual Civil Engineer or Land Surveyor. conclude matters relating to the Work. or electric unit heaters are also used.
<br /> Distribute minutes of the meeting to each party present and to parties who should have been present within three D. HEATING EQUIPMENT: Unless Owner authorizes use of permanent heating system, provide vented, self-contained,
<br /> DIVISION 12 - FURNISHINGS 2. FIELD ENGINEERING REQUIREMENTS days of the meeting. liquid propane gas or fuel oil heaters with individual space thermostatic control. `ATH ROP
<br /> Survey reference points: E. ELECTRICAL OUTLETS: Properly configured, NEMA polarized outlets to prevent insertion of 110-V to 120-V plugs into
<br /> Not Used 4. REQUESTS FOR INTERPRETATION (RFIs) higher voltage outlets; equipped with ground fault circuit interrupters, reset button, and pilot light.
<br /> A. Existing basic horizontal and vertical control points for the project are those designated er the drawings. F. POWER DISTRIBUTION SYSTEM CIRCUITS: Where permitted and overhead and exposed for surveillance, wiring circuits, CALIFORNIA
<br /> B. Locate and protect control points prior to starting site work, and preserve permanent reference points during PROCEDURE: Immediately on discovery of the need for interpretation of the Contract Documents, and if not possible to P P 9
<br /> DIVISION 13 - SPECIAL CONSTRUCTION construction. Identify and protect survey monuments on the site discovered during construction, which are not request interpretation at Project meeting, prepare and submit an RFI as prepared in the format acceptable to the not exceeding 125-V AC, 20-A rating, and lighting circuits may be nonmetallic sheathed cable.
<br /> Not Used referenced on the project drawings. Tie out such monuments and notify Architect prior to allowing them to be Owner and Architect. RFIs shall originate with Contractor. RFIs submitted by entities other than Contractor will be
<br /> disturbed. returned with no response. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's 6. INSTALLATION (GENERAL) 16514 GOLDEN VALLEY PKWY
<br /> C. Replace any permanent boundary markers disturbed during construction with new permanent monuments and file the work or work of subcontractors. A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of
<br /> DIVISION 14 - CONVEYING SYSTEMS required Record of Survey or Corner Record in accordance with applicable State and County laws, at no additional ARCHITECT'S ACTION: Architect will review each RFI, determine action required, and return it. Allow five working days for the Work. Relocate and modify facilities as required. LATHROP, CA 95330
<br /> Not Used cost to the Owner. Architect's response for each RFI. RFIs received after 1:00 p.m. will be considered as received the following working 7. TEMPORARY UTILITY INSTALLATION
<br /> 3. PROJECT SURVEY REQUIREMENTS day. A. GENERAL: Engage appropriate
<br /> local utility company to install temporary service or connect to existing service. WhereThe following RFIs will be returned without action:
<br /> utility company provides only part of the service, provide the remainder with matching, compatible materials and
<br /> DIVISION 15 - MECHANICAL Establish a minimum of two permanent horizontal and vertical control points on the site, remote from the building Requests for approval of submittals.
<br /> see Mechanical sheets area referenced to data established by the survey control points. Requests for approval of substitutions. equipment. Comply with utility company recommendations.
<br /> Requests for coordination information already indicated in the Contract Documents. B. SEWERS AND DRAINAGE: If sewers are available, provide temporary connections to remove effluent that can be
<br /> 4. RECORDS Requests for adjustments in the Contract Time or the Contract Sum. discharged lawfully. If sewers are not available or cannot be used, provide drainage ditches, dry wells, stabilization
<br /> DIVISION 16 - ELECTRICAL Maintain a complete, accurate log of control and survey work as it progresses. Submit certification of subgrade Incomplete RFIs or RFIs with numerous errors. ponds, and similar facilities. If neither sewers nor drainage facilities can be lawfully used for discharge of effluent,
<br /> Ilan"
<br /> completion on the main building showing the actual elevation of the completed constructed sub rade, to the nearest provide containers to remove and dispose of effluent off-site in a lawful manner.
<br /> see Electrical sheets p g g p g Architects action may include a request for additional information, in which case Architects time for response will C. WATER SERVICE: Install water service and distribution piping in sizes and pressures adequate for construction until NmNmOUT
<br /> 0.01 foot. ' p p g p q
<br /> start again. Architects action on RFIs that may result in a change to the Contract Time or the Contract Sum may be permanent water service is in use. Sterilize temporary water piping before use.
<br /> eligible for Contractor to submit Change Proposal according to Division 1 Section "Contract Modification Procedures." D. SANITARY FACILITIES: Provide temporary toilets, wash facilities, and drinking water fixtures. Comply with regulations \BURGERo
<br /> 5. SUBMITTALS P O' g P y g
<br /> type,Submit name and address of Licensed Surveyor or Civil Engineer to Architect, including changes as they may occur
<br /> If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, the contractor will and health codes fort a number, location, operation, and maintenance of fixtures and facilities.
<br /> submit a change order request to the owner. E. HEATING AND COOLING: Provide temporary heating and cooling required b construction activities for curing or drying GOD BLESS AMERICA
<br /> from time to time. P y g g q y g ry g
<br /> Submit documentation to verify accuracy of the field engineering work. of completed installations or for protecting installed construction from adverse effects of low temperatures or high
<br /> As built Drawings: humidity. Select equipment from that specified that will not have a harmful effect on completed installations or
<br /> A. At the project completion, deliver to Architect, final "as built" drawings of the work. Clearly indicate differences elements being installed. Maintain a minimum temperature of 50 deg F in permanently enclosed portions of building
<br /> between original drawings and completed work within specified tolerances. for normal construction activities, and 65 deg F for finishing activities and areas where finished Work has been
<br /> B. Show as built locations by coordinates of utilities onsite with top of pipe elevations at major grade and alignment installed.
<br /> changes. F. VENTILATION AND HUMIDITY CONTROL: Provide temporary ventilation required by construction activities for curing or
<br /> C. Completed as built drawings shall be signed and certified as correct by the Licensed Surveyor or Civil Engineer. drying of completed installations or for protecting installed construction from adverse effects of high humidity. PROJECT NUMBER
<br /> Select equipment from that specified that will not have a harmful effect on completed installations or elements 180641.001
<br /> SECTION 01060 - REGULATORY REQUIREMENTS being installed. Coordinate ventilation requirements to produce ambient condition required and minimize energy
<br /> 1. AUTHORITY AND PRECEDENCE OF CODES, ORDINANCES AND STANDARDS consumption.
<br /> G. ELECTRIC POWER SERVICE: Provide weatherproof, grounded electric power service and distribution system of sufficient SHEET TITLE
<br /> Authority: All codes, ordinances and standards referenced fi cations.the Drawings and Specifications shall have the full force size, capacity, and power characteristics during construction period. Include meters, transformers, overload protected
<br /> and effect as though printed in their entirety in the Specifidisconnecting means, automatic ground fault interrupters, and main distribution switchgear. Install electric power SPECIFICATIONS
<br /> 2. APPLICABLE CODES, LAWS AND ORDINANCES service underground, unless overhead service must be used. Install power distribution wiring overhead and rise
<br /> E Performance of the Work shall be governed by all applicable laws, ordinances, rules and regulations of Federal, State vertically where least exposed to damage.
<br /> and local governmental agencies and jurisdictions having authority over the Project, including State and Federal H. LIGHTING: Provide temporary lighting with local switching that provides adequate illumination for construction
<br /> accessibility requirements. operations and traffic conditions.
<br /> I. TELEPHONE SERVICE: Provide temporary telephone service throughout construction period for common use facilities
<br /> APPLICABLE BUILDING CODES: References on the Drawings or in the Specifications to "code" or "building code" not used by all personnel engaged in construction activities. Install separate telephone line for each field office and
<br /> CD
<br /> otherwise identified shall mean the codes specified below, together with all additions, amendments, changes, and first aid station.
<br /> interpretations adopted by code authorities of the jurisdiction having authority over the Project. SHEET NUMBER
<br /> Q
<br /> NO SUBSTITUTIONS ALLOWED DATE OF CODES, LAWS AND ORDINANCES: The applicable edition of all codes shall be that adopted at the time of
<br /> m issuance of permits by the jurisdiction having authority and shall include all modifications and additions adopted by
<br /> 0 o UNLESS NOTED OTHERWISE. that jurisdiction. The applicable date of laws and ordinances shall be that of the date of performance of the Work. Al mB
<br /> zZ
<br />
|