Laserfiche WebLink
Della]\4onica <br /> (E) CAST CONCRETE <br /> - EXEPLUMBING FIXTURE SCHEDULE PLUMBING NOTES: WTOLPREVENTCISE SPAL LING S N Y D E R <br /> IWH-1 TAKAGI SINGLE P❑INT USE OUTDOOR INSTANTANE❑US HOT WATER HEATER, - <br /> ALL WORK SHALL CONFORM TO THE F❑LL❑WING CODES: 1-5/8" UNISTRUT <br /> T-D2-OS-N MODEL T-D2-OS-N, 10 GPM, 80°F RISE, 120V, 1A. 199 MBH INPUT, SET B-LINE VIBRACLAMP - BVT <br /> LEAVING WATER TEMP AT 1209F MAX. 2016 CBC SERIES CLAMP TO BE USED ON <br /> 3CS-1 WEST STAR 3 COMPARTMENT CORNER POT SINK, 16x18 SINK BASINS, 2-24 DRAIN REFER TO KITCHEN 2016 CPC ALL COPPER PIPE AND FITTINGS <br /> BOARDS, DRAWINGS FOR EXACT SIZE 2016 CMC <br /> 2016 CEC INSULATION W/ WHITE ASJ <br /> 3CS-1 WHERE REQUIRED - INSTALL <br /> GI-1 ZURN ABOVE GROUND GREASE INTERCEPT❑R, 20 GPM WITH 3" PLAIN END CONTRACTOR SHALL KEEP ALL INSTALLATION INSTRUCTI❑NS FOR PLUMBING FIXTURES, ALUMINUM JACKET WHERE EXPOSED TO <br /> GT2700-20 INLET AND OUTLET, SEALED AND GASKETED C❑VERACCESS DOORS, SEALING MATERIAL, FIRE STOPPING, ETC, ONSITE IN WATERPROOF THE WEATHER, PROVIDE LABELS FOR <br /> POUCHES FOR THE INSPECTING AUTHORITY FOR THEIR REVIEW, SERVICE AND FLOW DIRECTIO <br /> W/MIN 1" HIGH LETTERS <br /> PLUMBING CONTRACTOR SHALL SUBMIT 7 SETS OF SUBMITTALS FOR REVIEW AND <br /> COMMENT BY THE ENGINEER AND ARCHITECT OF RECORD FOR THE FIXTURES LISTED A r C h 1 t e C t S <br /> PLUMBING LEGEND <br /> AND APPR❑PRIATETHE LCHAANGESUASDDIRECTEDND TBYLED THHE❑N THIS ENG NEERR❑ANDCT AND SHALL ARCHIITECT AT MAKE <br /> 2"HV FLOW <br /> T ING 1/2" SS HILTI HVA EPDXY :. <br /> ADDITI❑NAL COST TO THE OWNER, ANCHORS - EMBED 3" MIN <br /> SYMBOL DESCRIPTION SYMBOL 7 <br /> DESCRIPTION - <br /> MATERIALSI GT-1 <br /> --- CW COLD WATER LINE BALL VALVE <= 4", GATE VALVE>4" T❑LPD ANDC❑PPER AAB❑VE GROUND AND TYPE 'K' BELOW, FURNISH SHUTOFF VALVES <br /> ---- HW HOT WATER LINE �0� BALANCING VALVE WHERE SHOWN, SHUT OFF VALVES SHALL BE BALL TYPE WITH TEFLON SEATS, 1-1/4"DRAINS FROM PPE SUPPORT - WALL ("­ I� <br /> STAINLESS STEEL BALL, AND DOUBLE ❑-RING STEM 1/4 TURN, VALVES TO BE EACH COMPARTMENT 3"HV DETAIL PO <br /> 11111111111 TD TRENCH DRAIN GAS COCK RATED FOR WOG SERVICE. PROVIDE DIELECTRIC UNI❑NS AT ALL DISSIMILAR METAL 3"GL <br /> C❑NNECTI❑NS. INSULATE HOT WATER SUPPLY AND RETURN LINES W/1" FIBERGLASS <br /> SS SANITARY SEWER AC ABOVE CEILING ASJ MEETING THE REQUIREMENTS OF T-24 MANDATORY FEATURES, <br /> GL GREASE LINE BFF BELOW FINISHED FLOOR SCH 40 CPVC BELOW GRADE OUTSIDE, SIZE AS INDICATED ON THE DRAWINGS, <br /> — HV HORIZONTAL VENT AFF ABOVE FINISHED FLOOR CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES, CONTRACTOR 3CS - 1 ) SS CONNECTION 4 <br /> SHALL DISINFECT WATER LINES PER AWA GUIDELINES AND PR❑VIDE THREE C❑PIES DETAIL PO IWH-1 CW/HW 416 W_ ]Loc-ust street <br /> —SD— STORM DRAIN LINE BFG BELOW FINISHED GRADE FROM AN INDEPENDENT TEST LAB. WATER SHALL BE TESTED FOR WATER BORNE AND GAS <br /> BACTERIUM, SPORIDIUM AND OTHER PATHOGENS AT THE TIME OF OCCUPANCY AND PIPING Lodi, California 95240 <br /> —C— CONDENSATE DRAIN MV MIXING VALVE CERTIFY THE SYSTEM PASSED THESE TESTS, MOUNT 48" <br /> AFF 209 200 2657 <br /> — MA— MEDICAL/DENTAL AIR WC WATER CLOSET TEST WATER LINES AT 1,5 TIMES WORKING PRESSURE FOR LEAKS, NOT TO EXCEED ' mtesarc <br /> dh mail.com <br /> —V — VACUUM UR URINAL <br /> 100 PSIG. HOLD PRESSURE FOR 24 HOURS. <br /> J �g <br /> V, VR, VTR VENT, VENT RISER, VENT THRU ROOF L LAVATORY SEWER AND RWL'S - ABS PIPE AND FITTINGS ABOVE AND BELOW GRADE, CI PIPE <br /> WITH ESCUTCHEONS WHERE PROHIBITED BY CODE AND THE LOCAL JURISDICTI❑N. 3/4" T&P INTEGRAL GAS DATE: 11/30/18 <br /> CLEAN❑UTS SHALL BE PROVIDED EVERY 100 FT AND AT EACH CHANGE ❑F DIRECTION—SSD — SANITARY SEWER DROP S SINK VALVE AND- <br /> GREATER THAT 909, USE OF ABS PIPE IS LIMITED TO BUILDINGS 2 OR LESS RELIEF FLEX ASSEMBLY DRAWN: TAG <br /> RWL RAIN WATER LEADER MS SERVICE/MOP SINK ST❑RIES IN HEIGHT AND CANNOT BE USED WITHIN FIRE RATED ASSEMBLIES, ALL SPILL TO <br /> SEWER LINES SHALL BE SLOPED AT A MINIMUM OF 1/4" PER 1', FS-1 <br /> RD ROOF DRAIN DF DRINKING FOUNTAIN � CHECKED: JDM/TES <br /> VENT LINES - SEE SEWER LINES, ZURN GT2700 SPECIFICATION SHEET 3/4" H&CW <br /> AD AREA DRAIN FHS FIRE HOSE STANDPIPE o „ <br /> GREASE INTERCEPTOR LINES TO GAS LINE - SEE REVISIONS: <br /> HVAC CONDENSATE DRAIN LINES - TYPE 'M' COPPER PIPE AND FITTINGS INSIDE TAG GT-1 ___ IWH-1 6 DRIP LEG PLAN IFORNE SIZES <br /> CB, DI CATCH BASIN (DROP INLET) INV INVERT ELEVATION BUILDING AND SCH 40 PVC PIPE OUTSIDE BUILDING, PROVIDE CLEANOUT AT EACH LINE SIZE AND ROUTING <br /> CO CLEAN OUT FG FINISH GRADE CHANGE OF DIRECTI❑N AND AT COIL C❑NNECTI❑N, SLOPE LINES AT 1/8" PER 1'. Dimensional Data(inches and[mm])are Subject to Manufacturing Tolerances and Change Without Notice <br /> I� WCO WALL CLEAN OUT CUT OFF POINT - COP TEST SS AND RWL'S DRAIN LINES PER SECTI❑N 702,2 AND 1106,2,2 RESPECTIVELY, IWH-1 PIPING DETAIL 2 <br /> TEST CONDENSATE DRAIN LINES USING SECTI❑N 1106,2,2 A B DETAIL P O <br /> FCO FLOOR CLEAN OUT Z POINT OF CONNECTION - POC B - <br /> GAS aI 7T <br /> YCO YARD CLEAN OUT AD ACCESS DOOR - SEE SCHEDULE FOR TYPES 5 PSI SERVICE - 2-1/2" AND SMALLER SHALL BE SCH 40 GI SCREWED PIPE AND PLUG 2" BELOW FINISH <br /> FITTINGS, 3" AND LARGER SHALL BE SCH 40 WELDED PIPE AND FITTINGS. C C GRADE OR FLOOR <br /> J I <br /> FD FLOOR DRAIN CI CAST IRON EXPOSED PIPE SHALL BE GALVANIZED, BURIED PIPE SHALL BE COVERED WITH D E <br /> FS FLOOR SINK CENTER LINE X-TRU COAT, ALL PIPE INSIDE BUILDING SHALL BE WELDED, ° E o` ROAD PAVEMENT WHERE <br /> 7" WC SERVICE - SCH 40 GALVANIZED IR❑N PIPE AND FITTINGS OUTSIDE APPLICABLE <br /> TP TRAP PRIMER VALVE HDR HEADER BUILDING AND SCH 40 BLACK IR❑N PIPE INSIDE BUILDING, PAINT WHERE EXPOSED 6" THICK 36" DIAMETER <br /> TO INTERI❑R FINISHES, L ONCRETE RING WITH <br /> CW, D, R — COLD WATER (DROP) (RISER) DN DOWN I F -� F 1-#4 BAR IN CENTER <br /> TEST 7-11" WC GAS AND LPG LINES USING AIR AT 15 PSIG. OBSERVE FOR 24 INLET G= WIDTH OF BODY OUTLET INLET C= WIDTH OF BODY OUTLET U <br /> HW,D,R,RT — HW SUPPLY (DROP) (RISER) (RETURN) MBH THOUSANDS OF BTU PER HOUR HOURS FOR LEAKAGE. TEST ALL GAS LINES WITH HIGHER PRESSURES THAN 11" WC CONCRETE BOX LABELED SEWER <br /> U <br /> AT 1,5 TIMES WORKING PRESSURE, MINIMUM PRESSURE OF 50 PSIG, HOLD TEST FOR - 'OR' <br /> THW —T — TEMPERED HOT WATER (115- F) NIPC NOT IN PLUMBING CONTRACT 24 HOURS. <br /> GT2700-4 through GT2700-50 GT2700-75&GT2700-1 00 BRASS CLEANOUT BOX <br /> — G, LPG — NATURAL GAS (PROPANE)<5PS1 HW HAND WASH STATION IN FINISHED FLOOR <br /> FIXTURES o <br /> — HPG — HIGH PRESSURE GAS(PROPANE) >5PS1 HS HOSE STATION ROUGH IN ALL ACCESSIBLE FIXTURES PER THE DETAILS FOUND IN CBC CHAPTER 11, 6"0 PVC SLEEVE WITH 4"0 o <br /> THE ARCHITECTURAL DRAWINGS AND LOCAL CODE REQUIREMENTS. NOTIFY ARCHITECT CLEANOUT RISER PIPE <br /> Model ABFlow Rate Ca acitY Dimension in Inches te- .16 <br /> — CA — COMPRESSED AIR HWG HOT WATER GENERATOR IN WRITING OF CONFLICTS, Inlet/Outlet G.P.M. Grease �j <br /> Number No-Hub C D/E F G <br /> HB HOSE BIBB BV BALL <5", BUTTERFLY >5" VALVE SUBMITTALS ___ C. <br /> GT2700-4 2 [51] 4[[15] Lbs. <br /> [4]] 10 [254] 7-1/4 [184] 16-3/8 [416] 9-7/8 [251] O c <br /> 2WAY Cl IAPMO �4 <br /> © <br /> UNDER PLUMBING CONTRACT —SCW SOFT COLD WATER LINE <br /> PR❑VIDE SEVEN SETS OF SUBMITTALS FOR REVIEW, ---GT2700-7 2 [51] 7 [26] 14 [6] 11-1/8 [283] 8-1/8 [206] 17-3/4 [451] 11-7/8 [302] APPROVED CLEANOUT �— 3 <br /> GT2700-10 2 [51] 10 [38] 20 [9] 11-3/4 [298] 8-1/4 [210] 19-3/4 [502] 14 [356] 1.4 <br /> INSTALLATI❑N --- INVERT — SEE PLAN <br /> SOV SHUT OFF VALVE — SHW — SOFT HOT WATER LINEGT2700-15 2 [51] 15 [57] 30 [14] 13-3/8 [340] 1 9-3/8 [238] 21-3/4 [552] 16-3/4 [425] a0 <br /> BRACE ALL PIPE AND DUCT SYSTEMS PER SMACNA SEISMIC RESTRAINT GUIDELINES --- FOR SIZES <br /> INCLUDING CHANGES OF DIRECTI❑N AND CHANGES IN ELEVATI❑N OF MORE THAN 10'. ___GT2700 20 3 [76] 20 [76] 40 [18] 15 [381] 11-3/4 [298] 24 5/8 [625] 17-1/4 [438] SEE PLUMBING FLOOR <br /> GT2700-25 3 [76] 25 [94] 50 [23] 17 [432] 12-7/16 [316] 26-5/8 [676] 19-7/8 [505] PLAN FOR SIZEw ° o <br /> CPVC INSTALLATI❑N ___GT27oo-35 4 [102] 35 [132] 70 [32] 18-3/4 [476] 14-3/16 [360] 28-1/2 [724] 22-1/2 [572] C) <br /> INSTALLATION OF CPUC FOR NEW AND REPLACEMENT SYSTEMS MUST COMPLY WITH ___GT2700-50 4 [102] 50 [189] 100 [45] 21-1/2 [546] 16 [406] 30-3/8 [772] 24-1/2 [622] [� o <br /> THE REQUIREMENTS AS STATED IN CHAPTER 6 AND INSTALLATI❑N STANDARDS IAPMO GT2700-75 4 [102] 75 [283] 150 [68] 22-3/4 [587] 18-1/2 [470] 40-1/4 [1022] 28-5/8 [727] 2 - WAY CLEANOUT <br /> IS-20-2005, ALL PROCEDURES MUST BE FOLLOWED FOR FLUSHING AND WORKERQ .3 <br /> GT2700-100 4 [102] 100 [379] 200 [91] 27 [685] 23 [584] 44 [1118] 33-5/8 [854] DETAIL ro <br /> ANYECONTRACTORS <br /> ORSAFTY MEASURE . ISUBCONTTRACT❑RHF❑UNDATOI HAVE FA STATEDNCLUDED AE TE PENLTES AS ED T❑ COMPLY W T H g), PO0 0 <br /> P O <br /> C. <br /> VENTILATION GLOVE OR FLUSHING REQUIREMENTS OF SECTI❑N 1,22 OF APPENDIX I GT2700Grease Interceptor <br /> f W U 0 <br /> OF THIS CODE, INSTALLATION STANDARDS FOR CPVC SOLVENT CEMENT HOT AND Recommended for removing and retaining grease from wastewater in kitchen and restaurant areas where food is prepared. o b <br /> COLD WATER DISTRIBUTION SYSTEMS. IAPMO IS-20-2005 SHALL BE SUBJECT TO THE Grease trap is corrosion-resistant coated fabricated steel with no-hub connections,flow diffusing baffle,integral trap,and 4 <br /> PENALTIES ON HEALTH AND SAFETY CODE, DIVISI❑N 13, PART 15 CHAPTER 6 vented inlet flow control device. <br /> SECTI❑N 17995, OPTIONS 1 - <br /> IN ADDITI❑N IF DURING THE CONDUCT OF ANY BUILDING INSPECTION, THE BUILDING ____ JP2700 6[152]Extension b <br /> OFFICIAL FINDS THAT THE VENTILATI❑N AND GLOVE REQUIREMENTS OF SECTI❑N 1,22 <br /> OF APPENDIX I OF THIS CODE, SPECIAL REQUIREMENTS FOR CPVC INSTALLATI❑N APPROVED ° <br /> WITHIN RESIDENTIAL BUILDINGS ARE BEING VIOLATED, BUILDING OFFICIAL SHALL Sizes 4-50 Sizes 20 G.P.M. -50 G.P.M. W o <br /> CITE THE CONTRACTOR OR SUBCONTRACTOR FOR THE VI❑LATI❑N UNDER THE Regularly furnished unless otherwise specified. o <br /> CALIFORNIA PLUMBING C❑DE, Zurn Industries, LLC I Light Commercial Plumbing Products ^ <br /> 1801 Pittsburgh Avenue,Erie,PA U.S.A.16502 Ph.855-663-9876,Fax 814-454-7929 Rev. C I� O2 o <br /> In Canada I Zurn Industries Limited Date: 2/15/2018 0b <br /> 3544 Nashua Drive,Mississauga,Ontario L4V 11_2 Ph.905-405-8272,Fax 905-405-1292 C.N. No. 139638 ��// c <br /> www.zurn.com Prod. I Dwg. No. GT2700 h--1 Z <br /> w 0 <br /> o <br /> STATE OF CALIFORNIA STATE OF CALIFORNIA Q, <br /> WATER HEATING SYSTEM GENERAL INFORMATION WATER HEATING SYSTEM GENERAL INFORMATION GT27OO GT27OO <br /> CEC-NRCC-PLB-01-E Revised 01/16 CALIFORNIA ENERGY COMMISSION CEC-NRCC-PLB-01-E Revised 01/16 CALIFORNIA ENERGY COMMISSION ~ <br /> CERTIFICATE OF COMPLIANCE NRCC PLB 01 E CERTIFICATE OF COMPLIANCE NRCC PLB 01 E . GREASE INTERCEPTOR INSTALLATION AND CLEANING INSTRUCTIONS GREASE INTERCEPTOR INSTALLATION AND CLEANING INSTRUCTIONS o <br /> Water Heating System General Information (Page 1 of 2) Water Heating System General Information (Page 2 of 2) <br /> �MMy <br /> Project Name: JAVA STOP Date Prepared: 1113012018 Project Name:JAVA STOP Date Prepared: 11/30/2018 u CL <br /> SINKS VENT ORIFICE VENT <br /> (AIR INTAKE) <br /> A.GENERAL INFORMATION/SYSTEM INFORMATION DOCUMENTATION AUTHOR'S DECLARATION STATEMENT MAINTENANCE <br /> 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. <br /> INLET OUTLET �{ <br /> 01 Water Heater System Name: Standard Gas Tankless Documentation Author Name: Documentation Author Signature: ^ r <br /> 02 Water Heater System Configuration: Non-Central ERIC GREGORY DAVIS FLOW CONTROL General Considerations <br /> VENT <br /> Company: Signature Date: <br /> 03 Water Heater System Type: GDMD Engineering, Inc 11/30/2018 <br /> To obtain optimum operating efficiency of a properly sized and installed PDI certified grease interceptor,a regular <br /> Address: CEA/HERS Certification Identification(if applicable) CLEANOUT <br /> 04 Building Type: 212 W PINE STREET STE 4 schedule of maintenance must be adhered to. o <br /> 05 Total Number of Water Heaters in Systems: City/State/Zip: Phone: ro <br /> Y 1 LODI, CA 95240 209 367 0899 <br /> OPTIONAL zuRN LIGHT Note: When cleaning grease interceptors of grease be careful to wear protective gear and/or use a professional <br /> 06 Central DHW Distribution Type: P—TRAP COMMERCIAL U <br /> YP n1a RESPONSIBLE PERSON'S DECLARATION STATEMENT S. SERIES z7oo cleaning service to remove and dispose of the grease. <br /> APPROVED FLOW INTERCEPTOR I'" <br /> 07 Dwelling Unit DHW Distribution Type: Standard I certify the following under penalty of perjury,under the laws of the State of California: <br /> 1. The information provided on this Certificate of Compliance is true and correct. Zurn Light Commercial Series Grease Interceptors GT2700 consist of a interceptor rated at m and a properly sized flow control fitting. <br /> 9 P P ( )9P P P Y 9 <br /> B.WATER HEATER INFORMATION 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design Cleaning <br /> Each water heater type requires a separate compliance document. identified on this Certificate of Compliance(responsible designer). INSTALLATION <br /> 3. The energy features and performance specifications,materials,components,and manufactured devices for the building design or 1. When installing Zurn Light Commercial Grease Interceptors use safety glasses,steel toed shoes,and gloves to All grease interceptors must be cleaned regularly. The frequency of grease removal is dependent upon the capacity of the <br /> 01 Water Heater Type: Small Instantaneous Gas system design identified on this Certificate of Compliance conform to the requirements of Title 24,Part 1 and Part 6 of the prevent injuries. Interceptors must be installed per these instructions to function properly. Any installations that do interceptor and the quantity of grease in waste water. Check interceptor daily until a grease level of 2"to 3"has been obtained <br /> 02 Fuel T e: Gas Fired California Code of Regulations. not comply with these instructions could cause the unit to malfunction and not work per its intended purpose. ARCHITECT <br /> Yp pY P P P (cleaning level).When the greaseremoval <br /> 03 Manufacture Name: 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the <br /> Standard Gas Tankless is necessary to maintain the rated efficiency of the interceptor. After the accumulated grease and waste material has been <br /> information provided on other applicable compliance documents,worksheets,calculations,plans and specifications submitted to 2. Zurn grease interceptors should be installed as close as possible to the fixture being served. The interceptor may be removed, the interceptor should be thoroughly checked to make certain the inlet, outlet, and air relief ports are clear of <br /> 04 Model Number: the enforcement agency for approval with this building permit application. P 9 Y <br /> 05 Number of Identical Water Heaters: 1 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) placed on the floor,partially recessed in the floor,or recessed with top flush with the floor. The elevation of the inlet of obstructions. SE D ARC Al <br /> the grease interceptor must be located below the horizontal piping coming from the fixture that the interceptor is / <br /> System Efficiency: issued for the building,and made available to the enforcement agency for all applicable inspections.I understand that a completed � u 1A.06 Installed Water Heater S <br /> Y y: 0.82 signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building Servicing. Please follow the Steps below when cleaning. V � jn 1 <br /> 07 Required Minimum Efficiency: 0,82 owner at occupancy. '! <br /> 08 Standby Loss Percent or Standby Loss Total: 0.000 <br /> Responsible Designer Name: GREG DAVIS Remove e center ane assembly.Responsible Designer Signature: 3. Always install where there is easy access for cover removal and cleaning. If unit has a removable baffle the clearances 1. Rthe 3/8"Allen bolt lift handle _J —4 <br /> � 70 <br /> above the interceptor must be greater than the height of the internal removable baffle of the unit to accommodate 2. Remove cover. <br /> 09 Rated Input: 199,000 Company: GDMD ENGINEERING, INC. Date signed: removing the cover and baffle for cleaning. Measure overall height of internal removable baffle to determine reference 3. Clean out remaining grease. Signature <br /> 10 Pilot Energy: Address: 212 W PINE ST,STE 4 M29759 un waterinterceptorClean outouchamber y removing cleanoutug anspraying water C-19 57 <br /> 11 Water Heater Tank Storage Volume: 1 needs to be enough to allow easy access into unit for cleaning. down inside. P' <br /> 12,31/19 <br /> City/State/Zip: Phone: Ex <br /> 12 Exterior Insulation on Water Heater: 0 LODI, CA 95240 209-367-0899 5. Inspect cover gasket and replace as needed. <br /> 4. A flow control must be installed as close as possible to the underside of the fixture. The flow control must be installed 6. Replace cover and secure the 3/8"Allen bolt lift handle assembly. �rF \FOS <br /> 13 Volume of Supplemental Storage: with the vent or(air intake)on the downstream side of the orifice plate. The vent connection is positioned to the top of F CA <br /> 14 Internal Insulation on Supplemental Storage: the flow control fitting and piped upward higher than source of water,or to building vent system. <br /> 15 Exterior Insulation on Supplemental Storage: <br /> 5. It is recommended that a cleanout tee be installed before the flow control to access the flow control orifice and clear CONSULTANT <br /> 1 <br /> C.PLUMBING COMPLIANCE FORMS&WORKSHEETS debris. <br /> Check box if worksheet is included. 6. The cleanout plug should be installed over the outlet of the interceptor. C3S�ONAL <br /> F� <br /> For detailed instructions on the use of this and all Energy Standards compliance documents,refer to the 2016 Nonresidential Manual �� �G G. C/ <br /> q.L 2 <br /> Note:The Enforcement Agency may require all compliance documents to be incorporated onto the building plans. 7. The Interceptor IS t0 be Installed using n0-hub Couplings. � <br /> YES NO Doc/Worksheet# Title <br /> ❑ NRCC PLB 01 E Certificate of Compliance,Declaration.Required on plans for all submittals. 8. Outlet piping should be connected to the sanitary drain,and pipe size should be equal to or larger than the inlet piping. <br /> Outlet pipe should also be vented so the interceptor is not siphoned. Nb.' M29759 <br /> ❑ NRCI-PLB-01-E Certificate of Installation.Required on plans for all submittals. REN. 6-30-20v Q <br /> ❑ ❑ NRCI-PLB-02-E Certificate of Installation,required on central systems in high-rise residential, 9. Solid waste should not go into an interceptor. Food grinder waste and other solids should be captured in the sink or by -y� <br /> hotel/motel application. a solids interceptor before reaching the grease interceptor. It, CNA N\ <br /> ❑ ❑ NRCI-PLB-03-E Certificate of Installation,required on single dwelling unit systems in high-rise OF C P�'\ <br /> residential,hotel/motel application. Caution: Grease Interceptors are tested and rated using a vented flow control with a properly sized orifice. Failure to use <br /> ❑ ❑ NRCI-PLB-21-H Certificate of Installation,required on HERS verified central systems in high-rise the vented flow control with properly sized orifice that is provided with the unit will result in improper function and <br /> residential,hotel/motel application. performance. This could cause grease to bypass the unit. <br /> Certificate of Installation,required on HERS verified single dwelling unit systems in high- PRINT DATE: I I DECEMBER 2018 <br /> ❑ ❑ NRCI-PLB-22-H rise residential,hotel/motel application. 1WARNING:Cancer and Reproductive Harm-www.P65Warnings.ca.gov <br /> ❑ ❑ NRCI-STH-01-E lCertificate of Installation,required on any solar water heating QADVERTENCIA:Cancery dano reproductivo-www.P65Warnings.ca.gov <br /> 0 AVERTISSEMENT:Cancer et effets nefastes sur la reproduction-www.P65Warnings.c2.g0v SHEET NO. <br /> Zurn Industries, LLC I Specification Drainage Operation Rev. H Page 1 of 2 Zurn Industries, LLC I Specification Drainage Operation Rev. H Page 2 Of 2 <br /> 1801 Pittsburgh Avenue,Erie,PA U.S.A.16502 Ph.855-663-9876,Fax 814-454-7929 1801 Pittsburgh Avenue,Erie,PA U.S.A.16502 Ph.855-663-9876,Fax 814-454-7929 <br /> In Canada Date: 5/3/2018 Zurn Industries Limited In Canada I Zurn Industries Limited Date: 5/3/2018 <br /> CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 3544 Nashua Drive,Mississauga,Ontario L4V 1L2 Ph.905-405-8272,Fax 905-405-1292 C.N. No. 139950 3544 Nashua Drive,Mississauga,Ontario L4V 11_2 Ph.905-405-8272,Fax 905-405-1292 C.N. No. 139950 JOB # 2018-132 <br /> www.zurn.com Prod. GT2700 I Form No.JS2 www.zurn.com Prod.GT2700 I Form No.JS2 <br /> GDMD ENGINEERING, INC <br /> Mechanical and Safety Engineers <br /> 212 W Pine St, Ste 4 <br /> Lodi, Ca 95242 <br /> Ph 209-367-0899 <br /> Fax 209-367-0898 Z <br /> E-mail:gdmdengrinc@sbcglobal.net <br />