Laserfiche WebLink
uality Control Board <br /> California �.egional Water Q <br /> Central Valley Region . <br /> Katherine Hart, Chair <br /> RFr-RVED Ar�o <br /> Arnold <br /> Linda S. Adams 11020 Sun Center Drive#200,Rancho Cordova, California 95670-6114 Schwarzenegger <br /> Secretary for Phone(916)464-3291 •FAX(916)464-4645 t:i 0 2 4 2010 Governor <br /> Environmental http://www.waterboards.ca.gov/centralvalley <br /> Protection <br /> ENVIRONMENTAL HEALTH <br /> PERMInEMNgRlber 2010 <br /> David J. Vossler <br /> Winzler & Kelly <br /> 3410 Industrial Boulevard, Suite 102 <br /> West Sacramento, CA 95691 <br /> APPROVAL OF ESTIMATED CONTRACTOR/CONSULTANT BUDGET FOR EAR <br /> ACCOUNT CASE # R03-085, FRANKS ONE STOP/SAN JO(G)UINTA AQUIN COUNTYPRISES, <br /> 2072 WEST YOSEMITE AVENUE, MANTECA <br /> I reviewed Cost Proposal for the Continued Groundwater Investigation, Six Quarters of <br /> Monitoring and Sampling of the Site Wells and Operation and Maintenance of Nine Domestic <br /> Wellhead Treatment Systems associated with One Stop O October 201)0 from West Yosemite <br /> W nzler & Kelly <br /> Avenue, Manteca, California (Cost Proposal), received <br /> (W & K). An electronic copy of the Cost Proposal is available by email attachment upon <br /> request. <br /> The Cost Proposal includes 6 quarters of routine quarterly groundwater monitoring of wells <br /> onsite (monitoring, remediation) and offsite (domestic and monitoring), including the 9 <br /> domestic well water treatment systems, routine maintenance of the domestic well carbon <br /> treatment systems, and a groundwater plume investigation for installation of 19 new <br /> monitoring wells, to delineate the vertical and lateral extent of the contamination. Due to <br /> Emergency, Abandoned, and Recalcitrant (EAR) Account budgetary constraints, work will <br /> resume during the 4th quarter of 2010, and continue through the 1St quarter of 2012. Total cost <br /> for the next six quarters of work is estimated as $315,931.00. The remaining funds available <br /> for the life cycle of the project are $532,303.13. <br /> Based on my review, I find the proposed costs reasonable and acceptable. Please note that <br /> the above costs do not include monitoring and maintenancethe <br /> with quarter <br /> er 2012, <br /> ure (closure <br /> additional remediation (if deemed necessary), and costs associated <br /> report, public participation, well abandonment) later in the project. <br /> Please contact me by phone at (916) 464-4614 or by email atjbarton(ct�waterboards.ca.gov if <br /> y u have questions or comments. <br /> /James L.L. Barton, P.G. <br /> ,/Engineering Geologist <br /> UST Enforcement Unit II <br /> cc: Adrienne Ellsaesser, San Joaquin County Environmental Health Department, Stockton <br /> Pearl Cross, State Water Resources Control Board, UST Cleanup <br /> Fund <br /> Conrad Lewis, DGS, Real Estate Division, 707 3rd St., West Sacramento 95605 <br /> California Environmental Protection Agency <br /> (a Recycled Paper <br />